Status

Status Videos – June 2022

Tranquil : Southeast Elevation - Status as of February 2024

Tranquil : Southeast Elevation - Status as of February 2024

Tranquil : External painting works in progress - Status as of February 2024

Tranquil : External painting works in progress - Status as of February 2024

Tranquil : OWC room flooring and blockwork completed - Status as of February 2024

Tranquil : OWC room flooring and blockwork completed - Status as of February 2024

Tranquil : Internal Flats QA works in progress - Status as of February 2024

Tranquil : Internal Flats QA works in progress - Status as of February 2024

Tranquil : Internal Flats QA works in progress - Status as of February 2024

Tranquil : Internal Flats QA works in progress - Status as of February 2024

Tranquil : Landscape terrace - Status as of February 2024

Tranquil : Landscape terrace - Status as of February 2024

Paradise : External painting works in progress - Status as of February 2024

Paradise : External painting works in progress - Status as of February 2024

Paradise : PHE fixtures fixing and wall painting works in progress - Status as of February 2024

Paradise : PHE fixtures fixing and wall painting works in progress - Status as of February 2024

Paradise : External plastering works in progress - Status as of February 2024

Paradise : External plastering works in progress - Status as of February 2024

Utopia Paradise Towers F & H : Commencement of Painting 9<sup>th</sup> to 17<sup>th</sup> floor – Status as on 7<sup>th</sup> February 2024

Utopia Paradise Towers F & H : Commencement of Painting 9th to 17th floor – Status as on 7th February 2024

Utopia Paradise Towers F & H : Commencement of Painting 9<sup>th</sup> to 17<sup>th</sup> floor – Status as on 7<sup>th</sup> February 2024

Utopia Paradise Towers F & H : Commencement of Painting 9th to 17th floor – Status as on 7th February 2024

Utopia Paradise Towers F & H : Commencement of Painting 9<sup>th</sup> to 17<sup>th</sup> floor – Status as on 7<sup>th</sup> February 2024

Utopia Paradise Towers F & H : Commencement of Painting 9th to 17th floor – Status as on 7th February 2024

Utopia Paradise Towers F & H : Commencement of Painting 9<sup>th</sup> to 17<sup>th</sup> floor – Status as on 7<sup>th</sup> February 2024

Utopia Paradise Towers F & H : Commencement of Painting 9th to 17th floor – Status as on 7th February 2024

Utopia Paradise Towers F & H : Commencement of Painting 9<sup>th</sup> to 17<sup>th</sup> floor – Status as on 7<sup>th</sup> February 2024

Utopia Paradise Towers F & H : Commencement of Painting 9th to 17th floor – Status as on 7th February 2024

Utopia Paradise Towers F & H : Commencement of Painting 9<sup>th</sup> to 17<sup>th</sup> floor – Status as on 7<sup>th</sup> February 2024

Utopia Paradise Towers F & H : Commencement of Painting 9th to 17th floor – Status as on 7th February 2024

Halcyon : North-West Elevation - Status as of January 2024

Halcyon : North-West Elevation - Status as of January 2024

Halcyon : West Elevation - Status as of January 2024

Halcyon : West Elevation - Status as of January 2024

Paradise : Structure works in progress - Status as of January 2024

Paradise : Structure works in progress - Status as of January 2024

Paradise : Podium slab works in progress - Status as of January 2024

Paradise : Podium slab works in progress - Status as of January 2024

Paradise : Doors, Windows, Railing and shaft door fixing in progress - Status as of January 2024

Paradise : Doors, Windows, Railing and shaft door fixing in progress - Status as of January 2024

Paradise : QA Certification works in progress - Status as of January 2024

Paradise : QA Certification works in progress - Status as of January 2024

Tranquil : Podium waterproofing/screed works completed and Landscape works in progress - Status as of January 2024

Tranquil : Podium waterproofing/screed works completed and Landscape works in progress - Status as of January 2024

Tranquil : External painting works in progress - Status as of January 2024

Tranquil : External painting works in progress - Status as of January 2024

Tranquil : External painting works in progress - Status as of January 2024

Tranquil : External painting works in progress - Status as of January 2024

Paradise : Structure works in progress - Status as of December 2023

Paradise : Structure works in progress - Status as of December 2023

Paradise : Podium slab works in progress - Status as of December 2023

Paradise : Podium slab works in progress - Status as of December 2023

Paradise Tower G : BA units Above terrace works in progress - Status as of December 2023

Paradise Tower G : BA units Above terrace works in progress - Status as of December 2023

Paradise Tower I : BA units Swimming pool works in progress - Status as of December 2023

Paradise Tower I : BA units Swimming pool works in progress - Status as of December 2023

Paradise Tower K : BA units structure works in progress - Status as of December 2023

Paradise Tower K : BA units structure works in progress - Status as of December 2023

Paradise Tower L : BA units structure works completed and Finishing works in progress - Status as of December 2023

Paradise Tower L : BA units structure works completed and Finishing works in progress - Status as of December 2023

Paradise Tower K : BA units structure works in progress – Status as on 31<sup>st</sup> December 2023

Paradise Tower K : BA units structure works in progress – Status as on 31st December 2023

Paradise Tower I : BA units Swimming pool works in progress – Status as on 31<sup>st</sup> December 2023

Paradise Tower I : BA units Swimming pool works in progress – Status as on 31st December 2023

Paradise Tower G : BA units Above terrace works in progress – Status as on 31<sup>st</sup> December 2023

Paradise Tower G : BA units Above terrace works in progress – Status as on 31st December 2023

Paradise : Podium slab works in progress – Status as on 31<sup>st</sup> December 2023

Paradise : Podium slab works in progress – Status as on 31st December 2023

Paradise : Structure works in progress – Status as on 31<sup>st</sup> December 2023

Paradise : Structure works in progress – Status as on 31st December 2023

Halcyon Corridor : QA Certification Works in progress – Status as on 31<sup>st</sup> December 2023

Halcyon Corridor : QA Certification Works in progress – Status as on 31st December 2023

Halcyon Staircase : QA Certification Works in progress – Status as on 31<sup>st</sup> December 2023

Halcyon Staircase : QA Certification Works in progress – Status as on 31st December 2023

Halcyon : West Elevation – Status as on 31<sup>st</sup> December 2023

Halcyon : West Elevation – Status as on 31st December 2023

Tranquil : Internal units QA certification works in progress – Status as on 31<sup>st</sup> December 2023

Tranquil : Internal units QA certification works in progress – Status as on 31st December 2023

Tranquil : External painting works in progress – Status as on 31<sup>st</sup> December 2023

Tranquil : External painting works in progress – Status as on 31st December 2023

Tranquil : Podium waterproofing and screed works in progress – Status as on 31<sup>st</sup> December 2023

Tranquil : Podium waterproofing and screed works in progress – Status as on 31st December 2023

Utopia Paradise Towers H and F : Milestone Release Fixing of Doors and Windows – Status as on 8<sup>th</sup> December 2023

Utopia Paradise Towers H and F : Milestone Release Fixing of Doors and Windows – Status as on 8th December 2023

Utopia Paradise Towers H and F : Milestone Release Fixing of Doors and Windows – Status as on 8<sup>th</sup> December 2023

Utopia Paradise Towers H and F : Milestone Release Fixing of Doors and Windows – Status as on 8th December 2023

Utopia Paradise Towers H and F : Milestone Release Fixing of Doors and Windows – Status as on 8<sup>th</sup> December 2023

Utopia Paradise Towers H and F : Milestone Release Fixing of Doors and Windows – Status as on 8th December 2023

Utopia Paradise Towers H and F : Milestone Release Fixing of Doors and Windows – Status as on 8<sup>th</sup> December 2023

Utopia Paradise Towers H and F : Milestone Release Fixing of Doors and Windows – Status as on 8th December 2023

Utopia Paradise Tower L : Milestone Release On Casting of Terrace Slab – Status as on 24<sup>nd</sup> November 2023

Utopia Paradise Tower L : Milestone Release On Casting of Terrace Slab – Status as on 24nd November 2023

Utopia Tranquil Tower M : Milestone Release Commencement of fixing of d & w-18 to 26<sup>th</sup> Floor – Status as on 22<sup>nd</sup> November 2023

Utopia Tranquil Tower M : Milestone Release Commencement of fixing of d & w-18 to 26th Floor – Status as on 22nd November 2023

Utopia Tranquil Tower M : Milestone Release Commencement of fixing of d & w-18 to 26<sup>th</sup> Floor – Status as on 22<sup>nd</sup> November 2023

Utopia Tranquil Tower M : Milestone Release Commencement of fixing of d & w-18 to 26th Floor – Status as on 22nd November 2023

Utopia Tranquil Tower M : Milestone Release Commencement of fixing of d & w-18 to 26<sup>th</sup> Floor – Status as on 22<sup>nd</sup> November 2023

Utopia Tranquil Tower M : Milestone Release Commencement of fixing of d & w-18 to 26th Floor – Status as on 22nd November 2023

Utopia Tranquil Tower O : Milestone Release Commencement of fixing of d & w-18 to 26<sup>th</sup> Floor – Status as on 11<sup>th</sup> November 2023

Utopia Tranquil Tower O : Milestone Release Commencement of fixing of d & w-18 to 26th Floor – Status as on 11th November 2023

Utopia Tranquil Tower O : Milestone Release Commencement of fixing of d & w-18 to 26<sup>th</sup> Floor – Status as on 11<sup>th</sup> November 2023

Utopia Tranquil Tower O : Milestone Release Commencement of fixing of d & w-18 to 26th Floor – Status as on 11th November 2023

Utopia Tranquil Tower O : Milestone Release Commencement of fixing of d & w-18 to 26<sup>th</sup> Floor – Status as on 11<sup>th</sup> November 2023

Utopia Tranquil Tower O : Milestone Release Commencement of fixing of d & w-18 to 26th Floor – Status as on 11th November 2023

Utopia Tranquil Tower O : Milestone Release Commencement of fixing of d & w-18 to 26<sup>th</sup> Floor – Status as on 11<sup>th</sup> November 2023

Utopia Tranquil Tower O : Milestone Release Commencement of fixing of d & w-18 to 26th Floor – Status as on 11th November 2023

Utopia Tranquil Tower O : Milestone Release Commencement of fixing of d & w-18 to 26<sup>th</sup> Floor – Status as on 11<sup>th</sup> November 2023

Utopia Tranquil Tower O : Milestone Release Commencement of fixing of d & w-18 to 26th Floor – Status as on 11th November 2023

Serene : West View - Status as of November 2023

Serene : West View - Status as of November 2023

Serene : East Garden View - Status as of November 2023

Serene : East Garden View - Status as of November 2023

Serene : CA area (sports area) structure works in progress - Status as of November 2023

Serene : CA area (sports area) structure works in progress - Status as of November 2023

Serene : Badminton Court flooring works in progress - Status as of November 2023

Serene : Badminton Court flooring works in progress - Status as of November 2023

Eden : South and West Elevation - Status as of November 2023

Eden : South and West Elevation - Status as of November 2023

Eden : Corridor QA certification works in progress - Status as of November 2023

Eden : Corridor QA certification works in progress - Status as of November 2023

Eden : Staircase QA certification works in progress - Status as of November 2023

Eden : Staircase QA certification works in progress - Status as of November 2023

Eden : North Central Spine - Status as of November 2023

Eden : North Central Spine - Status as of November 2023

Eden : Mia-waki - Status as of November 2023

Eden : Mia-waki - Status as of November 2023

Halcyon : East Elevation - Status as of November 2023

Halcyon : East Elevation - Status as of November 2023

Halcyon : Staircase – Readiness for QA Certification Works in progress - Status as of November 2023

Halcyon : Staircase – Readiness for QA Certification Works in progress - Status as of November 2023

Halcyon : Corridor – Readiness for QA Certification Works in progress - Status as of November 2023

Halcyon : Corridor – Readiness for QA Certification Works in progress - Status as of November 2023

Paradise : Structure works in progress - Status as of November 2023

Paradise : Structure works in progress - Status as of November 2023

Paradise : Podium slab works in progress - Status as of November 2023

Paradise : Podium slab works in progress - Status as of November 2023

Paradise Tower G : BA units structure works in progress - Status as of November 2023

Paradise Tower G : BA units structure works in progress - Status as of November 2023

Paradise Tower K : BA units structure works in progress - Status as of November 2023

Paradise Tower K : BA units structure works in progress - Status as of November 2023

Paradise Tower I : BA units structure works in progress - Status as of November 2023

Paradise Tower I : BA units structure works in progress - Status as of November 2023

Tranquil : Podium waterproofing and screed works in progress - Status as of November 2023

Tranquil : Podium waterproofing and screed works in progress - Status as of November 2023

Tranquil : Podium upstand RC works in progress - Status as of November 2023

Tranquil : Podium upstand RC works in progress - Status as of November 2023

Tranquil : External painting works in progress - Status as of November 2023

Tranquil : External painting works in progress - Status as of November 2023

Tranquil : Internal units QA certification works in progress - Status as of November 2023

Tranquil : Internal units QA certification works in progress - Status as of November 2023

Utopia Tranquil Tower M : Milestone Release - On Commencement of Painting Works 18 to 26<sup>th</sup> floor – Status as on 10<sup>th</sup> October 2023

Utopia Tranquil Tower M : Milestone Release - On Commencement of Painting Works 18 to 26th floor – Status as on 10th October 2023

Utopia Tranquil Tower M : Milestone Release - On Commencement of Painting Works 18 to 26<sup>th</sup> floor – Status as on 10<sup>th</sup> October 2023

Utopia Tranquil Tower M : Milestone Release - On Commencement of Painting Works 18 to 26th floor – Status as on 10th October 2023

Utopia Tranquil Tower M : Milestone Release - On Commencement of Painting Works 18 to 26<sup>th</sup> floor – Status as on 10<sup>th</sup> October 2023

Utopia Tranquil Tower M : Milestone Release - On Commencement of Painting Works 18 to 26th floor – Status as on 10th October 2023

Utopia Paradise Tower K : Milestone Release On Casting of 8<sup>th</sup> Floor Slab – Status as on 11<sup>th</sup> October 2023

Utopia Paradise Tower K : Milestone Release On Casting of 8th Floor Slab – Status as on 11th October 2023

Serene : North West Elevation - Status as of October 2023

Serene : North West Elevation - Status as of October 2023

Serene : South-west View - Status as of October 2023

Serene : South-west View - Status as of October 2023

Serene : East side View - Status as of October 2023

Serene : East side View - Status as of October 2023

Serene : CA area (Sports area) structure works in progress - Status as of October 2023

Serene : CA area (Sports area) structure works in progress - Status as of October 2023

Serene : East Garden area compound wall works in progress - Status as of October 2023

Serene : East Garden area compound wall works in progress - Status as of October 2023

Eden : South and West Elevation - Status as of October 2023

Eden : South and West Elevation - Status as of October 2023

Eden : Corridor QA certification works in progress - Status as of October 2023

Eden : Corridor QA certification works in progress - Status as of October 2023

Eden : Staircase QA certification works in progress - Status as of October 2023

Eden : Staircase QA certification works in progress - Status as of October 2023

Eden : Terrace QA certification works in progress - Status as of October 2023

Eden : Terrace QA certification works in progress - Status as of October 2023

Eden : North Central Spine - Status as of October 2023

Eden : North Central Spine - Status as of October 2023

Halcyon : East/North Elevation - Status as of October 2023

Halcyon : East/North Elevation - Status as of October 2023

Halcyon : Staircase – Readiness for QA Certification Works in progress - Status as of October 2023

Halcyon : Staircase – Readiness for QA Certification Works in progress - Status as of October 2023

Halcyon : Corridor – Readiness for QA Certification Works in progress - Status as of October 2023

Halcyon : Corridor – Readiness for QA Certification Works in progress - Status as of October 2023

Tranquil : Podium waterproofing and screed works in progress - Status as of October 2023

Tranquil : Podium waterproofing and screed works in progress - Status as of October 2023

Tranquil : Podium upstand RC works in progress - Status as of October 2023

Tranquil : Podium upstand RC works in progress - Status as of October 2023

Tranquil : External painting works in progress - Status as of October 2023

Tranquil : External painting works in progress - Status as of October 2023

Tranquil : Entrance lobby Glazing works in progress - Status as of October 2023

Tranquil : Entrance lobby Glazing works in progress - Status as of October 2023

Paradise : Structure works in progress - Status as of October 2023

Paradise : Structure works in progress - Status as of October 2023

Paradise : Podium slab works in progress - Status as of October 2023

Paradise : Podium slab works in progress - Status as of October 2023

Paradise : Tower G – BA units structure works in progress - Status as of October 2023

Paradise : Tower G – BA units structure works in progress - Status as of October 2023

Paradise : Tower K – BA units structure works in progress - Status as of October 2023

Paradise : Tower K – BA units structure works in progress - Status as of October 2023

Paradise : Tower I – BA units structure works in progress - Status as of October 2023

Paradise : Tower I – BA units structure works in progress - Status as of October 2023

Utopia Tranquil Tower O : Milestone Release On Commencement of Painting 18<sup>th</sup> to 26<sup>th</sup> Floor – Status as on 27<sup>th</sup> September 2023

Utopia Tranquil Tower O : Milestone Release On Commencement of Painting 18th to 26th Floor – Status as on 27th September 2023

Utopia Tranquil Tower N : Milestone Release – On Commencement of Painting 18<sup>th</sup> to 26<sup>th</sup> Floor – Status as on 23<sup>rd</sup> September 2023

Utopia Tranquil Tower N : Milestone Release – On Commencement of Painting 18th to 26th Floor – Status as on 23rd September 2023

Utopia Tranquil Tower N : Milestone Release – On Commencement of Painting 18<sup>th</sup> to 26<sup>th</sup> Floor – Status as on 23<sup>rd</sup> September 2023

Utopia Tranquil Tower N : Milestone Release – On Commencement of Painting 18th to 26th Floor – Status as on 23rd September 2023

Utopia Tranquil Tower N : Milestone Release – On Commencement of Painting 18<sup>th</sup> to 26<sup>th</sup> Floor – Status as on 23<sup>rd</sup> September 2023

Utopia Tranquil Tower N : Milestone Release – On Commencement of Painting 18th to 26th Floor – Status as on 23rd September 2023

Utopia Tranquil Tower L : Building (UT 05) Milestone Update On Commencement of Painting Works - 18 to 23 FL – Status as on 22<sup>nd</sup> September 2023

Utopia Tranquil Tower L : Building (UT 05) Milestone Update On Commencement of Painting Works - 18 to 23 FL – Status as on 22nd September 2023

Utopia Tranquil Tower L : Building (UT 05) Milestone Update On Commencement of Painting Works - 18 to 23 FL – Status as on 22<sup>nd</sup> September 2023

Utopia Tranquil Tower L : Building (UT 05) Milestone Update On Commencement of Painting Works - 18 to 23 FL – Status as on 22nd September 2023

Utopia Tranquil Tower L : Building (UT 05) Milestone Update On Commencement of Painting Works - 18 to 23 FL – Status as on 22<sup>nd</sup> September 2023

Utopia Tranquil Tower L : Building (UT 05) Milestone Update On Commencement of Painting Works - 18 to 23 FL – Status as on 22nd September 2023

Utopia Paradise Tower K : Milestone Release On Casting of 6<sup>th</sup> to 7<sup>th</sup> Floor Slab – Status as on 20<sup>th</sup> September 2023

Utopia Paradise Tower K : Milestone Release On Casting of 6th to 7th Floor Slab – Status as on 20th September 2023

Utopia Paradise Tower F : Milestone Release On commencement of flooring - 9<sup>th</sup> to 17<sup>th</sup> Floor – Status as on 16<sup>th</sup> September 2023

Utopia Paradise Tower F : Milestone Release On commencement of flooring - 9th to 17th Floor – Status as on 16th September 2023

Utopia Paradise Tower F : Milestone Release On commencement of flooring - 9<sup>th</sup> to 17<sup>th</sup> Floor – Status as on 16<sup>th</sup> September 2023

Utopia Paradise Tower F : Milestone Release On commencement of flooring - 9th to 17th Floor – Status as on 16th September 2023

Utopia Paradise Tower F : Milestone Release On commencement of flooring - 9<sup>th</sup> to 17<sup>th</sup> Floor – Status as on 16<sup>th</sup> September 2023

Utopia Paradise Tower F : Milestone Release On commencement of flooring - 9th to 17th Floor – Status as on 16th September 2023

Utopia Paradise Tower F : Milestone Release On commencement of flooring - 9<sup>th</sup> to 17<sup>th</sup> Floor – Status as on 16<sup>th</sup> September 2023

Utopia Paradise Tower F : Milestone Release On commencement of flooring - 9th to 17th Floor – Status as on 16th September 2023

Utopia Paradise Tower F : Milestone Release On commencement of flooring - 9<sup>th</sup> to 17<sup>th</sup> Floor – Status as on 16<sup>th</sup> September 2023

Utopia Paradise Tower F : Milestone Release On commencement of flooring - 9th to 17th Floor – Status as on 16th September 2023

Utopia Paradise Tower F : Milestone Release On commencement of flooring - 9<sup>th</sup> to 17<sup>th</sup> Floor – Status as on 16<sup>th</sup> September 2023

Utopia Paradise Tower F : Milestone Release On commencement of flooring - 9th to 17th Floor – Status as on 16th September 2023

Utopia Paradise Tower H : Milestone Release On commencement of flooring - 9<sup>th</sup> to 17<sup>th</sup> Floor – Status as on 16<sup>th</sup> September 2023

Utopia Paradise Tower H : Milestone Release On commencement of flooring - 9th to 17th Floor – Status as on 16th September 2023

Utopia Paradise Tower H : Milestone Release On commencement of flooring - 9<sup>th</sup> to 17<sup>th</sup> Floor – Status as on 16<sup>th</sup> September 2023

Utopia Paradise Tower H : Milestone Release On commencement of flooring - 9th to 17th Floor – Status as on 16th September 2023

Utopia Paradise Tower H : Milestone Release On commencement of flooring - 9<sup>th</sup> to 17<sup>th</sup> Floor – Status as on 16<sup>th</sup> September 2023

Utopia Paradise Tower H : Milestone Release On commencement of flooring - 9th to 17th Floor – Status as on 16th September 2023

Utopia Paradise Tower H : Milestone Release On commencement of flooring - 9<sup>th</sup> to 17<sup>th</sup> Floor – Status as on 16<sup>th</sup> September 2023

Utopia Paradise Tower H : Milestone Release On commencement of flooring - 9th to 17th Floor – Status as on 16th September 2023

Utopia Paradise Tower J : Milestone Release On commencement of flooring - 9<sup>th</sup> to 17<sup>th</sup> Floor – Status as on 16<sup>th</sup> September 2023

Utopia Paradise Tower J : Milestone Release On commencement of flooring - 9th to 17th Floor – Status as on 16th September 2023

Utopia Paradise Tower J : Milestone Release On commencement of flooring - 9<sup>th</sup> to 17<sup>th</sup> Floor – Status as on 16<sup>th</sup> September 2023

Utopia Paradise Tower J : Milestone Release On commencement of flooring - 9th to 17th Floor – Status as on 16th September 2023

Utopia Paradise Tower L : Milestone Release On commencement of flooring - 9<sup>th</sup> to 17<sup>th</sup> Floor – Status as on 16<sup>th</sup> September 2023

Utopia Paradise Tower L : Milestone Release On commencement of flooring - 9th to 17th Floor – Status as on 16th September 2023

Utopia Paradise Tower L : Milestone Release On commencement of flooring - 9<sup>th</sup> to 17<sup>th</sup> Floor – Status as on 16<sup>th</sup> September 2023

Utopia Paradise Tower L : Milestone Release On commencement of flooring - 9th to 17th Floor – Status as on 16th September 2023

Utopia Paradise Tower L : Milestone Release On commencement of flooring - 9<sup>th</sup> to 17<sup>th</sup> Floor – Status as on 16<sup>th</sup> September 2023

Utopia Paradise Tower L : Milestone Release On commencement of flooring - 9th to 17th Floor – Status as on 16th September 2023

Utopia Paradise Tower L : Milestone Release On commencement of flooring - 9<sup>th</sup> to 17<sup>th</sup> Floor – Status as on 16<sup>th</sup> September 2023

Utopia Paradise Tower L : Milestone Release On commencement of flooring - 9th to 17th Floor – Status as on 16th September 2023

Utopia Paradise Tower L : Milestone Release On commencement of flooring - 9<sup>th</sup> to 17<sup>th</sup> Floor – Status as on 16<sup>th</sup> September 2023

Utopia Paradise Tower L : Milestone Release On commencement of flooring - 9th to 17th Floor – Status as on 16th September 2023

Utopia Tranquil Tower L : Milestone Release On Commencement of fixing of d & w-18 to 26<sup>th</sup> Floor – Status as on 9<sup>th</sup> September 2023

Utopia Tranquil Tower L : Milestone Release On Commencement of fixing of d & w-18 to 26th Floor – Status as on 9th September 2023

Utopia Tranquil Tower L : Milestone Release On Commencement of fixing of d & w-18 to 26<sup>th</sup> Floor – Status as on 9<sup>th</sup> September 2023

Utopia Tranquil Tower L : Milestone Release On Commencement of fixing of d & w-18 to 26th Floor – Status as on 9th September 2023

Utopia Tranquil Tower L : Milestone Release On Commencement of fixing of d & w-18 to 26<sup>th</sup> Floor – Status as on 9<sup>th</sup> September 2023

Utopia Tranquil Tower L : Milestone Release On Commencement of fixing of d & w-18 to 26th Floor – Status as on 9th September 2023

Utopia Tranquil Tower M : Milestone Release On Commencement of flooring 18<sup>th</sup> to 26<sup>th</sup> Floor – Status as on 6<sup>th</sup> September 2023

Utopia Tranquil Tower M : Milestone Release On Commencement of flooring 18th to 26th Floor – Status as on 6th September 2023

Utopia Tranquil Tower M : Milestone Release On Commencement of flooring 18<sup>th</sup> to 26<sup>th</sup> Floor – Status as on 6<sup>th</sup> September 2023

Utopia Tranquil Tower M : Milestone Release On Commencement of flooring 18th to 26th Floor – Status as on 6th September 2023

Utopia Tranquil Tower M : Milestone Release On Commencement of flooring 18<sup>th</sup> to 26<sup>th</sup> Floor – Status as on 6<sup>th</sup> September 2023

Utopia Tranquil Tower M : Milestone Release On Commencement of flooring 18th to 26th Floor – Status as on 6th September 2023

Utopia Tranquil Tower M : Milestone Release On Commencement of flooring 18<sup>th</sup> to 26<sup>th</sup> Floor – Status as on 6<sup>th</sup> September 2023

Utopia Tranquil Tower M : Milestone Release On Commencement of flooring 18th to 26th Floor – Status as on 6th September 2023

Utopia Paradise Tower G : Milestone Release On Casting of 08<sup>th</sup> Floor Slab – Status as on 1<sup>st</sup> September 2023

Utopia Paradise Tower G : Milestone Release On Casting of 08th Floor Slab – Status as on 1st September 2023

Utopia Paradise Tower F : Milestone Release On Casting of Terrace Slab – Status as on 1<sup>st</sup> September 2023

Utopia Paradise Tower F : Milestone Release On Casting of Terrace Slab – Status as on 1st September 2023

Serene : North West Elevation - Status as of September 2023

Serene : North West Elevation - Status as of September 2023

Serene : South-west View - Status as of September 2023

Serene : South-west View - Status as of September 2023

Serene : East side View - Status as of September 2023

Serene : East side View - Status as of September 2023

Serene : CA area (Sports area) structure works in progress - Status as of September 2023

Serene : CA area (Sports area) structure works in progress - Status as of September 2023

Serene : East Garden area compound wall works in progress - Status as of September 2023

Serene : East Garden area compound wall works in progress - Status as of September 2023

Eden : North and West Elevation - Status as of September 2023

Eden : North and West Elevation - Status as of September 2023

Eden : Corridor QA certification works in progress - Status as of September 2023

Eden : Corridor QA certification works in progress - Status as of September 2023

Eden : Staircase QA certification works in progress - Status as of September 2023

Eden : Staircase QA certification works in progress - Status as of September 2023

Eden : False ceiling works in corridor floors of commercial blocks - Status as of September 2023

Eden : False ceiling works in corridor floors of commercial blocks - Status as of September 2023

Eden : North Central Spine - Status as of September 2023

Eden : North Central Spine - Status as of September 2023

Eden : East Garden pathway works - Status as of September 2023

Eden : East Garden pathway works - Status as of September 2023

Halcyon : East/North Elevation - Status as of September 2023

Halcyon : East/North Elevation - Status as of September 2023

Halcyon : South side Elevation - Status as of September 2023

Halcyon : South side Elevation - Status as of September 2023

Halcyon : West Side elevation - Status as of September 2023

Halcyon : West Side elevation - Status as of September 2023

Paradise : Structure works in progress - Status as of September 2023

Paradise : Structure works in progress - Status as of September 2023

Paradise : Podium slab works in progress - Status as of September 2023

Paradise : Podium slab works in progress - Status as of September 2023

Paradise Tower G : BA units structure works in progress - Status as of September 2023

Paradise Tower G : BA units structure works in progress - Status as of September 2023

Paradise Tower I : BA units structure works in progress - Status as of September 2023

Paradise Tower I : BA units structure works in progress - Status as of September 2023

Paradise Tower K : Trench slab works in progress - Status as of September 2023

Paradise Tower K : Trench slab works in progress - Status as of September 2023

Tranquil : Courtyard waterproofing and screed works in progress - Status as of September 2023

Tranquil : Courtyard waterproofing and screed works in progress - Status as of September 2023

Tranquil : Podium upstand RC works in progress - Status as of September 2023

Tranquil : Podium upstand RC works in progress - Status as of September 2023

Tranquil : Drop-off area paver works in progress - Status as of September 2023

Tranquil : Drop-off area paver works in progress - Status as of September 2023

Tranquil : Staircase flooring Works in progress - Status as of September 2023

Tranquil : Staircase flooring Works in progress - Status as of September 2023

Tranquil : External painting works in progress - Status as of September 2023

Tranquil : External painting works in progress - Status as of September 2023

Tranquil : Podium waterproofing works in progress - Status as of September 2023

Tranquil : Podium waterproofing works in progress - Status as of September 2023

Utopia Paradise Tower F : Milestone Release – On Commencement of flooring GF to 8<sup>th</sup> floor – Status as on 28<sup>th</sup> August 2023

Utopia Paradise Tower F : Milestone Release – On Commencement of flooring GF to 8th floor – Status as on 28th August 2023

Utopia Paradise Tower F : Milestone Release – On Commencement of flooring GF to 8<sup>th</sup> floor – Status as on 28<sup>th</sup> August 2023

Utopia Paradise Tower F : Milestone Release – On Commencement of flooring GF to 8th floor – Status as on 28th August 2023

Utopia Paradise Tower H : Milestone Release – On Commencement of flooring GF to 8<sup>th</sup> floor – Status as on 28<sup>th</sup> August 2023

Utopia Paradise Tower H : Milestone Release – On Commencement of flooring GF to 8th floor – Status as on 28th August 2023

Utopia Paradise Tower H : Milestone Release – On Commencement of flooring GF to 8<sup>th</sup> floor – Status as on 28<sup>th</sup> August 2023

Utopia Paradise Tower H : Milestone Release – On Commencement of flooring GF to 8th floor – Status as on 28th August 2023

Utopia Paradise Tower J : Milestone Release – On Commencement of flooring Ground to 8<sup>th</sup> Floor – Status as on 21<sup>st</sup> August 2023

Utopia Paradise Tower J : Milestone Release – On Commencement of flooring Ground to 8th Floor – Status as on 21st August 2023

Utopia Paradise Tower J : Milestone Release – On Commencement of flooring Ground to 8<sup>th</sup> Floor – Status as on 21<sup>st</sup> August 2023

Utopia Paradise Tower J : Milestone Release – On Commencement of flooring Ground to 8th Floor – Status as on 21st August 2023

Utopia Paradise Tower L : Milestone Release – On Commencement of flooring Ground to 8<sup>th</sup> Floor – Status as on 21<sup>st</sup> August 2023

Utopia Paradise Tower L : Milestone Release – On Commencement of flooring Ground to 8th Floor – Status as on 21st August 2023

Utopia Paradise Tower H : Milestone Release – On Casting of Terrace Slab – Status as on 21<sup>st</sup> August 2023

Utopia Paradise Tower H : Milestone Release – On Casting of Terrace Slab – Status as on 21st August 2023

Utopia Paradise Tower J : Milestone Release On Casting of terrace slab – Status as on 18<sup>th</sup> August 2023

Utopia Paradise Tower J : Milestone Release On Casting of terrace slab – Status as on 18th August 2023

Utopia Tranquil Tower N : Milestone Release – On Commencement of fixing of Doors & Windows 18<sup>th</sup> to 26<sup>th</sup> Floor – Status as on 18<sup>th</sup> August 2023

Utopia Tranquil Tower N : Milestone Release – On Commencement of fixing of Doors & Windows 18th to 26th Floor – Status as on 18th August 2023

Utopia Tranquil Tower N : Milestone Release – On Commencement of fixing of Doors & Windows 18<sup>th</sup> to 26<sup>th</sup> Floor – Status as on 18<sup>th</sup> August 2023

Utopia Tranquil Tower N : Milestone Release – On Commencement of fixing of Doors & Windows 18th to 26th Floor – Status as on 18th August 2023

Utopia Tranquil Tower P : Milestone Release – On Commencement of Painting 18<sup>th</sup> to 26<sup>th</sup> Floor – Status as on 17<sup>th</sup> August 2023

Utopia Tranquil Tower P : Milestone Release – On Commencement of Painting 18th to 26th Floor – Status as on 17th August 2023

Utopia Tranquil Tower P : Milestone Release – On Commencement of Painting 18<sup>th</sup> to 26<sup>th</sup> Floor – Status as on 17<sup>th</sup> August 2023

Utopia Tranquil Tower P : Milestone Release – On Commencement of Painting 18th to 26th Floor – Status as on 17th August 2023

Utopia Tranquil Tower P : Milestone Release – On Commencement of flooring 18<sup>th</sup> to 26<sup>th</sup> Floor – Status as on 17<sup>th</sup> August 2023

Utopia Tranquil Tower P : Milestone Release – On Commencement of flooring 18th to 26th Floor – Status as on 17th August 2023

Utopia Tranquil Tower O : Milestone Release On Commencement of installation of lifts – Status as on 17<sup>th</sup> August 2023

Utopia Tranquil Tower O : Milestone Release On Commencement of installation of lifts – Status as on 17th August 2023

Utopia Tranquil Tower P : Milestone Release – On Commencement of Installation of Lifts – Status as on 16<sup>th</sup> August 2023

Utopia Tranquil Tower P : Milestone Release – On Commencement of Installation of Lifts – Status as on 16th August 2023

Utopia Tranquil Tower P : Milestone Release – On Commencement of Installation of Lifts – Status as on 16<sup>th</sup> August 2023

Utopia Tranquil Tower P : Milestone Release – On Commencement of Installation of Lifts – Status as on 16th August 2023

Utopia Tranquil Tower P : Milestone Release – On Commencement of Installation of Lifts – Status as on 16<sup>th</sup> August 2023

Utopia Tranquil Tower P : Milestone Release – On Commencement of Installation of Lifts – Status as on 16th August 2023

Utopia Tranquil Tower K : Milestone Release – On Commencement of Fixing of Doors & Windows 18<sup>th</sup> to 26<sup>th</sup> Floor – Status as on 9<sup>th</sup> August 2023

Utopia Tranquil Tower K : Milestone Release – On Commencement of Fixing of Doors & Windows 18th to 26th Floor – Status as on 9th August 2023

Utopia Tranquil Tower K : Milestone Release – On Commencement of Fixing of Doors & Windows 18<sup>th</sup> to 26<sup>th</sup> Floor – Status as on 9<sup>th</sup> August 2023

Utopia Tranquil Tower K : Milestone Release – On Commencement of Fixing of Doors & Windows 18th to 26th Floor – Status as on 9th August 2023

Utopia Tranquil Tower Q : Milestone Release – On commencement of Fixing of Doors and windows - 18<sup>th</sup>-26<sup>th</sup> floor – Status as on 3<sup>rd</sup> August 2023

Utopia Tranquil Tower Q : Milestone Release – On commencement of Fixing of Doors and windows - 18th-26th floor – Status as on 3rd August 2023

Utopia Tranquil Tower Q : Milestone Release – On commencement of Fixing of Doors and windows - 18<sup>th</sup>-26<sup>th</sup> floor – Status as on 3<sup>rd</sup> August 2023

Utopia Tranquil Tower Q : Milestone Release – On commencement of Fixing of Doors and windows - 18th-26th floor – Status as on 3rd August 2023

Serene : North West Elevation - Status as of August 2023

Serene : North West Elevation - Status as of August 2023

Serene : South-west View - Status as of August 2023

Serene : South-west View - Status as of August 2023

Serene : South central spine Top View - Status as of August 2023

Serene : South central spine Top View - Status as of August 2023

Serene : East side View - Status as of August 2023

Serene : East side View - Status as of August 2023

Serene : CA area (Sports area) structure works in progress - Status as of August 2023

Serene : CA area (Sports area) structure works in progress - Status as of August 2023

Serene : East Garden area compound wall works in progress - Status as of August 2023

Serene : East Garden area compound wall works in progress - Status as of August 2023

Eden : West Elevation - Status as of August 2023

Eden : West Elevation - Status as of August 2023

Eden : Corridor QA certification works in progress - Status as of August 2023

Eden : Corridor QA certification works in progress - Status as of August 2023

Eden : False ceiling works in corridor floors of commercial blocks - Status as of August 2023

Eden : False ceiling works in corridor floors of commercial blocks - Status as of August 2023

Eden : North Central Spine - Status as of August 2023

Eden : North Central Spine - Status as of August 2023

Eden : East Garden pathway works - Status as of August 2023

Eden : East Garden pathway works - Status as of August 2023

Halcyon : East/North Elevation - Status as of August 2023

Halcyon : East/North Elevation - Status as of August 2023

Halcyon : East side Elevation - Status as of August 2023

Halcyon : East side Elevation - Status as of August 2023

Halcyon : Internal flats QA certification works in progress - Status as of August 2023

Halcyon : Internal flats QA certification works in progress - Status as of August 2023

Halcyon : Corridor and staircase painting works in progress - Status as of August 2023

Halcyon : Corridor and staircase painting works in progress - Status as of August 2023

Clubhouse : Bird Eye View - Status as of August 2023

Clubhouse : Bird Eye View - Status as of August 2023

Clubhouse : Status as of August 2023

Clubhouse : Status as of August 2023

Clubhouse : East Elevation - Status as of August 2023

Clubhouse : East Elevation - Status as of August 2023

Clubhouse : Swimming pool QA Inspection in progress - Status as of August 2023

Clubhouse : Swimming pool QA Inspection in progress - Status as of August 2023

Paradise : Structure works in progress - Status as of August 2023

Paradise : Structure works in progress - Status as of August 2023

Paradise : Podium slab works in progress - Status as of August 2023

Paradise : Podium slab works in progress - Status as of August 2023

Paradise Tower G : BA units structure works in progress - Status as of August 2023

Paradise Tower G : BA units structure works in progress - Status as of August 2023

Paradise Tower I : BA units structure works in progress - Status as of August 2023

Paradise Tower I : BA units structure works in progress - Status as of August 2023

Paradise Tower K : Trench slab works in progress - Status as of August 2023

Paradise Tower K : Trench slab works in progress - Status as of August 2023

Tranquil : Courtyard waterproofing and screed works in progress - Status as of August 2023

Tranquil : Courtyard waterproofing and screed works in progress - Status as of August 2023

Tranquil : Podium upstand RC works in progress - Status as of August 2023

Tranquil : Podium upstand RC works in progress - Status as of August 2023

Tranquil : Drop-off area paver works in progress - Status as of August 2023

Tranquil : Drop-off area paver works in progress - Status as of August 2023

Tranquil : Staircase flooring Works in progress - Status as of August 2023

Tranquil : Staircase flooring Works in progress - Status as of August 2023

Tranquil : External painting works in progress - Status as of August 2023

Tranquil : External painting works in progress - Status as of August 2023

Tranquil : Entrance lobby ID works in progress - Status as of August 2023

Tranquil : Entrance lobby ID works in progress - Status as of August 2023

Tranquil : Podium waterproofing works in progress - Status as of August 2023

Tranquil : Podium waterproofing works in progress - Status as of August 2023

Serene : Top View - Status as of July 2023

Serene : Top View - Status as of July 2023

Serene : South-West View - Status as of July 2023

Serene : South-West View - Status as of July 2023

Serene : South central spine Top View - Status as of July 2023

Serene : South central spine Top View - Status as of July 2023

Serene : East Side View - Status as of July 2023

Serene : East Side View - Status as of July 2023

Serene : Corridor QA certification works in progress - Status as of July 2023

Serene : Corridor QA certification works in progress - Status as of July 2023

Serene : CA area (Sports area) structure works in progress - Status as of July 2023

Serene : CA area (Sports area) structure works in progress - Status as of July 2023

Serene : East Garden area compound wall works in progress - Status as of July 2023

Serene : East Garden area compound wall works in progress - Status as of July 2023

Eden : West Elevation - Status as of July 2023

Eden : West Elevation - Status as of July 2023

Eden : Corridor QA certification works in progress - Status as of July 2023

Eden : Corridor QA certification works in progress - Status as of July 2023

Eden : Corridor and staircase QA certification works in progress - Status as of July 2023

Eden : Corridor and staircase QA certification works in progress - Status as of July 2023

Clubhouse : Bird Eye View - Status as of July 2023

Clubhouse : Bird Eye View - Status as of July 2023

Clubhouse : QA certification works in progress - Status as of July 2023

Clubhouse : QA certification works in progress - Status as of July 2023

Clubhouse : East Elevation - Status as of July 2023

Clubhouse : East Elevation - Status as of July 2023

Clubhouse : Swimming pool QA Inspection in progress - Status as of July 2023

Clubhouse : Swimming pool QA Inspection in progress - Status as of July 2023

Halcyon : East Elevation - Status as of July 2023

Halcyon : East Elevation - Status as of July 2023

Halcyon : West & North side Elevation - Status as of July 2023

Halcyon : West & North side Elevation - Status as of July 2023

Paradise : Structure works in progress - Status as of July 2023

Paradise : Structure works in progress - Status as of July 2023

Paradise : Podium slab works in progress - Status as of July 2023

Paradise : Podium slab works in progress - Status as of July 2023

Paradise Tower G : BA units structure works in progress - Status as of July 2023

Paradise Tower G : BA units structure works in progress - Status as of July 2023

Paradise Tower I : BA units structure works in progress - Status as of July 2023

Paradise Tower I : BA units structure works in progress - Status as of July 2023

Paradise Tower K : Trench slab works in progress - Status as of July 2023

Paradise Tower K : Trench slab works in progress - Status as of July 2023

Tranquil : Courtyard waterproofing and screed works in progress - Status as of July 2023

Tranquil : Courtyard waterproofing and screed works in progress - Status as of July 2023

Tranquil : Podium upstand RC works in progress - Status as of July 2023

Tranquil : Podium upstand RC works in progress - Status as of July 2023

Tranquil : External painting works in progress - Status as of July 2023

Tranquil : External painting works in progress - Status as of July 2023

Tranquil : Corridor flooring Works in progress - Status as of July 2023

Tranquil : Corridor flooring Works in progress - Status as of July 2023

Tranquil : Flats QA Certification works in progress - Status as of July 2023

Tranquil : Flats QA Certification works in progress - Status as of July 2023

Tranquil : Entrance lobby ID works in progress - Status as of July 2023

Tranquil : Entrance lobby ID works in progress - Status as of July 2023

Tranquil : Clay tiling works in progress - Status as of July 2023

Tranquil : Clay tiling works in progress - Status as of July 2023

Utopia Paradise Tower F : Milestone Release – On Casting of 24<sup>th</sup> Floor Slab – Status as on 18<sup>th</sup> July 2023

Utopia Paradise Tower F : Milestone Release – On Casting of 24th Floor Slab – Status as on 18th July 2023

Utopia Paradise Tower I : Milestone Release – On Casting of 8<sup>th</sup> Floor Slab – Status as on 18<sup>th</sup> July 2023

Utopia Paradise Tower I : Milestone Release – On Casting of 8th Floor Slab – Status as on 18th July 2023

Utopia Paradise Tower H : Milestone Release – On Casting of 24<sup>th</sup> Floor Slab – Status as on 17<sup>th</sup> July 2023

Utopia Paradise Tower H : Milestone Release – On Casting of 24th Floor Slab – Status as on 17th July 2023

Utopia Tranquil Tower K : Milestone Release On commencement of Painting Works 18<sup>th</sup> Floor to 26<sup>th</sup> Floor – Status as on 11<sup>th</sup> June 2023

Utopia Tranquil Tower K : Milestone Release On commencement of Painting Works 18th Floor to 26th Floor – Status as on 11th June 2023

Utopia Tranquil Tower O : Milestone Release - On commencement of Doors and windows 9<sup>th</sup>-18<sup>th</sup> floor – Status as on 10<sup>th</sup> June 2023

Utopia Tranquil Tower O : Milestone Release - On commencement of Doors and windows 9th-18th floor – Status as on 10th June 2023

Utopia Tranquil Tower Q : Milestone Release – On commencement of Painting works 19-26<sup>th</sup>h floors – Status as on 10<sup>th</sup> June 2023

Utopia Tranquil Tower Q : Milestone Release – On commencement of Painting works 19-26thh floors – Status as on 10th June 2023

Utopia Paradise Tower J : Milestone Release – On Casting of 24<sup>th</sup> Floor Slab – Status as on 7<sup>th</sup> July 2023

Utopia Paradise Tower J : Milestone Release – On Casting of 24th Floor Slab – Status as on 7th July 2023

Utopia Paradise Tower L : Milestone Release – On Casting of 24<sup>th</sup> Floor Slab – Status as on 24<sup>th</sup> June 2023

Utopia Paradise Tower L : Milestone Release – On Casting of 24th Floor Slab – Status as on 24th June 2023

Utopia Tranquil Tower P : Milestone Release – On Commencement of Painting 9 to 17<sup>th</sup> Floor – Status as on 9<sup>th</sup> June 2023

Utopia Tranquil Tower P : Milestone Release – On Commencement of Painting 9 to 17th Floor – Status as on 9th June 2023

Utopia Tranquil Tower P : Milestone Release – On Commencement of Painting 9 to 17<sup>th</sup> Floor – Status as on 9<sup>th</sup> June 2023

Utopia Tranquil Tower P : Milestone Release – On Commencement of Painting 9 to 17th Floor – Status as on 9th June 2023

Utopia Tranquil Tower P : Milestone Release – Commencement of fixing of d & w 9 to 17<sup>th</sup> Floor – Status as on 9<sup>th</sup> June 2023

Utopia Tranquil Tower P : Milestone Release – Commencement of fixing of d & w 9 to 17th Floor – Status as on 9th June 2023

Utopia Tranquil Tower P : Milestone Release – On Commencement of Painting 9 to 17<sup>th</sup> Floor – Status as on 9<sup>th</sup> June 2023

Utopia Tranquil Tower P : Milestone Release – On Commencement of Painting 9 to 17th Floor – Status as on 9th June 2023

Utopia Tranquil Tower Q : Milestone Release - On commencement of flooring 18 to 26<sup>th</sup> Floor – Status as on 9<sup>th</sup> June 2023

Utopia Tranquil Tower Q : Milestone Release - On commencement of flooring 18 to 26th Floor – Status as on 9th June 2023

Utopia Paradise Tower G: Milestone Release – On Casting of 6<sup>th</sup> and 7<sup>th</sup> Floor Slab – Status as on 7<sup>th</sup> June 2023

Utopia Paradise Tower G: Milestone Release – On Casting of 6th and 7th Floor Slab – Status as on 7th June 2023

Utopia Tranquil Tower M : Milestone Release – On Commencement of Installation of Lifts – Status as on 3<sup>rd</sup> June 2023

Utopia Tranquil Tower M : Milestone Release – On Commencement of Installation of Lifts – Status as on 3rd June 2023

Utopia Tranquil Tower M : Milestone Release – On Commencement of Painting 9<sup>th</sup> to 17<sup>th</sup> Floor – Status as on 3<sup>rd</sup> June 2023

Utopia Tranquil Tower M : Milestone Release – On Commencement of Painting 9th to 17th Floor – Status as on 3rd June 2023

Utopia Tranquil Tower M : Milestone Release – On Commencement of Fixing of Doors & Windows – Status as on 3<sup>rd</sup> June 2023

Utopia Tranquil Tower M : Milestone Release – On Commencement of Fixing of Doors & Windows – Status as on 3rd June 2023

Paradise : Status as of June 2023

Paradise : Status as of June 2023

Eden : Corridor QA Works in Progress - Status as of June 2023

Eden : Corridor QA Works in Progress - Status as of June 2023

Eden : Corridor QA Certification works in progress - Status as of June 2023

Eden : Corridor QA Certification works in progress - Status as of June 2023

Eden : External East Garden/Mia-wakyWorks - Status as of June 2023

Eden : External East Garden/Mia-wakyWorks - Status as of June 2023

Eden : External East Garden/Mia-wakyWorks - Status as of June 2023

Eden : External East Garden/Mia-wakyWorks - Status as of June 2023

Eden : External North spine Works - Status as of June 2023

Eden : External North spine Works - Status as of June 2023

Clubhouse - Status as of June 2023

Clubhouse - Status as of June 2023

Clubhouse - Status as of June 2023

Clubhouse - Status as of June 2023

Clubhouse - Status as of June 2023

Clubhouse - Status as of June 2023

Clubhouse : Transformer Yard WIP - Status as of June 2023

Clubhouse : Transformer Yard WIP - Status as of June 2023

Halcyon : External painting works in verge of completion - Status as of June 2023

Halcyon : External painting works in verge of completion - Status as of June 2023

Halcyon - Status as of June 2023

Halcyon - Status as of June 2023

Halcyon : Internal QA Certification WIP - Status as of June 2023

Halcyon : Internal QA Certification WIP - Status as of June 2023

Halcyon : Internal QA Certification WIP - Status as of June 2023

Halcyon : Internal QA Certification WIP - Status as of June 2023

Halcyon : Corridor finishing WIP - Status as of June 2023

Halcyon : Corridor finishing WIP - Status as of June 2023

Halcyon : GIS Building. QA works in progress - Status as of June 2023

Halcyon : GIS Building. QA works in progress - Status as of June 2023

Halcyon : GIS Building. QA works in progress - Status as of June 2023

Halcyon : GIS Building. QA works in progress - Status as of June 2023

Halcyon : GIS Building - Status as of June 2023

Halcyon : GIS Building - Status as of June 2023

Halcyon : GIS Building. Transformer yard works in verge of completion - Status as of June 2023

Halcyon : GIS Building. Transformer yard works in verge of completion - Status as of June 2023

Serene View : QA works in progress in verge of completion - Status as of June 2023

Serene View : QA works in progress in verge of completion - Status as of June 2023

Serene : QA works in progress in verge of completion - Status as of June 2023

Serene : QA works in progress in verge of completion - Status as of June 2023

Serene : South Central Spine - Status as of June 2023

Serene : South Central Spine - Status as of June 2023

Serene : East Garden Area - Status as of June 2023

Serene : East Garden Area - Status as of June 2023

Serene : CA area works - Status as of June 2023

Serene : CA area works - Status as of June 2023

Tranquil : Structure completed - Status as of June 2023

Tranquil : Structure completed - Status as of June 2023

Tranquil : Door fixing and uPVC Windows WIP - Status as of June 2023

Tranquil : Door fixing and uPVC Windows WIP - Status as of June 2023

Tranquil : Finishing WIP - Status as of June 2023

Tranquil : Finishing WIP - Status as of June 2023

Tranquil : External Painting WIP - Status as of June 2023

Tranquil : External Painting WIP - Status as of June 2023

Tranquil : External Painting WIP - Status as of June 2023

Tranquil : External Painting WIP - Status as of June 2023

Tranquil : Courtyard podium Waterproofing & screed WIP - Status as of June 2023

Tranquil : Courtyard podium Waterproofing & screed WIP - Status as of June 2023

Utopia Tranquil Tower Q : Milestone Release - On commencement of fixing of Doors and windows 9<sup>th</sup> to 17<sup>th</sup> floor – Status as on 31<sup>st</sup> May 2023

Utopia Tranquil Tower Q : Milestone Release - On commencement of fixing of Doors and windows 9th to 17th floor – Status as on 31st May 2023

Utopia Tranquil Tower Q : Milestone Release - On commencement of fixing of Doors and windows 9<sup>th</sup> to 17<sup>th</sup> floor – Status as on 31<sup>st</sup> May 2023

Utopia Tranquil Tower Q : Milestone Release - On commencement of fixing of Doors and windows 9th to 17th floor – Status as on 31st May 2023

Utopia Tranquil Tower Q : Milestone Release – On commencement of installation of lifts – Status as on 31<sup>st</sup> May 2023

Utopia Tranquil Tower Q : Milestone Release – On commencement of installation of lifts – Status as on 31st May 2023

Utopia Tranquil Tower N : Milestone Release – On commencement of Doors and windows 9<sup>th</sup> to 17<sup>th</sup> floor – Status as on 27<sup>th</sup> May 2023

Utopia Tranquil Tower N : Milestone Release – On commencement of Doors and windows 9th to 17th floor – Status as on 27th May 2023

Utopia Tranquil Tower N : Milestone Release – On commencement of Doors and windows 9<sup>th</sup> to 17<sup>th</sup> floor – Status as on 27<sup>th</sup> May 2023

Utopia Tranquil Tower N : Milestone Release – On commencement of Doors and windows 9th to 17th floor – Status as on 27th May 2023

Utopia Tranquil Tower N : Milestone Release – On commencement of Doors and windows 9<sup>th</sup> to 17<sup>th</sup> floor – Status as on 27<sup>th</sup> May 2023

Utopia Tranquil Tower N : Milestone Release – On commencement of Doors and windows 9th to 17th floor – Status as on 27th May 2023

Utopia Tranquil Tower N : Milestone Release - On commencement of flooring 18<sup>th</sup> to 26<sup>th</sup> floor – Status as on 27<sup>th</sup> May 2023

Utopia Tranquil Tower N : Milestone Release - On commencement of flooring 18th to 26th floor – Status as on 27th May 2023

Utopia Tranquil Tower N : Milestone Release - On commencement of flooring 18<sup>th</sup> to 26<sup>th</sup> floor – Status as on 27<sup>th</sup> May 2023

Utopia Tranquil Tower N : Milestone Release - On commencement of flooring 18th to 26th floor – Status as on 27th May 2023

Utopia Tranquil Tower O : Milestone Release – On Commencement of Flooring 18<sup>th</sup> to 26<sup>th</sup> Floor – Status as on 27<sup>th</sup> May 2023

Utopia Tranquil Tower O : Milestone Release – On Commencement of Flooring 18th to 26th Floor – Status as on 27th May 2023

Utopia Paradise Tower F: Milestone Release – On Casting of 20th Floor Slab – Status as on 22nd May 2023

Utopia Paradise Tower K : Milestone Release – On Casting of 04th Floor Slab – Status as on 15th May 2023

Utopia Paradise Tower I : Milestone Release On Casting of 6th/7th Floor Slab – Status as on 5th May 2023

Utopia Paradise Tower J: Milestone Release On Casting of 20th Floor Slab – Status as on 5th May 2023

Serene View : QA works in progress in 3 towers. Completed in 8/11 towers - Status as of May 2023

Serene View : QA works in progress in 3 towers. Completed in 8/11 towers - Status as of May 2023

Serene View : QA works in progress in 3 towers. Completed in 8/11 towers - Status as of May 2023

Serene View : QA works in progress in 3 towers. Completed in 8/11 towers - Status as of May 2023

Serene : South Central Spine - Status as of May 2023

Serene : South Central Spine - Status as of May 2023

Serene : East Garden Area - Status as of May 2023

Serene : East Garden Area - Status as of May 2023

Serene : CA area works - Status as of May 2023

Serene : CA area works - Status as of May 2023

Halcyon : External painting works in verge of completion - Status as of May 2023

Halcyon : External painting works in verge of completion - Status as of May 2023

Halcyon : Internal QA certification WIP - Status as of May 2023

Halcyon : Internal QA certification WIP - Status as of May 2023

Halcyon : Entrance Lobby WIP - Status as of May 2023

Halcyon : Entrance Lobby WIP - Status as of May 2023

Halcyon : Entrance Lobby WIP - Status as of May 2023

Halcyon : Entrance Lobby WIP - Status as of May 2023

Halcyon : GIS Building Finishing works in progress - Status as of May 2023

Halcyon : GIS Building Finishing works in progress - Status as of May 2023

Halcyon : GIS Building - Status as of May 2023

Halcyon : GIS Building - Status as of May 2023

Halcyon : GIS Building. Transformer yard works in progress - Status as of May 2023

Halcyon : GIS Building. Transformer yard works in progress - Status as of May 2023

Eden : Corridor QA Works in Progress - Status as of May 2023

Eden : Corridor QA Works in Progress - Status as of May 2023

Eden : External Facade works in progress - Status as of May 2023

Eden : External Facade works in progress - Status as of May 2023

Eden : External East Garden/Mia-wakyWorks - Status as of May 2023

Eden : External East Garden/Mia-wakyWorks - Status as of May 2023

Eden : External East Garden/Mia-wakyWorks - Status as of May 2023

Eden : External East Garden/Mia-wakyWorks - Status as of May 2023

Eden : External North spine Works - Status as of May 2023

Eden : External North spine Works - Status as of May 2023

Paradise - Status as of May 2023

Paradise - Status as of May 2023

Clubhouse - Status as of May 2023

Clubhouse - Status as of May 2023

Clubhouse : External painting works in progress - Status as of May 2023

Clubhouse : External painting works in progress - Status as of May 2023

Clubhouse : Swimming Pool works in progress - Status as of May 2023

Clubhouse : Swimming Pool works in progress - Status as of May 2023

Clubhouse : Entrance Portal Cladding WIP - Status as of May 2023

Clubhouse : Entrance Portal Cladding WIP - Status as of May 2023

Tranquil : Structure completed - Status as of May 2023

Tranquil : Structure completed - Status as of May 2023

Tranquil : Door fixing and uPVC Windows WIP - Status as of May 2023

Tranquil : Door fixing and uPVC Windows WIP - Status as of May 2023

Tranquil : Finishing WIP - Status as of May 2023

Tranquil : Finishing WIP - Status as of May 2023

Tranquil : External Painting WIP - Status as of May 2023

Tranquil : External Painting WIP - Status as of May 2023

Tranquil : External Painting WIP - Status as of May 2023

Tranquil : External Painting WIP - Status as of May 2023

Tranquil : East & South side podium Waterproofing & screed WIP - Status as of May 2023

Tranquil : East & South side podium Waterproofing & screed WIP - Status as of May 2023

Utopia Tranquil Tower K : Milestone Release – On commencement of flooring 18th to 26th Floor – Status as on 21st April 2023

Utopia Tranquil Tower K : Milestone Release – On commencement of flooring 18th to 26th Floor – Status as on 21st April 2023

Utopia Tranquil Tower K : Milestone Release – On commencement of flooring 18th to 26th Floor – Status as on 21st April 2023

Utopia Tranquil Tower K : Milestone Release – On commencement of flooring 18th to 26th Floor – Status as on 21st April 2023

Utopia Tranquil Tower M : Milestone Release – Commencement of Fixing of Doors & Window GF Floor to 8th Floor – Status as on 21st April 2023

Utopia Tranquil Tower M : Milestone Release – Commencement of Fixing of Doors & Window GF Floor to 8th Floor – Status as on 21st April 2023

Utopia Tranquil Tower L : Milestone Release – On Commencement of Flooring 18th to 26th Floor – Status as on 21st April 2023

Utopia Tranquil Tower L : Milestone Release – On Commencement of Fixing of Doors & Windows 08th to 17th Floor – Status as on 21st April 2023

Utopia Tranquil Tower L : Milestone Release – On Commencement of Fixing of Doors & Windows 08th to 17th Floor – Status as on 21st April 2023

Utopia Tranquil Tower K : Milestone Release – On Commencement of Fixing of Doors & Windows 09th to 17th Floor – Status as on 21st April 2023

Utopia Tranquil Tower K : Milestone Release – On Commencement of Fixing of Doors & Windows 09th to 17th Floor – Status as on 21st April 2023

Utopia Tranquil Tower P : Milestone Release – On Casting of Terrace Slab – Status as on 17th April 2023

Utopia Paradise Tower H : Milestone release On Casting of 20th Floor Slab – Status as on 5th April 2023

Clubhouse - Status as of April 2023

Clubhouse : External painting works in progress - Status as of April 2023

Clubhouse : Billiards court area - Status as of April 2023

Clubhouse : Multipurpose Hall - Status as of April 2023

Clubhouse : Swimming Pool works in progress - Status as of April 2023

Arcadia : Above terrace WIP - Status as of April 2023

Arcadia : External painting WIP - Status as of April 2023

Arcadia : External plastering WIP - Status as of April 2023

Paradise - Status as of April 2023

Elysium : 2nd floor and 6th floor works in progress - Status as of April 2023

Elysium : 2nd floor Column and wall works in Progress - Status as of April 2023

Amoeba : GF Slab casting completed - Status as of April 2023

Eden : Corridor QA Works in Progress - Status as of April 2023

Eden : External Facade works in progress - Status as of April 2023

Eden : External East Garden/Mia-wakyWorks - Status as of April 2023

Eden : External East Garden/Mia-wakyWorks - Status as of April 2023

Eden : External North spine Works - Status as of April 2023

Eden : External North spine Works - Status as of April 2023

Eden : Kids play area - Status as of April 2023

Eden - Status as of April 2023

Halcyon : External painting works in verge of completion - Status as of April 2023

Halcyon : External painting works in verge of completion - Status as of April 2023

Halcyon : Finishing works. QA Certification works in progress - Status as of April 2023

Halcyon : Finishing works. Entrance Lobby - Status as of April 2023

Halcyon : Finishing works. Corridor finishing works in progress - Status as of April 2023

Halcyon : GIS Building - Status as of April 2023

Halcyon : GIS Building. Transformer yard works in progress - Status as of April 2023

Halcyon : GIS Building. Finishing works in progress - Status as of April 2023

Utopia Paradise Tower F : Milestone Release On Casting of 16th Floor Slab – Status as on 31st March 2023

Utopia Paradise Tower L : Milestone Release – On Casting of 20th Floor Slab – Status as on 29th March 2023

Utopia Paradise Tower J : Milestone Release – On Casting of 16th Floor Slab – Status as on 21st March 2023

Utopia Tranquil Tower N : Milestone Release – On Commencement of Installation of Lifts – Status as on 17th March 2023

Utopia Tranquil Tower O : Milestone Release – On Casting of Terrace Slab – Status as on 16th March 2023

Utopia Tranquil Tower P : Milestone Release – On Casting of 24th Floor slab – Status as on 13th March 2023

Serene View : Structure works completed for all towers. QA works in progress for all towers - Status as of March 2023

Serene : Entrance lobby - Status as of March 2023

Serene : Finishing works in Progress - Status as of March 2023

Serene : Central Spine Softscaping works - Status as of March 2023

Serene : Central Spine Pavilion flooring works - Status as of March 2023

Serene : Senior Citizen Courtyard - Status as of March 2023

Serene : Kids play area works - Status as of March 2023

Serene : Central Spine Mound plantation WIP - Status as of March 2023

Eden : All Towers structure works completed, Internal finishing & external painting in progress - Status as of March 2023

Eden : External painting works in progress - Status as of March 2023

Eden : External Facade works in progress - Status as of March 2023

Eden : External East Garden/Mia-wakyWorks - Status as of March 2023

Eden : External North spine Works - Status as of March 2023

Eden : External North spine Works - Status as of March 2023

Eden : Kids play area - Status as of March 2023

Eden : Senior Citizen Courtyard - Status as of March 2023

Tranquil – Status as of March 2023

Tranquil : Finishing WIP – Status as of March 2023

Tranquil : Door fixing and uPVC Windows WIP – Status as of March 2023

Tranquil : External Painting WIP – Status as of March 2023

Tranquil : External Painting WIP – Status as of March 2023

Tranquil : East Side podium Waterproofing & screed WIP – Status as of March 2023

Arcadia : Above terrace WIP - Status as of March 2023

Arcadia : External plastering WIP - Status as of March 2023

Arcadia : Refuge terrace works completed - Status as of March 2023

Paradise - Status as of March 2023

Elysium : 2nd floor and 6th floor works in progress - Status as of March 2023

Elysium : 2nd floor Column and wall works in Progress - Status as of March 2023

Clubhouse : Structure works completed and finishing works in progress - Status as of March 2023

Clubhouse : Finishing works in verge of completion - Status as of March 2023

Clubhouse : External painting works in progress - Status as of March 2023

Clubhouse : Glazing works in Verge of completion - Status as of March 2023

Clubhouse : Swimming Pool works in progress - Status as of March 2023

Halcyon : External painting works in verge of completion - Status as of March 2023

Halcyon : External painting works in verge of completion - Status as of March 2023

Halcyon : Finishing works - Status as of March 2023

Halcyon : Finishing works. Common area works in progress - Status as of March 2023

Utopia Tranquil Tower K : Milestone Release – On Commencement of Painting works 9th to 17th Floor – Status as on 28th February 2023

Utopia Tranquil Tower K : Milestone Release – On Commencement of Painting works 9th to 17th Floor – Status as on 28th February 2023

Utopia Tranquil Tower L : Milestone Release – On Commencement of Painting works 9th to 17th Floor – Status as on 28th February 2023

Utopia Tranquil Tower O : Milestone Release – On Commencement of Doors & Windows Ground to 8th Floor – Status as on 28th February 2023

Utopia Tranquil Tower O : Milestone Release – On Commencement of Doors & Windows Ground to 8th Floor – Status as on 28th February 2023

Utopia Tranquil Tower O : Milestone Release – On Commencement of Doors & Windows Ground to 8th Floor – Status as on 28th February 2023

Utopia Tranquil Tower N : Milestone Release – On commencement of Painting 09th to 17th Floor – Status as on 17th February 2023

Utopia Tranquil Tower O : Milestone Release On Commencement of Flooring 09th to 17th Floor – Status as on 16th February 2023

Utopia Tranquil Tower M : Milestone Release – On Casting of Terrace Floor – Status as on 13th February 2023

Utopia Tranquil Tower Q : Milestone Release – On Commencement of Painting 9th to 17th Floor – Status as on 9th February 2023

Utopia Halcyon Tower I : Milestone Release – Commencement of fixing of doors & windows 18th to 26th Floor – Status as on 2nd February 2023

Utopia Halcyon Tower J : Milestone Release – Commencement of fixing of doors & windows 18th to 26th Floor – Status as on 2nd February 2023

Utopia Tranquil Tower K : Milestone Release – On Commencement Installation of lifts – Status as on 2nd February 2023

Utopia Tranquil Tower O : Milestone Release – On Casting of 24th Floor Slab – Status as on 1st February 2023

Serene View : Structure works completed for all towers. QA works in progress for all towers - Status as of February 2023

Serene : Entrance lobby works in Progress - Status as of February 2023

Serene : External Painting WIP - Status as of February 2023

Serene : Finishing works in progress - Status as of February 2023

Serene : Central Spine works - Status as of February 2023

Serene : Central Spine Pavilion flooring works - Status as of February 2023

Serene : Senior Citizen Courtyard - Status as of February 2023

Serene : Kids play area works - Status as of February 2023

Serene : Youngster Courtyard - Status as of February 2023

Serene : Central Spine Mound plantation WIP - Status as of February 2023

Eden : All Towers structure works completed, Internal finishing & external painting in progress - Status as of February 2023

Eden : Internal finishing works in progress - Status as of February 2023

Eden : External Facade works in progress - Status as of February 2023

Eden : External East Garden/Mia-wakyWorks - Status as of February 2023

Eden : External North spine Works - Status as of February 2023

Eden : Kids play area - Status as of February 2023

Eden : Senior Citizen Courtyard - Status as of February 2023

Arcadia : Above terrace WIP - Status as of February 2023

Arcadia : External plastering WIP - Status as of February 2023

Arcadia : Structural steel Works WIP - Status as of February 2023

Paradise - Status as of February 2023

Elysium : 1st floor and 6th floor works in progress - Status as of February 2023

Elysium : 1st floor Slab works in Progress - Status as of February 2023

Halcyon : Structure work completed - Status as of February 2023

Halcyon : External painting WIP - Status as of February 2023

Halcyon : Finishing works. Internal Painting and doors fixing works in progress - Status as of February 2023

Halcyon : Finishing works. Common area works in progress - Status as of February 2023

Tranquil - Status as of February 2023

Tranquil : Corridor and BR flooring WIP - Status as of February 2023

Tranquil : Door fixing and uPVC Wndows WIP - Status as of February 2023

Tranquil : Lift WIP and External grinding WIP - Status as of February 2023

Tranquil : East Side podium Waterproofing & screed WIP - Status as of February 2023

Serene View : Structure works completed for all towers. Finishing works in progress for all towers - Status as of January 2023

Serene : Entrance lobby works in Progress - Status as of January 2023

Serene : Finishing works in Progress - Status as of January 2023

Serene : External Painting WIP - Status as of January 2023

Serene : Central Spine works - Status as of January 2023

Serene : Central Spine Pavilion flooring works - Status as of January 2023

Serene : Senior Citizen Courtyard - Status as of January 2023

Serene : Kids play area works - Status as of January 2023

Serene : Youngster Courtyard - Status as of January 2023

Arcadia : Terrace floor completed - Status as of January 2023

Arcadia : Above Terrace WIP - Status as of January 2023

Arcadia : Above Terrace WIP - Status as of January 2023

Paradise - Status as of January 2023

Paradise - Status as of January 2023

Elysium : 5th floor works in progress - Status as of January 2023

Elysium : GF Slab works in Progress - Status as of January 2023

Clubhouse : Structure works completed and finishing works in progress - Status as of January 2023

Clubhouse : Structure works completed and finishing works in progress - Status as of January 2023

Clubhouse : External painting works in progress - Status as of January 2023

Clubhouse : Facade works in progress - Status as of January 2023

Clubhouse : Interior works in progress - Status as of January 2023

Clubhouse : Interior works in progress - Status as of January 2023

Clubhouse : Interior works in progress - Status as of January 2023

Clubhouse : Staircase works in progress - Status as of January 2023

Clubhouse : Staircase works in progress - Status as of January 2023

Eden : All Towers structure works completed, Internal finishing & external painting in progress - Status as of January 2023

Eden - Status as of January 2023

Eden : External Facade works in progress - Status as of January 2023

Eden : External Entrance lobby Works - Status as of January 2023

Eden : External East Garden/Mia-wakyWorks - Status as of January 2023

Eden : External North spine Works - Status as of January 2023

Eden : Kids play area - Status as of January 2023

Eden : Senior Citizen Courtyard - Status as of January 2023

Halcyon : Structure work completed - Status as of January 2023

Halcyon : Finishing works. Internal Painting and doors fixing works in progress - Status as of January 2023

Halcyon : Finishing works. Common area works in progress - Status as of January 2023

Tranquil - Status as of January 2023

Tranquil : Toilet cladding and flooring WIP - Status as of January 2023

Tranquil : Door fixing and External grinding WIP - Status as of January 2023

Tranquil : East Side podium Waterproofing & screed WIP - Status as of January 2023

Utopia Paradise Tower K : Milestone Release – On Casting of 2nd Floor Slab – Status as on 30th January 2023

Utopia Paradise Tower H : Milestone Release – On Casting of 16th Floor Slab – Status as on 28th January 2023

Utopia Tranquil Tower M : Milestone Release – On Commencement of flooring 9th to 17th Floor – Status as on 28th January 2023

Utopia Paradise Tower L : Milestone Release – On Casting of 16th Floor Slab – Status as on 25th January 2023

Utopia Tranquil Tower P : Milestone Release – On Casting of 20th Floor Slab – Status as on 25th January 2023

Utopia Tranquil Tower O : Milestone Release – On Commencement of Flooring – 09th to 17th Floor – Status as on 23rd January 2023

Utopia Tranquil Tower L : Milestone Release – On Commencement of Fixing of doors & Windows – Ground to 8th Floor – Status as on 18th January 2023

Utopia Tranquil Tower L : Milestone Release – On Commencement of Fixing of doors & Windows – Ground to 8th Floor – Status as on 18th January 2023

Utopia Tranquil Tower L : Milestone Release – On Commencement of Fixing of doors & Windows – Ground to 8th Floor – Status as on 18th January 2023

Utopia Tranquil Tower K : Milestone Release – On Commencement of Fixing of doors & Windows – Ground to 8th Floor – Status as on 18th January 2023

Utopia Tranquil Tower K : Milestone Release – On Commencement of Fixing of doors & Windows – Ground to 8th Floor – Status as on 18th January 2023

Utopia Tranquil Tower K : Milestone Release – On Commencement of Fixing of doors & Windows – Ground to 8th Floor – Status as on 18th January 2023

Utopia Tranquil Tower Q : Milestone Release – On Casting of Terrace Slab – Status as on 13th January 2023

Utopia Tranquil Tower P : Milestone Release on Commencement of Fixing of Doors & Windows – Ground to 8th Floor – Status as on 13th January 2023

Utopia Tranquil Tower P : Milestone Release on Commencement of Fixing of Doors & Windows – Ground to 8th Floor – Status as on 13th January 2023

Utopia Tranquil Tower P : Milestone Release on Commencement of Fixing of Doors & Windows – Ground to 8th Floor – Status as on 13th January 2023

Utopia Tranquil Tower P : Milestone Release on Commencement of Fixing of Doors & Windows – Ground to 8th Floor – Status as on 13th January 2023

Utopia Halcyon Tower J : Milestone Release - On Commencement of Painting 9th to 17th Floor – Status as on 10th January 2023

Utopia Tranquil Tower N : Milestone Release – On Commencement of Fixing of doors & Windows Ground to 8th Floor – Status as on 6th January 2023

Utopia Tranquil Tower N : Milestone Release – On Commencement of Fixing of doors & Windows Ground to 8th Floor – Status as on 6th January 2023

Utopia Tranquil Tower Q : Milestone Release – On Commencement of Fixing of Doors & Windows Ground to 8th Floor – Status as on 5th January 2023

Utopia Tranquil Tower Q : Milestone Release – On Commencement of Fixing of Doors & Windows Ground to 8th Floor – Status as on 5th January 2023

Utopia Tranquil Tower Q : Milestone Release – On Commencement of Fixing of Doors & Windows Ground to 8th Floor – Status as on 5th January 2023

Unit Videos

Enquire Now

Speak to us

Please select your country and enter your phone number

I Agree to the Terms & Conditions

Please wait..

Thank you for requesting a call back
Our team will get back to you shortly!