Utopia Elysium : 16th to 17th floor shear wall casting and slab shuttering WIP - Status as of October 2024
Utopia Tranquil : Basement Ventilation and EV charging station fixing works in progress - Status as of August 2024
Utopia Elysium : 15th floor to 16th floor slab shuttering and reinforcement WIP - Status as of August 2024
Utopia Paradise Tower G : Milestone Release Commencement of fixing of door & windows - Status as on 9th May 2024
Utopia Paradise Tower G : Milestone Release Commencement of fixing of door & windows - Status as on 9th May 2024
Utopia Paradise Tower G : Milestone Release On Commencement of installation of lifts - Status as on 7th May 2024
Utopia Paradise Tower I : Milestone Release On Commencement of fixing of door & windows - Status as on 7th May 2024
Utopia Paradise Tower I : Milestone Release On Commencement of fixing of door & windows - Status as on 7th May 2024
Utopia Paradise Tower I : Milestone Release On Commencement of fixing of door & windows - Status as on 7th May 2024
Utopia Paradise Tower K : Milestone Release On Commencement of Installation of lifts - Status as on 6th May 2024
Utopia Paradise Tower K : Milestone Release On Commencement of Doors and windows - Status as on 3rd May 2024
Utopia Paradise Tower K : Milestone Release On Commencement of Doors and windows - Status as on 3rd May 2024
Utopia Paradise Tower K : Milestone Release On Commencement of Doors and windows - Status as on 3rd May 2024
Utopia Paradise Tower K : Milestone Release On Commencement of Doors and windows - Status as on 3rd May 2024
Utopia Paradise Towers F & H : Milestone Release On Commencement of Painting 18th to 26th Floor - Status as on 3rd May 2024
Utopia Paradise Towers F & H : Milestone Release On Commencement of Painting 18th to 26th Floor - Status as on 3rd May 2024
Utopia Paradise Towers F & H : Milestone Release On Commencement of Painting 18th to 26th Floor - Status as on 3rd May 2024
Utopia Paradise Towers F & H : Milestone Release On Commencement of Painting 18th to 26th Floor - Status as on 3rd May 2024
Utopia Paradise Towers F & H : Milestone Release On Commencement of Painting 18th to 26th Floor - Status as on 3rd May 2024
Utopia Paradise Towers F & H : Milestone Release On Commencement of Painting 18th to 26th Floor - Status as on 3rd May 2024
Utopia Paradise Towers F & H : Milestone Release On Commencement of Painting 18th to 26th Floor - Status as on 3rd May 2024
Utopia Paradise Towers F & H : Milestone Release On Commencement of Painting 18th to 26th Floor - Status as on 3rd May 2024
Utopia Paradise Towers F & H : Milestone Release On Commencement of Painting 18th to 26th Floor - Status as on 3rd May 2024
Paradise: Towers F and H - Milestone Release - On Commencement of fixing doors & windows - 18 to 26th Floor - Status as of April 2024
Paradise: Towers F and H - Milestone Release - On Commencement of fixing doors & windows - 18 to 26th Floor - Status as of April 2024
Paradise: Towers F and H - Milestone Release - On Commencement of fixing doors & windows - 18 to 26th Floor - Status as of April 2024
Paradise: Towers F and H - Milestone Release - On Commencement of fixing doors & windows - 18 to 26th Floor - Status as of April 2024
Paradise: Tower L - Milestone Release - On commencement of installation of lifts - Status as of April 2024
Paradise: Tower J - Milestone Release - On Commencement of Fixing of Door and Window - Status as of April 2024
Paradise: Tower J - Milestone Release - On Commencement of Fixing of Door and Window - Status as of April 2024
Utopia Paradise : Tower I – Milestone Release – On Commencement of Painting – Status as of March 2024
Paradise : Tower L - Milestone Release - On Commencement of Doors and windows 18th to 26 Floor - Status as of March 2024
Utopia Paradise Towers F, H & J : Milestone Release On Commencement of installation of lifts - Status as on 12th February 2024
Utopia Paradise Towers F, H & J : Milestone Release On Commencement of installation of lifts - Status as on 12th February 2024
Utopia Paradise Towers F, H & J : Milestone Release On Commencement of installation of lifts - Status as on 12th February 2024
Utopia Paradise Towers F, H & J : Milestone Release On Commencement of installation of lifts - Status as on 12th February 2024
Utopia Paradise Towers F, H & J : Milestone Release On Commencement of installation of lifts - Status as on 12th February 2024
Utopia Paradise Towers F, H & J : Milestone Release On Commencement of installation of lifts - Status as on 12th February 2024
Utopia Paradise Tower I : Milestone Release On Commencement of Flooring - Status as on 12th February 2024
Utopia Paradise Tower I : Milestone Release On Commencement of Flooring - Status as on 12th February 2024
Utopia Paradise Tower J : Milestone Release On Commencement of Painting 9th to 17th Floor - Status as on 2nd February 2024
Utopia Paradise Tower J : Milestone Release On Commencement of Painting 9th to 17th Floor - Status as on 2nd February 2024
Utopia Paradise Towers F & H : Commencement of Painting 9th to 17th floor – Status as on 7th February 2024
Utopia Paradise Towers F & H : Commencement of Painting 9th to 17th floor – Status as on 7th February 2024
Utopia Paradise Towers F & H : Commencement of Painting 9th to 17th floor – Status as on 7th February 2024
Utopia Paradise Towers F & H : Commencement of Painting 9th to 17th floor – Status as on 7th February 2024
Utopia Paradise Towers F & H : Commencement of Painting 9th to 17th floor – Status as on 7th February 2024
Utopia Paradise Towers F & H : Commencement of Painting 9th to 17th floor – Status as on 7th February 2024
Paradise Tower L : BA units structure works completed and Finishing works in progress - Status as of December 2023
Utopia Paradise Towers H and F : Milestone Release Fixing of Doors and Windows – Status as on 8th December 2023
Utopia Paradise Towers H and F : Milestone Release Fixing of Doors and Windows – Status as on 8th December 2023
Utopia Paradise Towers H and F : Milestone Release Fixing of Doors and Windows – Status as on 8th December 2023
Utopia Paradise Towers H and F : Milestone Release Fixing of Doors and Windows – Status as on 8th December 2023
Utopia Paradise Tower L : Milestone Release On Casting of Terrace Slab – Status as on 24nd November 2023
Utopia Tranquil Tower M : Milestone Release Commencement of fixing of d & w-18 to 26th Floor – Status as on 22nd November 2023
Utopia Tranquil Tower M : Milestone Release Commencement of fixing of d & w-18 to 26th Floor – Status as on 22nd November 2023
Utopia Tranquil Tower M : Milestone Release Commencement of fixing of d & w-18 to 26th Floor – Status as on 22nd November 2023
Utopia Tranquil Tower O : Milestone Release Commencement of fixing of d & w-18 to 26th Floor – Status as on 11th November 2023
Utopia Tranquil Tower O : Milestone Release Commencement of fixing of d & w-18 to 26th Floor – Status as on 11th November 2023
Utopia Tranquil Tower O : Milestone Release Commencement of fixing of d & w-18 to 26th Floor – Status as on 11th November 2023
Utopia Tranquil Tower O : Milestone Release Commencement of fixing of d & w-18 to 26th Floor – Status as on 11th November 2023
Utopia Tranquil Tower O : Milestone Release Commencement of fixing of d & w-18 to 26th Floor – Status as on 11th November 2023
Utopia Tranquil Tower M : Milestone Release - On Commencement of Painting Works 18 to 26th floor – Status as on 10th October 2023
Utopia Tranquil Tower M : Milestone Release - On Commencement of Painting Works 18 to 26th floor – Status as on 10th October 2023
Utopia Tranquil Tower M : Milestone Release - On Commencement of Painting Works 18 to 26th floor – Status as on 10th October 2023
Utopia Paradise Tower K : Milestone Release On Casting of 8th Floor Slab – Status as on 11th October 2023
Utopia Tranquil Tower O : Milestone Release On Commencement of Painting 18th to 26th Floor – Status as on 27th September 2023
Utopia Tranquil Tower N : Milestone Release – On Commencement of Painting 18th to 26th Floor – Status as on 23rd September 2023
Utopia Tranquil Tower N : Milestone Release – On Commencement of Painting 18th to 26th Floor – Status as on 23rd September 2023
Utopia Tranquil Tower N : Milestone Release – On Commencement of Painting 18th to 26th Floor – Status as on 23rd September 2023
Utopia Tranquil Tower L : Building (UT 05) Milestone Update On Commencement of Painting Works - 18 to 23 FL – Status as on 22nd September 2023
Utopia Tranquil Tower L : Building (UT 05) Milestone Update On Commencement of Painting Works - 18 to 23 FL – Status as on 22nd September 2023
Utopia Tranquil Tower L : Building (UT 05) Milestone Update On Commencement of Painting Works - 18 to 23 FL – Status as on 22nd September 2023
Utopia Paradise Tower K : Milestone Release On Casting of 6th to 7th Floor Slab – Status as on 20th September 2023
Utopia Paradise Tower F : Milestone Release On commencement of flooring - 9th to 17th Floor – Status as on 16th September 2023
Utopia Paradise Tower F : Milestone Release On commencement of flooring - 9th to 17th Floor – Status as on 16th September 2023
Utopia Paradise Tower F : Milestone Release On commencement of flooring - 9th to 17th Floor – Status as on 16th September 2023
Utopia Paradise Tower F : Milestone Release On commencement of flooring - 9th to 17th Floor – Status as on 16th September 2023
Utopia Paradise Tower F : Milestone Release On commencement of flooring - 9th to 17th Floor – Status as on 16th September 2023
Utopia Paradise Tower F : Milestone Release On commencement of flooring - 9th to 17th Floor – Status as on 16th September 2023
Utopia Paradise Tower H : Milestone Release On commencement of flooring - 9th to 17th Floor – Status as on 16th September 2023
Utopia Paradise Tower H : Milestone Release On commencement of flooring - 9th to 17th Floor – Status as on 16th September 2023
Utopia Paradise Tower H : Milestone Release On commencement of flooring - 9th to 17th Floor – Status as on 16th September 2023
Utopia Paradise Tower H : Milestone Release On commencement of flooring - 9th to 17th Floor – Status as on 16th September 2023
Utopia Paradise Tower J : Milestone Release On commencement of flooring - 9th to 17th Floor – Status as on 16th September 2023
Utopia Paradise Tower J : Milestone Release On commencement of flooring - 9th to 17th Floor – Status as on 16th September 2023
Utopia Paradise Tower L : Milestone Release On commencement of flooring - 9th to 17th Floor – Status as on 16th September 2023
Utopia Paradise Tower L : Milestone Release On commencement of flooring - 9th to 17th Floor – Status as on 16th September 2023
Utopia Paradise Tower L : Milestone Release On commencement of flooring - 9th to 17th Floor – Status as on 16th September 2023
Utopia Paradise Tower L : Milestone Release On commencement of flooring - 9th to 17th Floor – Status as on 16th September 2023
Utopia Paradise Tower L : Milestone Release On commencement of flooring - 9th to 17th Floor – Status as on 16th September 2023
Utopia Tranquil Tower L : Milestone Release On Commencement of fixing of d & w-18 to 26th Floor – Status as on 9th September 2023
Utopia Tranquil Tower L : Milestone Release On Commencement of fixing of d & w-18 to 26th Floor – Status as on 9th September 2023
Utopia Tranquil Tower L : Milestone Release On Commencement of fixing of d & w-18 to 26th Floor – Status as on 9th September 2023
Utopia Tranquil Tower M : Milestone Release On Commencement of flooring 18th to 26th Floor – Status as on 6th September 2023
Utopia Tranquil Tower M : Milestone Release On Commencement of flooring 18th to 26th Floor – Status as on 6th September 2023
Utopia Tranquil Tower M : Milestone Release On Commencement of flooring 18th to 26th Floor – Status as on 6th September 2023
Utopia Tranquil Tower M : Milestone Release On Commencement of flooring 18th to 26th Floor – Status as on 6th September 2023
Utopia Paradise Tower G : Milestone Release On Casting of 08th Floor Slab – Status as on 1st September 2023
Utopia Paradise Tower F : Milestone Release On Casting of Terrace Slab – Status as on 1st September 2023
Utopia Paradise Tower F : Milestone Release – On Commencement of flooring GF to 8th floor – Status as on 28th August 2023
Utopia Paradise Tower F : Milestone Release – On Commencement of flooring GF to 8th floor – Status as on 28th August 2023
Utopia Paradise Tower H : Milestone Release – On Commencement of flooring GF to 8th floor – Status as on 28th August 2023
Utopia Paradise Tower H : Milestone Release – On Commencement of flooring GF to 8th floor – Status as on 28th August 2023
Utopia Paradise Tower J : Milestone Release – On Commencement of flooring Ground to 8th Floor – Status as on 21st August 2023
Utopia Paradise Tower J : Milestone Release – On Commencement of flooring Ground to 8th Floor – Status as on 21st August 2023
Utopia Paradise Tower L : Milestone Release – On Commencement of flooring Ground to 8th Floor – Status as on 21st August 2023
Utopia Paradise Tower H : Milestone Release – On Casting of Terrace Slab – Status as on 21st August 2023
Utopia Paradise Tower J : Milestone Release On Casting of terrace slab – Status as on 18th August 2023
Utopia Tranquil Tower N : Milestone Release – On Commencement of fixing of Doors & Windows 18th to 26th Floor – Status as on 18th August 2023
Utopia Tranquil Tower N : Milestone Release – On Commencement of fixing of Doors & Windows 18th to 26th Floor – Status as on 18th August 2023
Utopia Tranquil Tower P : Milestone Release – On Commencement of Painting 18th to 26th Floor – Status as on 17th August 2023
Utopia Tranquil Tower P : Milestone Release – On Commencement of Painting 18th to 26th Floor – Status as on 17th August 2023
Utopia Tranquil Tower P : Milestone Release – On Commencement of flooring 18th to 26th Floor – Status as on 17th August 2023
Utopia Tranquil Tower O : Milestone Release On Commencement of installation of lifts – Status as on 17th August 2023
Utopia Tranquil Tower P : Milestone Release – On Commencement of Installation of Lifts – Status as on 16th August 2023
Utopia Tranquil Tower P : Milestone Release – On Commencement of Installation of Lifts – Status as on 16th August 2023
Utopia Tranquil Tower P : Milestone Release – On Commencement of Installation of Lifts – Status as on 16th August 2023
Utopia Tranquil Tower K : Milestone Release – On Commencement of Fixing of Doors & Windows 18th to 26th Floor – Status as on 9th August 2023
Utopia Tranquil Tower K : Milestone Release – On Commencement of Fixing of Doors & Windows 18th to 26th Floor – Status as on 9th August 2023
Utopia Tranquil Tower Q : Milestone Release – On commencement of Fixing of Doors and windows - 18th-26th floor – Status as on 3rd August 2023
Utopia Tranquil Tower Q : Milestone Release – On commencement of Fixing of Doors and windows - 18th-26th floor – Status as on 3rd August 2023
Utopia Paradise Tower F : Milestone Release – On Casting of 24th Floor Slab – Status as on 18th July 2023
Utopia Paradise Tower I : Milestone Release – On Casting of 8th Floor Slab – Status as on 18th July 2023
Utopia Paradise Tower H : Milestone Release – On Casting of 24th Floor Slab – Status as on 17th July 2023
Utopia Tranquil Tower K : Milestone Release On commencement of Painting Works 18th Floor to 26th Floor – Status as on 11th June 2023
Utopia Tranquil Tower O : Milestone Release - On commencement of Doors and windows 9th-18th floor – Status as on 10th June 2023
Utopia Tranquil Tower Q : Milestone Release – On commencement of Painting works 19-26thh floors – Status as on 10th June 2023
Utopia Paradise Tower J : Milestone Release – On Casting of 24th Floor Slab – Status as on 7th July 2023
Utopia Paradise Tower L : Milestone Release – On Casting of 24th Floor Slab – Status as on 24th June 2023
Utopia Tranquil Tower P : Milestone Release – On Commencement of Painting 9 to 17th Floor – Status as on 9th June 2023
Utopia Tranquil Tower P : Milestone Release – On Commencement of Painting 9 to 17th Floor – Status as on 9th June 2023
Utopia Tranquil Tower P : Milestone Release – Commencement of fixing of d & w 9 to 17th Floor – Status as on 9th June 2023
Utopia Tranquil Tower P : Milestone Release – On Commencement of Painting 9 to 17th Floor – Status as on 9th June 2023
Utopia Tranquil Tower Q : Milestone Release - On commencement of flooring 18 to 26th Floor – Status as on 9th June 2023
Utopia Paradise Tower G: Milestone Release – On Casting of 6th and 7th Floor Slab – Status as on 7th June 2023
Utopia Tranquil Tower M : Milestone Release – On Commencement of Installation of Lifts – Status as on 3rd June 2023
Utopia Tranquil Tower M : Milestone Release – On Commencement of Painting 9th to 17th Floor – Status as on 3rd June 2023
Utopia Tranquil Tower M : Milestone Release – On Commencement of Fixing of Doors & Windows – Status as on 3rd June 2023
Utopia Tranquil Tower Q : Milestone Release - On commencement of fixing of Doors and windows 9th to 17th floor – Status as on 31st May 2023
Utopia Tranquil Tower Q : Milestone Release - On commencement of fixing of Doors and windows 9th to 17th floor – Status as on 31st May 2023
Utopia Tranquil Tower Q : Milestone Release – On commencement of installation of lifts – Status as on 31st May 2023
Utopia Tranquil Tower N : Milestone Release – On commencement of Doors and windows 9th to 17th floor – Status as on 27th May 2023
Utopia Tranquil Tower N : Milestone Release – On commencement of Doors and windows 9th to 17th floor – Status as on 27th May 2023
Utopia Tranquil Tower N : Milestone Release – On commencement of Doors and windows 9th to 17th floor – Status as on 27th May 2023
Utopia Tranquil Tower N : Milestone Release - On commencement of flooring 18th to 26th floor – Status as on 27th May 2023
Utopia Tranquil Tower N : Milestone Release - On commencement of flooring 18th to 26th floor – Status as on 27th May 2023
Utopia Tranquil Tower O : Milestone Release – On Commencement of Flooring 18th to 26th Floor – Status as on 27th May 2023
Utopia Paradise Tower F: Milestone Release – On Casting of 20th Floor Slab – Status as on 22nd May 2023
Utopia Paradise Tower K : Milestone Release – On Casting of 04th Floor Slab – Status as on 15th May 2023
Utopia Paradise Tower I : Milestone Release On Casting of 6th/7th Floor Slab – Status as on 5th May 2023
Utopia Paradise Tower J: Milestone Release On Casting of 20th Floor Slab – Status as on 5th May 2023
Utopia Tranquil Tower K : Milestone Release – On commencement of flooring 18th to 26th Floor – Status as on 21st April 2023
Utopia Tranquil Tower K : Milestone Release – On commencement of flooring 18th to 26th Floor – Status as on 21st April 2023
Utopia Tranquil Tower K : Milestone Release – On commencement of flooring 18th to 26th Floor – Status as on 21st April 2023
Utopia Tranquil Tower K : Milestone Release – On commencement of flooring 18th to 26th Floor – Status as on 21st April 2023
Utopia Tranquil Tower M : Milestone Release – Commencement of Fixing of Doors & Window GF Floor to 8th Floor – Status as on 21st April 2023
Utopia Tranquil Tower M : Milestone Release – Commencement of Fixing of Doors & Window GF Floor to 8th Floor – Status as on 21st April 2023
Utopia Tranquil Tower L : Milestone Release – On Commencement of Flooring 18th to 26th Floor – Status as on 21st April 2023
Utopia Tranquil Tower L : Milestone Release – On Commencement of Fixing of Doors & Windows 08th to 17th Floor – Status as on 21st April 2023
Utopia Tranquil Tower L : Milestone Release – On Commencement of Fixing of Doors & Windows 08th to 17th Floor – Status as on 21st April 2023
Utopia Tranquil Tower K : Milestone Release – On Commencement of Fixing of Doors & Windows 09th to 17th Floor – Status as on 21st April 2023
Utopia Tranquil Tower K : Milestone Release – On Commencement of Fixing of Doors & Windows 09th to 17th Floor – Status as on 21st April 2023
Utopia Tranquil Tower P : Milestone Release – On Casting of Terrace Slab – Status as on 17th April 2023
Utopia Paradise Tower H : Milestone release On Casting of 20th Floor Slab – Status as on 5th April 2023
Utopia Paradise Tower F : Milestone Release On Casting of 16th Floor Slab – Status as on 31st March 2023
Utopia Paradise Tower L : Milestone Release – On Casting of 20th Floor Slab – Status as on 29th March 2023
Utopia Paradise Tower J : Milestone Release – On Casting of 16th Floor Slab – Status as on 21st March 2023
Utopia Tranquil Tower N : Milestone Release – On Commencement of Installation of Lifts – Status as on 17th March 2023
Utopia Tranquil Tower O : Milestone Release – On Casting of Terrace Slab – Status as on 16th March 2023
Utopia Tranquil Tower P : Milestone Release – On Casting of 24th Floor slab – Status as on 13th March 2023
Serene View : Structure works completed for all towers. QA works in progress for all towers - Status as of March 2023
Eden : All Towers structure works completed, Internal finishing & external painting in progress - Status as of March 2023
Utopia Tranquil Tower K : Milestone Release – On Commencement of Painting works 9th to 17th Floor – Status as on 28th February 2023
Utopia Tranquil Tower K : Milestone Release – On Commencement of Painting works 9th to 17th Floor – Status as on 28th February 2023
Utopia Tranquil Tower L : Milestone Release – On Commencement of Painting works 9th to 17th Floor – Status as on 28th February 2023
Utopia Tranquil Tower O : Milestone Release – On Commencement of Doors & Windows Ground to 8th Floor – Status as on 28th February 2023
Utopia Tranquil Tower O : Milestone Release – On Commencement of Doors & Windows Ground to 8th Floor – Status as on 28th February 2023
Utopia Tranquil Tower O : Milestone Release – On Commencement of Doors & Windows Ground to 8th Floor – Status as on 28th February 2023
Utopia Tranquil Tower N : Milestone Release – On commencement of Painting 09th to 17th Floor – Status as on 17th February 2023
Utopia Tranquil Tower O : Milestone Release On Commencement of Flooring 09th to 17th Floor – Status as on 16th February 2023
Utopia Tranquil Tower M : Milestone Release – On Casting of Terrace Floor – Status as on 13th February 2023
Utopia Tranquil Tower Q : Milestone Release – On Commencement of Painting 9th to 17th Floor – Status as on 9th February 2023
Utopia Halcyon Tower I : Milestone Release – Commencement of fixing of doors & windows 18th to 26th Floor – Status as on 2nd February 2023
Utopia Halcyon Tower J : Milestone Release – Commencement of fixing of doors & windows 18th to 26th Floor – Status as on 2nd February 2023
Utopia Tranquil Tower K : Milestone Release – On Commencement Installation of lifts – Status as on 2nd February 2023
Utopia Tranquil Tower O : Milestone Release – On Casting of 24th Floor Slab – Status as on 1st February 2023
Serene View : Structure works completed for all towers. QA works in progress for all towers - Status as of February 2023
Eden : All Towers structure works completed, Internal finishing & external painting in progress - Status as of February 2023
Halcyon : Finishing works. Internal Painting and doors fixing works in progress - Status as of February 2023
Serene View : Structure works completed for all towers. Finishing works in progress for all towers - Status as of January 2023
Eden : All Towers structure works completed, Internal finishing & external painting in progress - Status as of January 2023
Halcyon : Finishing works. Internal Painting and doors fixing works in progress - Status as of January 2023
Utopia Paradise Tower K : Milestone Release – On Casting of 2nd Floor Slab – Status as on 30th January 2023
Utopia Paradise Tower H : Milestone Release – On Casting of 16th Floor Slab – Status as on 28th January 2023
Utopia Tranquil Tower M : Milestone Release – On Commencement of flooring 9th to 17th Floor – Status as on 28th January 2023
Utopia Paradise Tower L : Milestone Release – On Casting of 16th Floor Slab – Status as on 25th January 2023
Utopia Tranquil Tower P : Milestone Release – On Casting of 20th Floor Slab – Status as on 25th January 2023
Utopia Tranquil Tower O : Milestone Release – On Commencement of Flooring – 09th to 17th Floor – Status as on 23rd January 2023
Utopia Tranquil Tower L : Milestone Release – On Commencement of Fixing of doors & Windows – Ground to 8th Floor – Status as on 18th January 2023
Utopia Tranquil Tower L : Milestone Release – On Commencement of Fixing of doors & Windows – Ground to 8th Floor – Status as on 18th January 2023
Utopia Tranquil Tower L : Milestone Release – On Commencement of Fixing of doors & Windows – Ground to 8th Floor – Status as on 18th January 2023
Utopia Tranquil Tower K : Milestone Release – On Commencement of Fixing of doors & Windows – Ground to 8th Floor – Status as on 18th January 2023
Utopia Tranquil Tower K : Milestone Release – On Commencement of Fixing of doors & Windows – Ground to 8th Floor – Status as on 18th January 2023
Utopia Tranquil Tower K : Milestone Release – On Commencement of Fixing of doors & Windows – Ground to 8th Floor – Status as on 18th January 2023
Utopia Tranquil Tower Q : Milestone Release – On Casting of Terrace Slab – Status as on 13th January 2023
Utopia Tranquil Tower P : Milestone Release on Commencement of Fixing of Doors & Windows – Ground to 8th Floor – Status as on 13th January 2023
Utopia Tranquil Tower P : Milestone Release on Commencement of Fixing of Doors & Windows – Ground to 8th Floor – Status as on 13th January 2023
Utopia Tranquil Tower P : Milestone Release on Commencement of Fixing of Doors & Windows – Ground to 8th Floor – Status as on 13th January 2023
Utopia Tranquil Tower P : Milestone Release on Commencement of Fixing of Doors & Windows – Ground to 8th Floor – Status as on 13th January 2023
Utopia Halcyon Tower J : Milestone Release - On Commencement of Painting 9th to 17th Floor – Status as on 10th January 2023
Utopia Tranquil Tower N : Milestone Release – On Commencement of Fixing of doors & Windows Ground to 8th Floor – Status as on 6th January 2023
Utopia Tranquil Tower N : Milestone Release – On Commencement of Fixing of doors & Windows Ground to 8th Floor – Status as on 6th January 2023
Utopia Tranquil Tower Q : Milestone Release – On Commencement of Fixing of Doors & Windows Ground to 8th Floor – Status as on 5th January 2023