Status

Status Videos – October 2021

Utopia Paradise Tower K: Marketing milestone release - On Completion of Raft - Status as on 11th May 2022

Utopia Paradise Tower J : Marketing milestone On Casting of Ground floor slab - Status as on 9th May 2022

Utopia Eden Tower D : Marketing Milestone release Update - On Commencement of Installation of Lifts - Status as on 6th May 2022

Halcyon Tower J : On Casting of 24th Floor Slab – Status as on 2nd May 2022

Tranquil Tower L : Milestone release – On Completion of 20th Floor slab - Status as on 30th April 2022

Eden Tower A : Commencement of Installation of Lift milestone is released - Status as on 26th April 2022

Paradise Tower I : Milestone Release - Completion of Upper Basement slab - Status as on 19th April 2022

Paradise Tower H : Completion of Ground Floor slab - Status as on 16th April 2022

Tranquil Building Tower N : On casting of 12th Floor slab - Status as on 16th April 2022

Tranquil Building Tower P: On casting of 4th Floor slab – Status as on 16th April 2022

Halcyon Tower J : On Commencement of Flooring Works – Status as on 15th April 2022

Tranquil Building Tower Q : On casting of twelfth floor slab – Status as on 15th April 2022

Tranquil Building Tower M : Milestone Release On casting of 8th floor slab – Status as on 13th April 2022

Serene View : Structure works completed for all towers. Finishing works in progress for all towers - Status as of April 2022

Serene : Finishing works in verge of completion and Finishing works in progress for all towers - Status as of April 2022

Serene : Finishing works in verge of completion and Finishing works in progress for all towers - Status as of April 2022

Serene : Finishing works in verge of completion and Finishing works in progress for all towers - Status as of April 2022

Serene : West side Road works - Status as of April 2022

Serene : Senior Citizen Courtyard - Status as of April 2022

Serene : Kids play area works - Status as of April 2022

Serene : Youngster Courtyard - Status as of April 2022

Oasis Clubhouse : Structure works completed and finishing works in progress - Status as of April 2022

Oasis Clubhouse : External plastering works in progress - Status as of April 2022

Oasis Clubhouse : Badminton court Structural steel works in progress - Status as of April 2022

Arcadia : Raker floor slab in progress - Status as of April 2022

Arcadia : Raker floor slab in progress - Status as of April 2022

Paradise : Tower L – 4th Floor structure works in progress. Tower F – First Floor structure works in progress. Tower H – 1st floor Structure works in progress. Tower J – GF Structure works in progress. Other Towers Upper basement and Ground floor structure works in progress - Status as of April 2022

Elysium : UBL Slab and Ground floor works in progress - Status as of April 2022

Halcyon : Structure works - Status as of April 2022

Halcyon : Finishing works and Flooring and Windows fixing works in progress - Status as of April 2022

Halcyon : Finishing works and Painting and Cornice fixing works in progress - Status as of April 2022

Halcyon : Finishing works - Status as of April 2022

Tranquil : Status as of April 2022

Tranquil : Status as of April 2022

Brigade Utopia Halcyon I Block : Milestone release On commencement of Painting – Status as on 8th April 2022

Halcyon Tower I : Commencement of Flooring Works – Status as on 6th April 2022

Tranquil Tower K : On casting of 12th floor slab – Status as on 5th April 2022

Serene View : Structure works completed for all towers. Finishing works in progress for all towers – Status as on March 2022

Serene : Finishing works completion. Finishing works in progress for all towers – Status as on March 2022

Serene : Finishing works completion. Finishing works in progress for all towers – Status as on March 2022

Serene : West side Road works – Status as of March 2022

Serene : Senior Citizen Courtyard – Status as of March 2022

Serene : Kids play area works – Status as of March 2022

Serene : Youngster Courtyard – Status as of March 2022

Eden : All Towers structure works completed, external painting in progress - Status as of March 2022

Eden : All Towers structure works completed, Internal finishing & external painting in progress - Status as of March 2022

Eden : Internal finishing works in progress - Status as of March 2022

Eden : External Road Works - Status as of March 2022

Eden : Youngster Courtyard - Status as of March 2022

Eden : Kids play area - Status as of March 2022

Halcyon : Structure works - Status as of March 2022

Oasis Clubhouse : Structure works completed and finishing works in progress - Status as of March 2022

Oasis Clubhouse : Structure works completed and finishing works in progress - Status as of March 2022

Arcadia : Third floor slab in progress - Status as of March 2022

Paradise : Tower L – 3rd Floor structure works in progress. Paradise Tower F – First Floor structure works in progress. Paradise Tower H – 1st floor Structure works in progress. Paradise Tower J – GF Structure works in progress. Other Towers Upper basement and Ground floor structure works in progress - Status as of March 2022

Elysium : UBL Slab and Ground floor works in progress - Status as of March 2022

Tranquil - Status as of March 2022

Tranquil - Status as of March 2022

Paradise Tower G : Completion of Upper basement slab Milestone - Status as on 19th March 2022

Halcyon Tower J : Milestone Release On Casting of 20th Floor Slab - Status as on 18th March 2022

Tranquil Tower L : Building Milestone completion On casting of 16th Floor slab - Status as on 17th March 2022

Tranquil Building Tower O: Milestone Update On casting of 4th Floor Slab - Status as on 17th March 2022

Eden Tower D : Commencement of Painting – Status as on 11th March 2022

Eden Tower D : Marketing Milestone release Update Doors and Windows - Status as on 4th March 2022

Eden Tower D : Marketing Milestone release Update Doors and Windows - Status as on 4th March 2022

Eden Tower B : Commencement of Painting - Status as on 2nd March 2022

Eden Tower B : Commencement of Painting - Status as on 2nd March 2022

Paradise Tower J : Completion of Upper basement slab - Status as on 2nd March 2022

Serene Block E : On commencement of painting – Status as on February 2022

Serene Block F : On commencement of painting – Status as on February 2022

Serene Block G : On commencement of painting – Status as on February 2022

Serene Block H : On commencement of painting – Status as on February 2022

Serene Block B : On commencement of painting – Status as on February 2022

Serene Block A : On commencement of painting – Status as on February 2022

Serene Block C : On commencement of painting – Status as on February 2022

Serene Block D : On commencement of painting – Status as on February 2022

Serene View : Structure works completed for all towers. Finishing works in progress for all towers - Status as of February 2022

Serene View : Entrance lobby & Terrace PHE works in progress - Status as of February 2022

Serene : Progress photos - Status as of February 2022

Serene : Progress photos - Status as of February 2022

Serene : Kids play area works - Status as of February 2022

Serene : External development works - Status as of February 2022

Eden Tower A : On commencement of painting – Status as on February 22

Eden Tower C : On commencement of painting – Status as on February 22

Eden Tower E : On commencement of painting – Status as on February 22

Eden : All Towers structure works completed, external painting in progress - Status as of February 2022

Eden : External Development Works - Status as of February 2022

Eden Tower B : External Plaster / Block work - Status as of February 2022

Eden Tower D : External Plaster / Block work - Status as of February 2022

Eden : Commercial Pump Room - Status as of February 2022

Eden : Residential Pump Room - Status as of February 2022

Eden : External development works - Status as of February 2022

Eden : External development works - Status as of February 2022

Eden : External development works - Status as of February 2022

Halcyon : Structure works - Status as of February 2022

Oasis Clubhouse : Terrace floor structure works completed - Status as of February 2022

Oasis : External development works - Status as of February 2022

Arcadia : 4th floor slab in progress - Status as of February 2022

Paradise : Tower L - Second Floor structure works in progress. Tower F – First Floor structure works in progress. Tower H – GF & FF Structure works in progress. Tower J – GF Structure works in progress. Tower G – UBL Structure works in progress. Towers Foundation works in progress - Status as of February 2022

Elysium : Foundation works in progress. GF works in progress - Status as of February 2022

Tranquil Tower K : 10th Floor structure works in progress. Tower L – 15th Floor structure works in progress. Tower M – 6th Floor structure works in progress. Tower N – 10th floor structure works in progress. Tower O – 4th floor structure works in progress. Tower P – 3rd floor structure works in progress. Tower Q – 9th floor structure works in progress - Status as of February 2022

Eden Tower C : commencement of Flooring - Status as on 28th February 2022

Eden Tower C : commencement of Flooring - Status as on 28th February 2022

Eden Tower C : commencement of Flooring - Status as on 28th February 2022

Paradise Tower F: Milestone Release, Completion of Ground floor slab – Status as on 24th February 2022

Tranquil Tower Q : Casting of Eighth Floor Slab - Status as on 22nd February 2022

Tranquil Tower N : 8th Floor slab casting - Status as on 17th February 2022

Halcyon Tower I : Milestone Release On Commencement of Flooring Works - Status as on 17th February 2022

Halcyon Tower I : Milestone Release On Commencement of Flooring Works - Status as on 17th February 2022

Eden Tower C : Milestone Release Commencement of Installation of Lifts - Status as on 15th February 2022

Tranquil Tower K : Milestone Release On casting of eighth floor slab - Status as on 11th February 2022

Tranquil Tower K : Milestone Release On casting of eighth floor slab - Status as on 11th February 2022

Eden Tower B : Casting of Terrace Slab - Status as on 10th February 2022

Eden Tower B : Commencement of Flooring - Status as on 10th February 2022

Utopia Eden Wing E : Milestone Release Commencement of Installation of Lifts - Status as on 9th February 2022

Tranquil Tower M : Milestone Release On casting of 4th floor slab - Status as on 8th February 2022

Tranquil Tower M : Milestone Release On casting of 4th floor slab - Status as on 8th February 2022

Paradise Tower I : Milestone Release - Completion of Footing/Raft – Status as on 8th February 2022

Tranquil Tower L : On Casting of 12th floor slab - Status as on 7th February 2022

Paradise Tower G : Completion of Footing/Raft – Status as on 2nd February 2022

Serene View : Structure works completed for all towers. Finishing works in progress for all towers - Status as of January 2022

Serene View : Structure works completed for all towers. Finishing works in progress for all towers - Status as of January 2022

Serene : Progress Photo- Status as of January 2022

Serene : Kids play area works - Status as of January 2022

Serene : External development works - Status as of January 2022

Serene : Progress photo - Status as of January 2022

Serene : Progress photo - Status as of January 2022

Serene : Progress photo - Status as of January 2022

Serene : Kids play area works - Status as of January 2022

Serene : External development works - Status as of January 2022

Eden : All Towers structure works completed, external painting in progress - Status as of January 2022

Eden : All Towers structure works completed, external painting in progress - Status as of January 2022

Eden : External Development Works - Status as of January 2022

Eden : External development works - Status as of January 2022

Eden : External development works - Status as of January 2022

Eden : External development works - Status as of January 2022

Halcyon : Structure works - Status as of January 2022

Oasis Clubhouse : Terrace floor structure works in progress - Status as of January 2022

Oasis : External development works - Status as of January 2022

Arcadia : Third floor slab in progress - Status as of January 2022

Paradise : Tower L - First Floor structure works in progress. Tower F – First Floor structure works in progress. Tower H – GF Structure works in progress. Tower J – GF Structure works in progress. Other Towers Foundation works in progress - Status as of January 2022

Elysium : Foundation works in progress. Ramp works in progress. UBL Slab works in progress - Status as of January 2022

Elysium : Foundation works in progress. Ramp works in progress. UBL Slab works in progress - Status as of January 2022

Tranquil - Status as of January 2022

Halcyon Tower J : GF to 8th Floor on Commencement of Painting Works - Status as on 31st January 2022

Halcyon Tower I : GF to 8th Floor on Commencement of Painting Works - Status as on 31st January 2022

Serene Wing B : Commencement of installation of lifts - Status as of 28th January 2022

Serene Wing A : Commencement of installation of lifts - Status as of 25th January 2022

Halcyon Tower J : On Casting of 16th Floor Slab - Status as on 25th January 2022

Halcyon Tower J : On Casting of 16th Floor Slab - Status as on 25th January 2022

Paradise Wing H : Milestone release Completion of Upper Basement floor Slab - Status as on 20th January 2022

Serene Tower B : Commencement of doors and windows - Wing B - Status as of 17th January 2022

Serene Tower B : Commencement of doors and windows - Wing B - Status as of 17th January 2022

Serene Tower B : Commencement of doors and windows - Wing B - Status as of 17th January 2022

Serene Tower C : Commencement of doors and windows - Wing C - Status as of 17th January 2022

Serene Tower C : Commencement of doors and windows - Wing C - Status as of 17th January 2022

Serene Tower C : Commencement of doors and windows - Wing C - Status as of 17th January 2022

Serene Tower C : Commencement of doors and windows - Wing C - Status as of 17th January 2022

Serene Tower C : Commencement of doors and windows - Wing C - Status as of 17th January 2022

Serene Wing A : Commencement of door and windows - Wing A - Status as on 17th January 2022

Serene Wing A : Commencement of door and windows - Wing A - Status as on 17th January 2022

Serene Wing A : Commencement of door and windows - Wing A - Status as on 17th January 2022

Serene Tower D : Commencement of doors and windows - Wing D - Status as of 17th January 2022

Serene Tower D : Commencement of doors and windows - Wing D - Status as of 17th January 2022

Serene Tower D : Commencement of doors and windows - Wing D - Status as of 17th January 2022

Serene Tower D : Commencement of doors and windows - Wing D - Status as of 17th January 2022

Eden Tower C : Milestone release Commencement of fixing Doors and Windows - Status as on 10th January 2022

Eden Tower C : Milestone release Commencement of fixing Doors and Windows - Status as on 10th January 2022

Eden Tower E : Milestone release Commencement of fixing Doors and Windows - Status as on 10th January 2022

Eden Tower E : Milestone release Commencement of fixing Doors and Windows - Status as on 10th January 2022

Tranquil BN Tower Q : Casting of Fourth Floor Slab - Status as on 7th January 2022

Halcyon Tower I : Casting of Terrace Slab - Status as on 6th January 2022

Halcyon Tower I : Casting of Terrace Slab - Status as on 6th January 2022

Paradise Tower F : Completion of Upper Basement floor Slab - Status as on 3rd January 2022

Serene View : Structure works completed for all towers. Finishing works in progress for all towers - Status as of December 2021

Serene: Entrance Lobby works - Status as of December 2021

Serene : Progress photos - Status as of December 2021

Serene : Kids play area works - Status as of December 2021

Serene : External development works - Status as of December 2021

Serene : Kids Play Area & Youngsters Corner - Status as of December 2021

Eden : All Towers structure works completed, external painting in progress - Status as of December 2021

Eden : External Development Works - Status as of December 2021

Eden : External Development Works - Status as of December 2021

Halcyon : Structure works - Status as of December 2021

Halcyon : Finishing works - Status as of December 2021

Tranquil - Status as of December 2021

Utopia Eden D : Milestone release – On commencement of Flooring - Status as on 31st December 2021

Serene Wing D : Milestone Release commencement of lifts - Status as on 29th December 2021

Serene Wing C : Milestone Release commencement of lifts - Status as on 29th December 2021

Tranquil Building Tower K : Milestone completion Completion of 4th Floor slab - Status as on 29th December 2021

Paradise Tower L : Completion of Ground floor slab Milestone - Status as on 27th December 2021

Utopia Paradise Wing L : Casting of Upper Basement floor Slab - Status as on 23rd Dec 2021

Utopia Tranquil Wing N : Milestone on casting of 4th floor slab - Status as on 21st December 2021

Utopia Serene Tower G : Milestone on commencement of Fixing of doors & Windows - Status as on 20th December 2021

Utopia Serene Tower G : Milestone on commencement of Fixing of doors & Windows - Status as on 20th December 2021

Utopia Serene Wing H : Milestone on commencement of Fixing of doors & Windows - Status as on 20th December 2021

Utopia Serene Wing E : Milestone on commencement of Fixing of doors & Windows - Status as on 20th December 2021

Utopia Serene Wing F : Milestone on commencement of Fixing of doors & Windows - Status as on 20th December 2021

Tranquil Building : Tower L Completion of Eighth Floor slab – Status as on 18th December 2021

Halcyon Tower I : Milestone Release for Commencement of Flooring Works For both Tower I - Status as on 16th December 2021

Halcyon Tower J : Milestone Release for Commencement of Flooring Works For both Tower J - Status as on 16th December 2021

Paradise : Tower J Raft Completion – Status as on 16th December 2021

Eden Tower E : commencement of Tiling works and 9th - 17th floor Flooring completed - Status as on 1st December 2021

Eden Tower A : commencement of Tiling works and 9th - 17th floor Flooring completed - Status as on 1st December 2021

Eden Tower C : commencement of Tiling works and 9th - 17th floor Flooring completed - Status as on 1st December 2021

Eden Wing A : Commencement of fixing of door & windows - Status as on 1st December 2021

Eden Wing A : Commencement of fixing of door & windows - Status as on 1st December 2021

Eden Wing A : Commencement of fixing of door & windows - Status as on 1st December 2021

Serene View : Structure works completed for all towers. Finishing works in progress for all towers – Status as of November 2021

Serene : Entrance Lobby works – Status as of November 2021

Serene : progress photos – Status as of November 2021

Serene : Finishing works in progress – Status as of November 2021

Serene EFGH Towers : Lift installation in progress – Status as of November 2021

Serene : Windows Fixing works – Status as of November 2021

Serene : External surface finishing works – Status as of November 2021

Serene : Senior Citizen court – Status as of November 2021

Serene : Kids play area works – Status as of November 2021

Serene : Youngster’s court – Status as of November 2021

Serene : External development works – Status as of November 2021

Serene : Kids Play Area & Youngsters Corner – Status as of November 2021

Eden : All Towers structure works completed, external painting in progress - Status as of November 2021

Eden - Status as of November 2021

Eden : Tiling and Painting works - Status as of November 2021

Eden Tower A : External Finishing and uPVC Windows fixing works in progress - Status as of November 2021

Eden Tower C : External Finishing and uPVC Windows fixing works in progress - Status as of November 2021

Eden Tower E : External Finishing and uPVC Windows fixing works in progress - Status as of November 2021

Eden Tower B : Block work in progress - Status as of November 2021

Eden Tower D : External plastering works in progress - Status as of November 2021

Eden : External Development Works - Status as of November 2021

Eden : External Development Works - Status as of November 2021

Eden : Courtyard works - Status as of November 2021

Halcyon : Structure works - Status as of November 2021

Halcyon : Finishing works - Status as of November 2021

Halcyon : Finishing works - Status as of November 2021

Halcyon : Internal FPS works - Status as of November 2021

Clubhouse : Terrace floor structure works in progress - Status as of November 2021

Swimming Pool : Pool wall works in progress - Status as of November 2021

Arcadia : Second floor slab in progress - Status as of November 2021

Paradise Tower L : Ground Floor structure works in progress. Paradise Tower F - UBL structure works in progress. Other Towers Foundation works in progress - Status as of November 2021

Elysium : Foundation works in progress. Ramp works in progress - Status as of November 2021

Tranquil : Status as of November 2021

Tranquil : Status as of November 2021

Halcyon Tower J : Milestone Release On casting of 12th floor slab - Status as on 30th November 2021

Halcyon Tower I : Milestone Release On casting of 24th floor slab - Status as on Status as of November 30th 2021

Paradise : Tower H, Completion of Footing/ Raft Milestone - Status as of November 18th 2021

Eden : Tower D Completion of Terrace floor slab - Status as on 12th November 2021

Tranquil Tower L : Milestone Release - On casting of 4th floor slab - Status as of 8th November 2021

Serene : Structure works completed for all towers. Finishing works in progress for all towers – Status as of October 2021

Serene : Entrance Lobby works – Status as of October 2021

Serene : Finishing works in progress – Status as of October 2021

Serene : EFGH Towers Lift installation in progress – Status as of October 2021

Serene : Windows Fixing works – Status as of October 2021

Serene : External surface finishing works – Status as of October 2021

Serene : Senior Citizen court – Status as of October 2021

Serene : Kids play area works – Status as of October 2021

Serene : Youngster’s court – Status as of October 2021

Serene : External development works – Status as of October 2021

Eden : All Towers Terrace Floor structure works completed – Status as of October 2021

Eden : Finishing works in progress completed – Status as of October 2021

Eden : External Finishing and uPVC Windows fixing works in progress completed – Status as of October 2021

Eden : External plastering works completed – Status as of October 2021

Eden : External Waterproofing works completed – Status as of October 2021

Eden – Courtyard works completed – Status as of October 2021

Halcyon : Structure works completed – Status as of October 2021

Halcyon : Finishing works completed – Status as of October 2021

Halcyon : MEP works completed – Status as of October 2021

Clubhouse : Fourth floor structure works in progress - Status as of October 2021

Swimming pool foundation works in verge of completion. Pool wall works in progress - Status as of October 2021

Swimming pool foundation works in verge of completion. Pool wall works in progress - Status as of October 2021

Arcadia : Second floor slab in progress – Status as of October 2021

Paradise : Tower L – Ground Floor structure works in progress. Tower F UBL structure works in progress. Other Towers Foundation works in progress – Status as of October 2021

Elysium : Foundation works in progress.Ramp works in progress – Status as of October 2021

Tranquil – Status as of October 2021

Eden Tower A : On casting of terrace slab – Status as of 18th October 2021

Tranquil Building Tower O : Ground Floor slab – Status as of 13th October 2021

Halcyon Tower I : On casting of 20th floor slab - Status as of 12th October 2021

Halcyon Tower I : On casting of 20th floor slab - Status as of 12th October 2021

Brigade Cornerstone Utopia Serene Tower/Wing E : On Commencement of installation of lifts - Status as of October 6th 2021

Brigade Cornerstone Utopia Serene Tower/Wing F : On commencement of installation of lifts – Status as of October 6th 2021

Brigade Cornerstone Utopia Serene Tower/Wing F : On commencement of installation of lifts – Status as of October 6th 2021

Brigade Cornerstone Utopia Serene Tower/Wing G : Commencement of installation of lifts - Status as of October 6th 2021

Brigade Cornerstone Utopia Serene Tower/Wing H : On Commencement of installation of lifts - Status as of October 6th 2021

Serene View : Ribbon 3 – 9th Floor slab structure works in progress. Other towers terrace structure works completed progress – Status as of September 2021

Serene : Flooring and Painting work in progress progress – Status as of September 2021

Serene Entrance lobby – Status as of September 2021

Serene Services – Status as of September 2021

Serene External Development – Status as of September 2021

Eden Tower A : 23rd & 25th Floor structure works in progress. Other Towers Terrace Floor structure works completed – Status as of September 2021

Eden : Flooring & Painting works in progress – Status as of September 2021

Eden : UPVC Windows works in progress – Status as of September 2021

Halcyon Overall view : Halcyon Tower I – 20th Floor structure works in progress. Halcyon Tower J – 9th Floor structure works in progress – Status as of September 2021

Halcyon : Toilet MEP & Tiling works – Status as of Sepetmber 2021

Clubhouse : Fourth floor structure works in progress – Status as of September 2021

Swimming pool foundation works in progress – Status as of September 2021

Arcadia : First floor slab in progress – Status as of September 2021

Tranquil Tower K & M : First Floor structure works in progress. Tranquil Tower L – Second Floor structure works in progress. Tranquil Tower N – GF & FF structure works in progress. Tranquil Tower O & P – GF structure works in progress. Tranquil Tower Q – FF structure works in progress – Status as of September 2021

Paradise Tower L : Ground Floor structure works in progress. Paradise Tower F UBL structure works in progress. Other Towers Foundation works in progress – Status as of September 2021

Elysium : Foundation works in progress – Status as of September 2021

Halcyon Tower J : Casting of 8th floor Slab - Status as of 23rd Sepetmber 2021

Halcyon Tower J : Casting of 8th floor Slab - Status as of 23rd Sepetmber 2021

Eden Tower A : Completion of 24th floor slab Milestone – Status as of 14th September 2021

Paradise Tower F : Casting of Raft/Footing Milestone – Status as of September 9th 2021

Eden Tower C : Completion of Terrace floor slab Milestone – Status as of 9th September 2021

Tranquil Tower P : Ground Floor slab - Casted on 5th September 2021

Serene View From East side : Ribbon 3 – 7th Floor slab structure works in progress – Status as of August 2021

Serene View from westside - Status as of August 2021

Serene : Flooring in progress in all towers - Status as of August 2021

Eden Tower A : 23rd & 25th Floor structure works in progress. Eden Tower C : Terrace Floor structure works in progress. Other Towers Terrace Floor structure works completed – Status as of August 2021

Eden Tower A,Tower C, Tower E : Flooring – Status as of August 2021

Eden Tower A, Tower C, Tower E : Painting – Status as of August 2021

Halcyon : Overall view. Halcyon Tower I – 17th Floor structure works in progress. Halcyon Tower J – 7th Floor structure works in progress – Status as of August 2021

Fourth floor structure works in progress. Swimming pool foundation works in progress – Status as of August 2021

Arcadia : First floor slab in progress – Status as of August 2021

Tranquil Tower K : First Floor structure works in progress. Tranquil Tower L : Second Floor structure works in progress. Tranquil Tower M : First Floor structure works in progress. Tranquil Tower N : GF & FF structure works in progress. Tranquil Tower O : GF structure works in progress. Tranquil Tower P : GF structure works in progress. Tranquil Tower Q : FF structure works in progress – Status as of August 2021

Paradise Tower F : B1 level Slab decking in progress – Status as of August 2021

Paradise Tower H : Raft/Footing work in progress – Status as of August 2021

Paradise Tower J : Excavation Wok in Progress – Status as of August 2021

Paradise Tower L : B1 Slab in Progress – Status as of August 2021

Eden Tower A : North Elevation – Status as of August 2021

Eden Tower B : East & West Elevation – Status as of August 2021

Eden Tower C : North Elevation – Status as of August 2021

Eden Tower D : West Elevation – Status as of August 2021

Eden Tower D : Swimming pool work in progress – Status as of August 2021

Eden Tower E : North Elevation – Status as of August 2021

Eden Tower B : Completion of 8th floor slab – Status as of 28th August 2021

Halcyon Tower I : Casting of 16th floor Slab – Status as of 26th August 2021

Brigade Cornerstone Utopia Serene Tower/Wing D : Casting of Terrace Floor Slab – Status as of 21st August 2021

Serene Tower E : Commencement of Painting – Status as of 17th August 2021

Serene Tower E : Commencement of Painting – Status as of 17th August 2021

Serene Tower E : Commencement of Painting – Status as of 17th August 2021

Serene Tower F : Commencement of Painting – Status as of 17th August 2021

Serene Tower F : Commencement of Painting – Status as of 17th August 2021

Serene Tower F : Commencement of Painting – Status as of 17th August 2021

Brigade Cornerstone Utopia Serene Tower/Wing C : Casting of Terrace Floor Slab - Status as of 9th August 2021

Brigade Cornerstone Utopia Serene Tower/Wing A : Casting of Terrace Floor Slab - Status as of 9th August 2021

Tranquil Tower O : Casting of Upper basement floor slab – Status as of 5th August 2021

Serene B : On commencement of Painting - Status as of 3rd August 2021

Serene B : On commencement of Painting - Status as of 3rd August 2021

Serene B : On commencement of Painting - Status as of 3rd August 2021

Serene B : On commencement of Painting - Status as of 3rd August 2021

Serene B : On commencement of Painting - Status as of 3rd August 2021

Serene C : On commencement of Painting – Status as of 3rd August 2021

Serene C : On commencement of Painting – Status as of 3rd August 2021

Serene C : On commencement of Painting – Status as of 3rd August 2021

Serene C : On commencement of Painting – Status as of 3rd August 2021

Eden Tower A : Completion of 20th floor slab Milestone - Status as of 2nd August 2021

Serene Tower A : Terrace Floor slab structure works in progress – Status as of July 2021

Serene Tower B : Above Terrace structure works in progress - Status as of July 2021

Serene Tower C : Terrace floor slab structure works in progress - Status as of July 2021

Serene Tower D : Terrace Floor slab structure works in progress - Status as of July 2021

Serene Tower E : Above Terrace structure works in progress - Status as of July 2021

Serene Tower F : Above Terrace structure works in progress - Status as of July 2021

Serene Tower G : Above Terrace structure works in progress - Status as of July 2021

Serene Tower H : Above Terrace structure works in progress - Status as of July 2021

Serene Tower C – E Low-rise : Above Terrace structure works in progress - Status as of July 2021

Serene Tower E – G Low-rise : Above Terrace structure works in progress - Status as of July 2021

Serene Tower B – C Low-rise : 6th floor slab structure works in progress - Status as of July 2021

Serene Flooring in progress in all towers - Status as of July 2021

Serene Painting in progress in Towers A, D, G & H - Status as of July 2021

Eden Overall view – Status as of July 2021

Eden Tower A : Part 21st & 22nd Floor structure works in progress – Status as of July 2021

Eden Tower B : Terrace Floor structure work in progress – Status as of July 2021

Eden Tower C : 25th Floor structure works in progress – Status as of July 2021

Eden Tower D : Above terrace works in progress – Status as of July 2021

Eden Tower E : Terrace floor structure works completed. Above terrace works in progress – Status as of July 2021

Eden Tower A, Tower C, Tower E : Flooring – Status as of July 2021

Eden Tower A, Tower C, Tower E : Painting – Status as of July 2021

Halcyon Overall view – Status as of July 2021

Halcyon Tower I : 14th Floor structure works in progress - Status as of July 2021

Halcyon Tower J : 5th Floor structure work in progress - Status as of July 2021

Clubhouse : 3rd floor structure works in progress - Status as of July 2021

Arcadia : Podium part Upper basement slab & Ground floor slab in progress - Status as of July 2021

Paradise Tower F : Foundation, columns and retaining wall works in progress - Status as of July 2021

Paradise Tower L : Upper basement slab structure works in progress. Paradise Tower J & K : Retaining wall works in progress - Status as of July 2021

Elysium : Footings, UG sump and STP works in progress - Status as of July 2021

Tranquil Overall view - Status as of July 2021

Tranquil Tower K : Ground Floor structure completed - Status as of July 2021

Tranquil Tower L : First Floor structure works in progress - Status as of July 2021

Tranquil Tower M : Tower area ground floor slab structure works completed. Low rise Tower M-N ground floor slab structure works in progress - Status as of July 2021

Tranquil Tower N : First floor structure works in progress - Status as of July 2021

Tranquil Tower O : Upper Basement slab structure works in progress - Status as of July 2021

Tranquil Tower P : Ground floor slab structure works in progress - Status as of July 2021

Tranquil Tower Q : Ground Floor slab structure works completed - Status as of July 2021

Eden Tower C : Completion of 24th floor slab Milestone - Status as of 30th July 2021

Eden Tower A : commencement of Painting milestone - Status as of 30th July 2021

Eden Tower A : commencement of Painting milestone - Status as of 30th July 2021

Eden Tower A : commencement of Painting milestone - Status as of 30th July 2021

Eden Tower A : commencement of Painting milestone - Status as of 30th July 2021

Eden Tower A : commencement of Painting milestone - Status as of 30th July 2021

Eden Tower B : Completion of 7th floor slab Milestone – Status as of 22nd July 2021

Eden Tower E : On Casting of Terrace slab - Status as of 19th July 2021

Tranquil Building - Tower P - Casting of Upper Basement slab – Status as of 19th July 2021

Halcyon : On Casting of 4th floor Slab Tower J – Status as of 15th July 2021

Halcyon : Casting of 12th floor Slab Tower I – Status as of 10th July 2021

Brigade Cornerstone Utopia : SERENE Tower/Wing D – Commencement of Painting – Status as of 8th July 2021

Brigade Cornerstone Utopia : SERENE Tower/Wing D – Commencement of Painting – Status as of 8th July 2021

Brigade Cornerstone Utopia : SERENE Tower/Wing D – Commencement of Painting – Status as of 8th July 2021

Brigade Cornerstone Utopia : SERENE Tower/Wing D – Commencement of Painting – Status as of 8th July 2021

Brigade Cornerstone Utopia : SERENE Tower/Wing A – Commencement of Painting – Status as of 8th July 2021

Brigade Cornerstone Utopia : SERENE Tower/Wing A – Commencement of Painting – Status as of 8th July 2021

Brigade Cornerstone Utopia : SERENE Tower/Wing A – Commencement of Painting – Status as of 8th July 2021

Brigade Cornerstone Utopia : SERENE Tower/Wing A – Commencement of Painting – Status as of 8th July 2021

Brigade Cornerstone Utopia : SERENE Tower/Wing G – Commencement of Painting - Status as of 8th July 2021

Brigade Cornerstone Utopia : SERENE Tower/Wing G – Commencement of Painting - Status as of 8th July 2021

Brigade Cornerstone Utopia : SERENE Tower/Wing G – Commencement of Painting - Status as of 8th July 2021

Brigade Cornerstone Utopia : SERENE Tower/Wing G – Commencement of Painting - Status as of 8th July 2021

Brigade Cornerstone Utopia : SERENE Tower/Wing H – Commencement of Painting - Status as of 8th July 2021

Brigade Cornerstone Utopia : SERENE Tower/Wing H – Commencement of Painting - Status as of 8th July 2021

Brigade Cornerstone Utopia : SERENE Tower/Wing H – Commencement of Painting - Status as of 8th July 2021

Brigade Cornerstone Utopia : SERENE Tower/Wing H – Commencement of Painting - Status as of 8th July 2021

Serene Tower/Wing B : Casting of Terrace Floor Slab – Status as of 8th July 2021

Serene Tower/Wing B : Casting of Terrace Floor Slab – Status as of 8th July 2021

Tranquil Tower/Wing M : Casting of Ground Floor Slab - Status as of 6th July 2021

Paradise Tower L : Completion of Raft/Footings Milestone - Status as of 2nd July 2021

Serene Tower A : 26th Floor slab structure works in progress – Status as of June 2021

Serene Tower B : Terrace Floor slab structure works in progress - Status as of June 2021

Serene Tower C : 25th Floor slab structure works in progress - Status as of June 2021

Serene Tower D : 25th Floor slab structure works in progress - Status as of June 2021

Serene Tower E : Above Terrace structure works in progress - Status as of June 2021

Serene Tower F : Above Terrace structure works in progress - Status as of June 2021

Serene Tower G : Above Terrace structure works in progress - Status as of June 2021

Serene Tower H : Above Terrace structure works in progress - Status as of June 2021

Serene Tower C – E Low-rise : Above Terrace structure works in progress Status as of June 2021

Serene Tower E – G Low-rise : Above Terrace structure works in progress - Status as of June 2021

Serene Tower B – C Low-rise : Fourth floor slab structure works in progress - Status as of June 2021

Serene Flooring - Tower A, Tower C, Tower E, Tower G, Tower E-G - Status as of June 2021

Eden Overall view – Status as of June 2021

Eden Tower A : Part 20th & 18th Floor structure works in progress – Status as of June 2021

Eden Tower B : 7th Floor structure work in progress – Status as of June 2021

Eden Tower C : Part Terrace & 23rd Floor structure works in progress – Status as of June 2021

Eden Tower D : Terrace Floor structure completed. Above terrace works in progress – Status as of June 2021

Eden Tower E : Terrace floor structure works in progress – Status as of June 2021

Eden Tower A, Tower C, Tower E : Flooring – Status as of June 2021

Clubhouse : Part 2nd floor & 3rd floor structure works in progress - Status as of June 2021

Arcadia : Podium part Upper basement slab & Ground floor slab in progress - Status as of June 2021

Paradise Tower F : Foundation and retaining wall works in progress - Status as of June 2021

Paradise Tower L : Foundation works in progress. Tower J & K : Retaining wall works in progress - Status as of June 2021

Elysium : Footings, UG sump and STP works in progress - Status as of June 2021

Tranquil Overall view - Status as of June 2021

Tranquil Tower K & L : Ground Floor structure completed - Status as of June 2021

Tranquil Tower M : Ground Floor slab structure works in progress - Status as of June 2021

Tranquil Tower N : Ground Floor slab structure works completed - Status as of June 2021

Tranquil Tower O : Upper Basement slab structure works in progress. Tranquil Tower P : Upper Basement slab structure works in progress - Status as of June 2021

Tranquil Tower Q : Ground Floor slab structure works completed - Status as of June 2021

Eden Tower D : Completion of 8th floor slab Milestone – Status as of 24th June 2021

Eden Tower B : Completion of 6th floor slab Milestone – Status as of 21st June 2021

Serene Tower/Wing C : On Casting of 24th Floor Slab – Status as of 18th June 2021

Serene Tower/Wing D : On Casting of 24th Floor Slab – Status as of 15th June 2021

Eden Tower C : Completion of 20th floor slab Milestone - Status as of 7th June 2021

Eden Tower A : Completion of 16th floor slab Milestone - Status as of 7th June 2021

Eden Tower C Block : Commencement of painting – Status as of May 27th 2021

Eden Tower C Block : Commencement of painting – Status as of May 27th 2021

Eden Tower C Block : Commencement of painting – Status as of May 27th 2021

Eden Tower C Block : Commencement of painting – Status as of May 27th 2021

Eden Tower E Block : Commencement of painting – Status as of May 27th 2021

Eden Tower E Block : Commencement of painting – Status as of May 27th 2021

Eden Tower E Block : Commencement of painting – Status as of May 27th 2021

Serene Tower progress – Status as of May 2021

Serene Tower A : 25th Floor slab structure works in progress. Serene Tower B : Terrace Floor slab structure works in progress – Status as of May 2021

Serene Tower C : 23rd Floor slab structure works in progress. Serene Tower D : 24th Floor slab structure works in progress progress – Status as of May 2021

Serene Tower E : Above Terrace structure works in progress. Serene Tower F : Above Terrace structure works in progress progress – Status as of May 2021

Serene Tower G : Above Terrace structure works in progress. Serene Tower H : Above Terrace structure works in progress progress – Status as of May 2021

Serene Tower C - E Low-rise : Above Terrace structure works in progress progress – Status as of May 2021

Serene Tower E & G Low-rise : Above Terrace structure works in progress progress – Status as of May 2021

Serene Tower B & C Low-rise : Third floor slab structure works in progress progress – Status as of May 2021

Eden Towers - Status as of May 2021

Eden Tower A : Part 16th & 18th Floor structure works in progress - Status as of May 2021

Eden Tower B : Part 6th Floor structure work in progress - Status as of May 2021

Eden Tower C : Part 20th & 25th Floor structure works in progress - Status as of May 2021

Eden Tower D : Part Terrace Floor structure works in progress - Status as of May 2021

Eden Tower E : 26th floor structure works in progress - Status as of May 2021

Clubhouse : Second floor structure works in progress – Status as of May 2021

Halcyon Tower I : 9th floor slab structure work in progress & Halcyon Tower J : 3rd floor slab structure work in progress - Status as of May 2021

Arcadia : Footings in podium area in progress. Podium part Upper basement slab & Ground floor slab in progress - Status as of May 2021

Tower K : GF slab completed; Tower L : GF slab completed. Tower M : UBL structure works in progress; Tower N : GF slab completed. Tower O : UBL structure works in progress; Tower P : UBL structure works in progress. Tower Q : GF structure works in progress - Status as of May 2021

Paradise Tower L : Foundation works in progress. Paradise Tower J & K : Retaining wall works in progress - Status as of May 2021

Elysium : STP works in progress - Status as of May 2021

Elysium : UG Sump Raft progress - Status as of May 2021

Tranquil Building Tower N : On Casting of Ground Floor Slab – Status as of May 31st 2021

Eden Tower C and E Block : Commencement of painting – Status as of May 27th 2021

Eden Tower C and E Block : Commencement of painting – Status as of May 27th 2021

Eden Tower D : Completion of 7th floor slab Milestone – Status as of May 19th 2021

Serene Tower/Wing A : On Casting of 24th Floor – Status as of 19th May 2021

Serene Tower/Wing A : On Casting of 24th Floor – Status as of 19th May 2021

Halcyon : On casting of 8th floor Slab - Tower I completed – Status as of 19th May 2021

Eden Tower E : On Completion of 24th floor slab - Status as of 6th May 2021

Tranquil Tower O : On Casting of Footing – Status as of May 4th 2021

Tranquil Tower O : On Casting of Footing – Status as of May 4th 2021

Serene Tower – Status as of April 2021

Serene Tower A : 24th Floor slab structure works in progress. Serene Tower B : 25th Floor slab structure works in progress – Status as of April 2021

Serene Tower : C 21st Floor slab structure works in progress. Serene Tower : D 22nd Floor slab structure works in progress – Status as of April 2021

Serene Tower E : Above Terrace structure works in progress & Serene Tower F : Above Terrace structure works in progress – Status as of April 2021

Serene Tower G : Above Terrace structure works in progress. Serene Tower H : Above Terrace structure works in progress – Status as of April 2021

Serene Tower C & E Low-rise : Above Terrace structure works in progress – Status as of April 2021

Serene Tower E & G Low-rise : Above Terrace structure works in progress – Status as of April 2021

Serene Tower B & C Low-rise : Third floor slab structure works in progress – Status as of April 2021

Eden Tower – Status as of April 2021

Eden Tower A : Part 13th, 17th & 18th Floor structure works in progress – Status as of April 2021

Eden Tower B : Part 6th Floor structure work in progress – Status as of April 2021

Eden Tower C : Part 17th & 23rd Floor structure works in progress – Status as of April 2021

Eden Tower D : Part 7th & 8th Floor structure works in progress – Status as of April 2021

Eden Tower E : 23rd & 24th floor structure works in progress – Status as of April 2021

Clubhouse : second floor structure works in progress – Status as of April 2021

Halcyon Tower I : 7th floor slab structure work in progress & Halcyon Tower J : 1st floor slab structure work in progress - Status as of April 2021

Arcadia : Footings in podium area in progress. Podium part Upper basement slab & Ground floor slab in progress – Status as of April 2021

Tranquil Tower K : GF structure works in progress. Tranquil Tower L : GF structure works in progress. Tranquil Tower M : UBL structure works in progress. Tranquil Tower N : GF structure works in progress. Tranquil Tower O : Foundation works in progress. Tranquil Tower P : Foundation works in progress. Tranquil Tower Q : GF structure works in progress – Status as of April 2021

Paradise Tower L : Foundation works in progress – Status as of April 2021

Paradise Tower L : Foundation works in progress – Status as of April 2021

Elysium Foundation works in progress – Status as of April 2021

Elysium Foundation works in progress – Status as of April 2021

Serene B : On Casting of 24th Floor Slab - Status as of 22nd April 2021

Serene B : On Casting of 24th Floor Slab - Status as of 22nd April 2021

Serene C – On Casting of 20th Floor Slab - Status as of 15th April 2021

Serene C : On Casting of 20th Floor Slab - Status as of 15th April 2020

Serene F : On Casting of Terrace Floor Slab - Status as of 15th April 2020

Tranquil Building Tower N : On Casting of Upper Basement slab – Status as of 11th April 2021

Eden Tower A : On Completion of Twelfth floor slab Milestone completed – Status as of 10th April 2021

Serene G : On Casting of Terrace Floor Slab – Status as on 8th April 2021

Eden Tower C : Completion of Sixteenth floor slab Milestone – Status as of 6th April 2021

Serene Tower E : On Casting of terrace floor slab – Status as of 5th April 2021

Eden Tower D : On Completion of Sixth floor slab Milestone - Status as of 3rd April 2021

Serene Tower H : On Casting of Terrace Floor Slab – Status as of 31st March 2021

Serene Tower H : On Casting of Terrace Floor Slab – Status as of 31st March 2021

Serene Tower A : 22nd Floor slab structure works in progress. And Serene Tower B : 23rd Floor slab structure works in progress – Status as of March 2021

Serene Tower : C 20th Floor slab structure works in progress. And Serene Tower : D 21st Floor slab structure works in progress – Status as of March 2021

Serene Tower E : Terrace slab structure works in progress. And Serene Tower F : Terrace slab structure works in progress – Status as of March 2021

Serene Tower G : Terrace slab structure works in progress. And Serene Tower H : Terrace slab structure works completed – Status as of March 2021

Serene C – E Low-rise : Terrace slab completed – Status as of March 2021

Serene Tower E – G Low-rise : Terrace Floor slab completed – Status as of March 2021

Serene Tower B – C Low-rise : Second floor slab structure works in progress – Status as of March 2021

Serene All Towers : Flooring commenced - Status as of March 2021

Eden Tower A : Part 10th, 14th & 18th Floor structure works in progress – Status as of March 2021

Eden Tower B : Part 5th Floor structure work in progress - Status as of March 2021

Eden Tower C : Part 16th & 22nd Floor structure works in progress - Status as of March 2021

Eden Tower D : Part 6th & 7th Floor structure works in progress - Status as of March 2021

Eden Tower E : 22nd floor structure works in progress - Status as of March 2021

Eden Towers A, C & E : Flooring Commenced - Status as of March 2021

Part First floor & Part second floor structure works in progress – Status as of March 2021

Halcyon Tower I : Fifth floor slab structure work in progress & Halcyon Tower J : First floor slab structure work in progress progress – Status as of March 2021

Arcadia : Footings in podium area in progress Podium part Upper basement slab & Ground floor slab in progress progress – Status as of March 2021

Tranquil : Footings for Tower O in progress. Footings in Towers Q, K, L ,M , N & P are completed. Upper Basement slab in Towers N in progress. Tranquil Towers Q, K, L & M completed. Ground floor slab in Tower Q & K in progress – Status as of March 2021

Tranquil Tower P : On Casting of Footings – Status as of 31st March 2021

Halcyon Tower I : On Casting of Fourth floor slab - Status as of 25th March 2021

Halcyon Tower J : On casting of Ground floor Slab - 18th March 2021

Serene Tower/Wing D : On Casting of 20th Floor Slab - 17th March 2021

Eden Tower E : Completion of 20th floor slab Milestone - Status as of 17th March 2021

Tranquil Tower Q : On Casting of Upper basement floor slab - Status as of 15th March 2021

Tranquil Tower L : On Casting of Upper Basement slab - 12th March 2021

Tranquil Tower L : On Casting of Upper Basement slab - 12th March 2021

Tranquil Tower M : On Casting of Upper Basement Slab - 12th March 2021

Tranquil Tower M : On Casting of Upper Basement Slab - 12th March 2021

Serene Tower A : 21st Floor slab structure works in progress. Serene Tower B : 21st Floor slab structure works in progress – Status as of February 2021

Serene Tower : C 17th Floor slab completed. Serene Tower : D 20th Floor slab structure works in progress – Status as of February 2021

Serene Tower E : 25th Floor slab structure works in progress. Serene Tower F : 25th Floor slab structure works in progress – Status as of February 2021

Serene Tower G : 25th Floor slab structure works in progress. Serene Tower H : 25th Floor slab structure works in progress – Status as of February 2021

Serene Tower C - E Low-rise : Serene Terrace slab completed – Status as of February 2021

Serene Tower E - G Low-rise : Serene Terrace Floor slab completed – Status as of February 2021

Serene Tower B - C Low-rise : Serene First floor slab structure works in progress – Status as of February 2021

All Serene Towers : Flooring commenced – Status as of February 2021

Eden Tower A : Part 14th & 16th Floor structure works in progress – Status as of February 2021

Eden Tower B : Part 5th Floor structure work in progress – Status as of February 2021

Eden Tower C : Part 13th & 20th Floor structure works in progress - Status as of February 2021

Eden Tower D : Part 6th Floor structure works in progress – Status as of February 2021

Eden Tower E : 20th floor structure works in progress – Status as of February 2021

Eden Towers A, C & E : Flooring Commenced – Status as of February 2021

Clubhouse : First floor structure works in progress – Status as of February 2021

Halcyon Tower I : Third floor slab work in progress & Halcyon Tower J : Part first floor slab work and part ground floor in progress – Status as of February 2021

Arcadia : Footings in podium area in progress. Podium part UB slab in progress – Status as of February 2021

Tranquil : Footings for Towers P & O in progress. Footings in Towers Q, K, L, M & N are completed UB slab in Towers Q, L & M in progress. UB slab in Tower K completed – Status as of February 2021

Serene Tower/Wing F : On Casting of 24th Floor Slab is completed – Status as of 27th February 2021

Serene Tower/Wing A : On Casting of 20th Floor Slab – Status as of 25th February 2021

Serene Tower/Wing E : On Casting of 24th Floor Slab – Status as of 25th February 2021

Serene Tower/Wing G : On Casting of 24th Floor Slab is completed - Status as of 25th February 2021

Tranquil Tower K : Milestone - Casting of Upper basement floor slab dt - Status as of 20th February 2021

Eden Tower C Milestone : On Completion of 12th floor slab - Status as of 19th February 2021

Serene Tower/Wing B : Commencement of flooring - Status as of 18th February 2021

Serene Tower/Wing C : Commencement of Flooring – Status as of 18th February 2021

Serene Tower/Wing E : Commencement of flooring - Status as of 18th February 2021

Serene Tower/Wing G : Commencement of flooring - Status as of 18th February 2021

Serene Tower/Wing B : On Casting of 20th Floor Slab is completed – Status as of 18th February 2021

Serene Tower/Wing H : On Casting of 24th Floor Slab - Status as of 18th February 2021

Serene Tower C : On Casting of 16th Floor Slab - Status as of 16th Feb 2021

Eden Wing A, C, E : Project Milestones - On Commencement of Flooring - Status as of 10th February 2021

Eden Wing A, C, E : Project Milestones - On Commencement of Flooring - Status as of 10th February 2021

Eden Wing A, C, E : Project Milestones - On Commencement of Flooring - Status as of 10th February 2021

Serene Wing A, D, F, H : Project Milestones - On Commencement of Flooring – 10th February 2021

Serene Wing A, D, F, H : Project Milestones - On Commencement of Flooring – 10th February 2021

Utopia Tranquil Project Milestone Tower N - On Casting of Footing/raft – 10th February 2021

Serene Tower A : 19th Floor slab structure works in progress. Serene Tower B : 19th Floor slab structure works in progress - Status as of January 2021

Serene Tower : C 15th Floor slab completed. Serene Tower : D 19th Floor slab structure works in progress - Status as of January 2021

Serene Tower E : 23rd Floor slab structure works in progress. And Serene Tower F : 22nd Floor slab structure works in progress - Status as of January 2021

Serene Tower G : 22nd Floor slab structure works in progress. Serene Tower H : 23rd Floor slab structure works in progress - Status as of January 2021

Serene Tower C - E Low-rise : Serene Terrace slab completed - Status as of January 2021

Serene Tower E - G Low-rise : Serene Terrace Floor slab completed - Status as of January 2021

Serene Tower B-C Low-rise : Serene First floor slab structure works in progress - Status as of January 2021

Eden Tower A : 12th Floor structure works under progress - Status as of January 2021

Eden Tower B : Part 5th Floor structure work in progress - Status as of January 2021

Eden Tower C : Part 11th & 18th Floor structure works in progress - Status as of January 2021

Eden Tower D : Part 6th Floor structure works in progress - Status as of January 2021

Eden Tower E : 17th floor structure works in progress - Status as of January 2021

Clubhouse : Ground Floor and First floor structure works in progress – Status as of January 2021

Halcyon Tower I : First Floor and Second floor slab work in progress. And Halcyon Tower J : Ground floor slab work in progress – Status as of January 2021

Arcadia - Footings in podium area in progress and Podium part UB slab in progress – Status as of January 2021

Tranquil - Footings for Towers N & P in progress and Footings in Towers Q, K, L & M are completed - Status as of January 2021

Eden Tower/Wing E – On Casting of 16th Floor Slab is completed – Status as of 30th January 2021

Tranquil Tower M - On casting of footing / raft – Status as of 16th January 2021

Tranquil Tower M - On casting of footing / raft – Status as of 16th January 2021

Tranquil Tower M - On casting of footing / raft – Status as of 16th January 2021

Tranquil Tower M - On casting of footing / raft – Status as of 16th January 2021

Serene Tower / Wing F – On Casting of 20th Floor Slab is completed – 13th January 2021

Serene Tower / Wing F – On Casting of 20th Floor Slab is completed – 13th January 2021

Serene Tower / Wing G – Casting of 20th Floor Slab is completed – Status as of 8th January 2021

Serene Tower / Wing G – Casting of 20th Floor Slab is completed – Status as of 8th January 2021

Tranquil Tower L - On Casting of footing / raft - Status as of 8th January 2021

Serene Tower E - On Casting of 20th Floor Slab – 4th January 2021

Serene – View from central spine – Status as of December 2020

Serene Tower A : 18th Floor slab structure works in progress. And Serene Tower B : 17th Floor slab structure works in progress – Status as of December 2020

Serene Tower – C 15th Floor slab structure works in progress. And Serene Tower – D 18th Floor slab structure works in progress – Status as of December 2020

Serene Tower E - 20th Floor slab structure works in progress. And Serene Tower F 20th Floor slab structure works in progress – Status as of December 2020

Serene Tower G 20th Floor slab structure works in progress. And Serene Tower H 21st Floor slab structure works in progress – Status as of December 2020

Serene Tower C - E Low-rise : Serene Terrace slab completed – Status as of December 2020

Serene Tower E - G Low-rise : Serene Terrace Floor slab structure works in progress – Status as of December 2020

Eden Tower A - 10th Floor structure works under progress - Status as of December 2020

Eden Tower B – Part 5th Floor structure work in progress - Status as of December 2020

Eden Tower C – Part 11th & 15th Floor structure works in progress - Status as of December 2020

Eden Tower D – Part 5th Floor structure works in progress - Status as of December 2020

Eden Tower E – Part 12th & 14th floor structure works in progress - Status as of December 2020

Clubhouse - Ground Floor structure works in progress – Status as of December 2020

Halcyon Tower I : First Floor slab work in progress. And Halcyon Tower J : Ground floor slab work in progress – Status as of December 2020

Arcadia - Footings in podium area in progress - Podium part UB slab in progress – Status as of December 2020

Tranquil - Footings for Towers L, M, N & P in progress – Status as of December 2020

Eden Wing E - Project Milestones - On Casting of 12th floor slab - 31st December 2020

Serene B05 Tower/Wing B - On Casting of 16th Floor Slab - Status as of 27th December 2020

Halcyon - On Casting of Basement 01 Slab - Tower J - 22nd December 2020

Serene Tower/Wing H - On Casting of 20th Floor Slab – Status as of 20th December 2020

Serene Tower/Wing D – Casting of 16th Floor Slab is completed - 11th December 2020

Serene Tower/Wing A – Casting of 16th Floor Slab is completed - 11th December 2020

Tranquil Tower K - Completion of Footing / Raft Milestone - Status as of 11th December 2020

Tranquil Tower K - Completion of Footing / Raft Milestone - Status as of 11th December 2020

Tranquil Tower K - Completion of Footing / Raft Milestone - Status as of 11th December 2020

Halcyon Tower I - Casting of Ground floor Slab - Status as of 3rd December 2020

EDEN B03 Tower A - on casting of 8th floor slab – Status as of 1st December 2020

Tranquil - Retaining wall raft: 213/625 meters & Retaining Wall: 160/625 meter Completed. Total footings for K,L,M,N,O,P & Q towers – 93/419 No's completed. Tower Q - 47/47 footings completed. Columns – 39/551 No’s completed; PCC – 2000/6217 Sq.m - Status as of November 2020

Brigade Cornerstone Utopia Serene Towers – View from central spine - Status as of November 2020

Serene Tower A - 16th Floor slab structure works in progress & Serene Tower B - 15th Floor slab structure works in progress spine - Status as of November 2020

Serene Tower C – 14th Floor slab structure works in progress & Serene Tower D – 16th Floor slab structure works in progress - Status as of November 2020

Serene Tower E - 18th Floor slab structure works in progress & Serene Tower F - 18th Floor slab structure works in progress spine - Status as of November 2020

Serene Tower G - 18th Floor slab structure works in progress & Serene Tower H - 19th Floor slab structure works in progress - Status as of November 2020

Serene Tower C - E Low-rise : Serene Tower C & E Terrace slab completed - Status as of November 2020

Serene Tower E & G - 7th Floor slab structure works in progress - Status as of November 2020

Arcadia - Retaining wall raft – 180/375 Rmt  & Retaining wall – 180/375 Rmt completed. Footings : 57/121 No's completed & 36/139 No's column completed. Tower area footing PCC of 2600/2725 Sq. m completed – Status as of November 2020

Halcyon Tower I : Ground Floor slab work in progress & Tower J : First Basement slab work in progress - Status as of November 2020

Ground Floor 1195 / 2300 Sq. m completed – Status as of November 2020

Eden Tower A - 9th Floor structure works under progress - Status as of November 2020

Eden Tower B – 4th Floor slab completed - Status as of November 2020

Eden Tower C – 12th & 13th Floor structure works under progress - Status as of November 2020

Eden Tower D – 5th Floor structure works under progress - Status as of November 2020

Eden Tower E – 12th Floor structure works under progress - Status as of November 2020

Eden Tower B - On Casting of fourth floor slab Completion - 30th November 2020

Tranquil Tower Q - Milestone - On Casting of Footing/raft – Status as of 23rd November 2020

Tranquil Tower Q - Milestone - On Casting of Footing/raft – Status as of 23rd November 2020

Tranquil Tower Q - Milestone - On Casting of Footing/raft – Status as of 23rd November 2020

Serene Wing G - On Casting of Sixteenth floor slab - Status as of 21st November 2020

Serene Wing F - On Casting of Sixteenth floor slab – Status as of 18th November 2020

Serene Wing E - On Casting of Sixteenth floor slab – Status as of 17th November 2020

Halcyon Tower J - On casting of Basement 2 floor Slab – Status as of 6th November 2020

Serene Wing C - On Casting of Twelfth floor slab - Status as of 3rd November 2020

Serene Towers Front view - Status as of October 2020

Serene Tower A - 14th Floor slab structure works in progress. Serene Tower B - 13th Floor slab structure in progress - Status as of October 2020

Serene Tower C - 12th Floor slab structure works in progress. Serene Tower C & D - 14th Floor slab structure works in progress - Status as of October 2020

Serene Tower E - 14th Floor slab structure works completed. Serene Tower F - 15th Floor structure works completed - Status as of October 2020

Serene Tower G - 14th Floor slab structure works completed. Serene Tower H - 16th Floor slab structure works completed - Status as of October 2020

Serene Tower C - E Low rise 9th Floor slab structure works completed - Status as of October 2020

Serene Tower E - G Low Rise 5th Floor slab structure works in progress - Status as of October 2020

Eden Tower A - 6th & 7th Floor structure works under progress - Status as of October 2020

Eden Tower B – 3rd Floor structure works under progress - Status as of October 2020

Eden Tower C - 11th Floor structure works under progress - Status as of October 2020

Eden Tower D - 5th Floor structure works under progress - Status as of October 2020

Eden Tower - E 10th Floor structure works under progress - Status as of October 2020

Serene B05 Tower / Wing H - On Casting of 16th Floor Slab - Status as of October 29th 2020

Eden Wing B - On Casting of Second Floor slab - Status as of 17th October 2020

Serene Wing B - On Casting of Twelfth floor slab - Status as of 17th October 2020

Serene Wing B - On Casting of Twelfth floor slab - Status as of 17th October 2020

Halcyon Tower I - On Casting of first basement slab - October 10th 2020

GF 670 / 2670 Sqm completed - Status as of October 2020

GF 670 / 2670 Sqm completed - Status as of October 2020

Halcyon Tower Basement - On Completion of 02 floor slab, 01 floor slab - Work in Progress and Tower J Basement 02 floor slab Work in Progress - Status as of October 2020

Arcadia - Total Estimated Qty – 85,000 Cum, Excavated Qty-55,000 Cum. Retaining wall raft – 108/375 Rmt & Retaining wall – 50/375 Rmt completed. Footing Progress 15/103 Nos completed & 7/117 Nos column completed - Status as of October 2020

Tranquil - Total Estimated Qty – 1,60,000 Cum, Excavated Qty – 1,30,000 Cum. Retaining wall raft in Q tower 40/585 Rmt. Q Tower PCC 600/6217 Sqm Completed - Status as of October 2020

Tranquil - Total Estimated Qty – 1,60,000 Cum, Excavated Qty – 1,30,000 Cum. Retaining wall raft in Q tower 40/585 Rmt. Q Tower PCC 600/6217 Sqm Completed - Status as of October 2020

Serene Tower A 12th Floor slab structure works completed. Tower B 11th Floor slab structure works completed – Status as of September 2020

Serene Tower – C 10th Floor slab structure works completed. Tower – D 12th Floor slab structure works completed – Status as of September 2020

Serene Tower E 14th Floor slab structure works completed. Tower - F 14th Floor slab structure works under progress – Status as of September 2020

Serene Tower G 13th Floor slab structure works completed. Tower H 14th Floor slab structure works completed – Status as of September 2020

Serene Tower C & E Low-rise - 8th Floor structure works under progress – Status as of September 2020

Serene G & E Extension - 4th Floor structure works under progress – Status as of September 2020

Serene B05 Tower/Wing A – Casting of 12th Floor Slab was completed on September 4th 2020

Eden Tower A Completion of Fourth floor slab Milestone - Status as of September 2020

Eden - Tower A - 4th & 5th Floor structure works under progress – Status as of September 2020

Eden Tower B - 3rd Floor structure works under progress - Status as of September 2020

Eden Tower C - 10th Floor structure works under progress - Status as of September 2020

Eden Tower D - 5th Floor structure works under progress - Status as of September 2020

Eden Tower E - 9th Floor structure works under progress - Status as of September 2020

Serene Wing D - On Casting of 12th floor slab – Status as of 30th September 2020

Eden Wing E - On Casting of 8th floor slab – Status as of 30th September 2020

Eden Tower D – On Casting of Fourth floor slab - Status as of 25th September 2020

Eden Tower C - On casting of 8th floor slab - Status as of 19th September - 2020

Serene Tower G - On Casting of 12th Floor Slab - 16th September 2020

Eden B03 Tower B - On Casting of 1st Floor Slab - 16th September 2020

Serene B05 Tower/Wing F - Casting of 12th Floor Slab is completed – Status as of September 2020

Project Milestones Utopia Serene Wing C - On Casting of Eighth floor slab – Status as of September 2020

Project Milestones Utopia Serene Wing C - On Casting of Eighth floor slab - Status as of September 2020

Project Milestones Utopia Serene Wing E - On Casting of Twelfth floor slab – Status as of September 2020

Project Milestones Utopia Serene Wing E - On Casting of Twelfth floor slab - Status as of September 2020

Project Milestones Utopia Serene Wing H - On Casting of Twelfth floor slab - Status as of September 2020

Front elevation view of the Serene block – Status as of August 2020

Serene Tower - Status as of August 2020

Serene Tower A 11th floor slab in progress & Tower B 10th floor slab completed – Status as of August 2020

Serene Tower C 8th floor slab in progress & Tower D 11th floor slab in progress - Status as of August 2020

Serene Tower E 12th floor slab in progress & Tower F 12th floor slab in progress - Status as of August 2020

Serene Tower G 12th floor slab in progress & Tower H 12th floor slab in progress - Status as of August 2020

Serene Low rise between C & E - 7th Floor slab work under progress - Status as of August 2020

Serene Low rise between G & E - 3rd Floor slab work under progress - Status as of August 2020

Eden Tower A - Part of 2nd Floor slab and part of 3rd floor slab in progress - Status as of August 2020

Eden Tower B – First floor slab in progress - Status as of August 2020

Eden Tower C - Part of 7th floor & part of 8th floor slab work in progress - Status as of August 2020

Eden Tower D - 4th floor slab work under progress - Status as of August 2020

Eden Tower E – Part of 6th floor slab work and part of 7th floor slab work under progress - Status as of August 2020

Eden Wing E - On Casting of Fourth floor slab - Status as of August 11th 2020

Eden Wing B - On Casting of Ground floor slab - Status as of August 5th 2020

Eden Wing B - On Casting of Ground floor slab - Status as of August 5th 2020

Halcyon Tower I : Basement - 2 completed. Basement-1 slab work in progress - Status as of August 2020

Halcyon Tower I & J : Basement - 3 columns and Basement - 2 slabs work in progress - Status as of August 2020

Club House - Basement structure work under progress - Status as of August 2020

Club House – Basement structure work under progress - Status as of August 2020

Cineplex & Retail - Arcadia Excavation Completed. Retaining wall work in progress - Status as of August 2020

Cineplex & Retail - Arcadia Excavation Completed. Retaining wall work in progress - Status as of August 2020

Tranquil Tower K, L, M, N, O, P & Q Excavation under progress - Status as of August 2020

Serene Tower A 9th floor slab in progress & Tower B 8th floor slab completed - Status as of July 2020

Serene Tower C 6th floor slab in progress & Tower D 9th floor slab in progress - Status as of July 2020

Serene Tower E 10th floor slab in progress & Tower F 10th floor slab in progress - Status as of July 2020

Serene Tower G 11th floor slab in progress & Tower H 10th floor slab in progress - Status as of July 2020

Serene Low rise between C & E Tower - 7th Floor slab work under progress - Status as of July 2020

Serene Low rise between G & E Tower - 3rd Floor slab work under progress - Status as of July 2020

Eden Tower A - Part of 2nd Floor slab and part of 3rd floor slab in progress - Status as of July 2020

Eden Tower B - Ground floor slab in progress - Status as of July 2020

Eden Tower C - 5th floor slab work in progress - Status as of July 2020

Eden Tower D - 3rd floor slab work under progress - Status as of July 2020

Eden Tower E - Part of 4th floor slab work and part of 5th floor slab work under progress - Status as of July 2020

Halcyon Tower I & J foundation completed - Status as of July 2020

Club House – Basement structure work under progress - Status as of July 2020

Club House – Basement structure work under progress - Status as of July 2020

Cineplex & Retail - Arcadia Excavation Completed - Status as of July 2020

Cineplex & Retail - Arcadia Excavation Completed - Status as of July 2020

Tranquil Tower K, L, M, N, O, P & Q Excavation under progress - Status as of July 2020

Tranquil Tower K, L, M, N, O, P & Q Excavation under progress - Status as of July 2020

Serene – Tower B – Casting of 8th Floor Slab Completion - 30th-July-2020

Serene – Tower B – Casting of 8th Floor Slab Completion - 30th-July-2020

Serene D - On casting of 8th floor slab - Status as of 14th-July-2020

Serene D - On casting of 8th floor slab - Status as of 14th-July-2020

Serene E - Casting of Eighth floor slab complete - Status as of 06-July-2020

Halcyon - Tower I & J Upper basement structure work under progress - Status as of June 2020

Tranquil - Tower K, L, M, N, O, P & Q Excavation under progress - Status as of June 2020

Club House - Basement structure work under progress - Status as of June 2020

Arcadia Cineplex & Retail - Excavation under progress - Status as of June 2020

Serene - Tower A & B - Tower A - 9th Floor & Tower B - 7th Floor structure works under progress - Status as of June 2020

Serene - Tower C & D - Tower C - 6th Floor & Tower D - 8th Floor structure works under progress - Status as of June 2020

Serene - Tower E & F - Tower E - 8th Floor & Tower F - 10th Floor structure works under progress - Status as of June 2020

Serene - Tower G & H, 10th Floor structure works under progress - Status as of June 2020

Serene – C & E Low-rise, 7th Floor structure works under progress - Status as of June 2020

Serene – Tower G & E, 3rd Floor structure works under progress - Status as of June 2020

Eden - Tower A - Second floor structure work under progress - Status as of June 2020

Eden - Tower B - Ground floor structure work under progress - Status as of June 2020

Eden - Tower C - Fifth floor structure work under progress - Status as of June 2020

Eden - Tower D - Casting of Second floor slab completed – Status as of 04-July-2020

Halcyon - Tower I - Raft completed - Status as of May 2020

Halcyon - Tower J - Raft work under progress - Status as of May 2020

Tranquil - Excavation work in Progress - Status as of May 2020

Tranquil - Excavation work in Progress - Status as of May 2020

Serene - Tower A - 8th Floor slab Casting Completed & Tower B - 5th Floor slab structure works under progress - Status as of May 2020

Serene - Tower C - 5th Floor slab structure works under progress - Status as of May 2020

Serene - Tower D - 8th Floor slab structure works in progress - Status as of May 2020

Serene - Tower E - 7th Floor slab structure works under progress - Status as of May 2020

Serene - Tower F - 9th Floor slab structure works under progress - Status as of May 2020

Serene - Tower G - 8th Floor slab structure work in progress & Tower H - 10th Floor slab structure works under progress - Status as of May 2020

Serene - C & E Low-rise - Tower C - 6th Floor slab structure works under progress - Status as of May 2020

Serene - Tower G & E low rise - Tower G - 3rd Floor slab structure works under progress - Status as of May 2020

Eden - Tower A - Part of First floor slab and part of Second Floor slab structural work in progress - Status as of May 2020

Eden - Tower B - Upper basement slab work in progress - Status as of May 2020

Eden - Tower C - Fourth floor slab structure work in progress - Status as of May 2020

Eden - Tower D - Part of First floor slab and part of second floor slab structure work in progress - Status as of May 2020

Eden - Tower E - Part of First floor slab and part of Second Floor slab structural work in progress - Status as of May 2020

Serene – B05 Tower/Wing F – Casting of 8th Floor Slab was completed - Status as of May 2020

Ground floor slab shuttering work in progress - Status as of March 2020

Halcyon - Foundation work of Tower I and J in progress - Status as of March 2020

Arcadia - Excavation Completed - Status as of March 2020

Tranquil - Excavation in progress - Status as of February 2020

Serene - Tower A – 8th Floor Slab Work in progress - Status as of March 2020

Serene - Tower B – 4th Floor Slab Completed & 5th Floor Slab work in progress - Status as of March 2020

Serene - Tower C – 4th Floor Slab Completed & 5th Floor Slab work in progress - Status as of March 2020

Serene - Tower D – 8th Floor Slab Work in progress - Status as of March 2020

Serene - Tower E – 6th Floor slab works under progress - Status as of March 2020

Serene - Tower F – 8th Floor slab works in progress - Status as of March 2020

Serene - Tower G – 8th Floor slab works in progress - Status as of March 2020

Serene - Tower H – 8th Floor Slab Work Completed & 9th Floor slab works in progress - Status as of March 2020

Serene - Tower C & E – 6th Floor slab works in progress - Status as of March 2020

Serene - Tower G & E – 3rd Floor slab works under progress - Status as of March 2020

Eden - Tower A - First floor slab works under progress and Part of Second floor slab works under progress - Status as of March 2020

Eden - Tower B - Upper Basement slab work in progress - Status as of March 2020

Eden - Tower C - Third floor slab completed - Status as of March 2020

Eden - Tower D - Second floor slab half part of work is completed - Status as of March 2020

Eden - Tower E - First floor slab half part of work is completed, Second floor slab work under progress - Status as of March 2020

Excavation Completed , 38/51 Footing, 36/69 Columns upto UBL & 122 Rmt / 247 Rmt Retaining wall completed - under progress - Status as of February 2020

Halcyon - Excavation completed , 56/191 Footings, 12/245 Column upto UBL & Retaining wall raft 232/547 Rmt, Wall 179/547 Rmt completed - under progress - Status as of February 2020

Arcadia - Excavation Under Progress - 44,000 out of 80,000 Cum completed, PCC started on 26th Feb’20 - under progress - Status as of February 2020

Tranquil - Excavation Under Progress – 10,000 out of 1,60,000 Cum completed - under progress - Status as of February 2020

Serene - Tower A & B - Tower A – Gf to 5th Floor structure works Completed, 6th Floor, Tower B – GF to 4th Floor structure works Completed, 5th Floor under progress - Status as of February 2020

Serene - Tower C & D - Tower D – Gf to 6th Floor structure works Completed, 7th Floor, Tower C – GF to 4th Floor structure works Completed, 5th Floor under progress - Status as of February 2020

Serene - Tower C & E - GF to 3rd Floor structure works completed, 4th Floor - under progress - Status as of February 2020

Serene - Tower E & F - Tower F – Gf to 6th Floor structure works Completed, 7th Floor, Tower E – GF to 5th Floor structure works Completed, 6th Floor - under progress - Status as of February 2020

Serene - Tower G & H - Tower H – Gf to 7th Floor structure works Completed, 8th Floor, Tower G– GF to 5th Floor structure works Completed, 6th Floor - under progress - Status as of February 2020

Serene - Tower E & G - GF to 1st Floor structure works completed, 2nd Floor - under progress - Status as of February 2020

Eden - Tower A - Upper basement slab Completed - 100, GF Slab work is completed, 1st Floor floor slab – under progress - Status as of February 2020

Eden - Tower B - Footing Completed , STP Wall casted, UBL floor slab pour 1 casted – under progress - Status as of February 2020

Eden - Tower C - GF to 1st Floor structure works completed, 2nd Floor – under progress - Status as of February 2020

Eden - Tower D - GF to 1st Floor structure works completed, 2nd Floor – under progress - Status as of February 2020

Eden - Tower E - GF to 1st Floor structure works – under progress - Status as of February 2020

Excavation Completed , 33/51 Footing & 34 Rmt / 247 Rmt Retaining wall completed - Status as of February 2020

Halcyon - Excavation completed , 11/188 Footing & Retaining wall raft 196/507 Rmt completed - Status as of January 31st 2020

Arcadia - Excavation Under Progress - 30,000 out of 80,000 Cum completed - Status as of January 31st 2020

Serene - Tower A & B - Footing, Back Filling, Grade Slab, Columns till Ground floor completed, Ground floor slab for Tower Completed, Tower A – Gf to 3rd Floor Completed, 4th Floor 2/6 Flats completed, Tower B – GF to 2nd Floor Completed, 3rd Floor under progress - Status as of January 31st 2020

Serene - Tower C & D - Footing, Back Filling, Grade Slab, Columns till Ground floor completed, Ground floor slab for Tower Completed,Tower D – Gf to 4th Floor Completed, 5th Floor under progress, Tower C – GF to 2nd Floor Completed, 3rd Floor under progress - Status as of January 31st 2020

Serene - Tower C & E - Footing Completed, Back Filling, Grade Slab, Columns till Upper Basement completed, upper basement floor slab completed, GF slab Completed GF to 1st Floor 5/5 Flats completed, 2nd Floor under progress - Status as of January 31st 2020

Serene - Tower E & F - Footing, Back Filling, Grade Slab, Columns till Ground floor completed, Ground floor slab for Tower Completed, Tower F – Gf to 4th Floor Completed, 5th Floor 2/6 Flats completed, Tower E – GF to 2nd Floor Completed, 3rd Floor under progress - Status as of January 31st 2020

Serene - Tower G & H - Footing, Back Filling, Grade Slab, Columns till Ground floor completed, Ground floor slab for Tower Completed, Tower H – Gf to 5th Floor Completed, 6th Floor under progress, Tower G– GF to 3rd Floor Completed, 4th Floor under progress - Status as of January 31st 2020

Serene - Tower G & E - Footing Completed, Back Filling, Grade Slab, Columns till Upper Basement completed, upper basement completed.GF Slab Completed, 1st Floor under progress - Status as of January 31st 2020

Eden Tower A - Footing, backfilling, grade slab completed, columns till upper basement completed, upper basement slab most of the work is Completed & GF Slab Work in progress - Status as of January 31st 2020

Eden - Tower B - Mass Excavation completed, Footing Completed , STP Walls on Progress - Status as of January 31st 2020

Eden - Tower C - Footings completed, columns till upper basement completed, UB Slab –Complete, GF Completed, 1st Floor Slab Pour-1 completed - Status as of January 31st 2020

Eden - Tower D - Footing, backfilling, grade slab completed, columns till upper basement completed, upper basement slab Completed, GF Slab Completed,1st Floor pour-1 completed - Status as of January 31st 2020

Eden - Tower E - Footing, backfilling, grade slab completed, columns till upper basement completed, Back filling Completed, UG Sump Raft Completed, UG Sump Walls & Slab Completed - Upper Basement almost work is Completed - Status as of January 31st 2020

Eden - Retaining Wall - 528/ 574 Rmt Retaining wall completed upto Upper Basement level, 119/574 Rmt Retaining wall completed upto GF level - Status as of January 31st 2020

Unit Videos



© Brigade Cornerstone Utopia - 2022  |  About Brigade  |  Disclaimer
Protected by Copyscape
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Enquire Now

Speak to us

Please select your country and enter your phone number

I Agree to the Terms & Conditions

Please wait..

Thank you for requesting a call back
Our team will get back to you shortly!