Paradise : Structure works in progress - Status as of December 2023
Paradise : Podium slab works in progress - Status as of December 2023
Paradise Tower G : BA units Above terrace works in progress - Status as of December 2023
Paradise Tower I : BA units Swimming pool works in progress - Status as of December 2023
Paradise Tower K : BA units structure works in progress - Status as of December 2023
Paradise Tower L : BA units structure works completed and Finishing works in progress - Status as of December 2023
Paradise Tower K : BA units structure works in progress – Status as on 31st December 2023
Paradise Tower I : BA units Swimming pool works in progress – Status as on 31st December 2023
Paradise Tower G : BA units Above terrace works in progress – Status as on 31st December 2023
Paradise : Podium slab works in progress – Status as on 31st December 2023
Paradise : Structure works in progress – Status as on 31st December 2023
Halcyon Corridor : QA Certification Works in progress – Status as on 31st December 2023
Halcyon Staircase : QA Certification Works in progress – Status as on 31st December 2023
Halcyon : West Elevation – Status as on 31st December 2023
Tranquil : Internal units QA certification works in progress – Status as on 31st December 2023
Tranquil : External painting works in progress – Status as on 31st December 2023
Tranquil : Podium waterproofing and screed works in progress – Status as on 31st December 2023
Utopia Paradise Towers H and F : Milestone Release Fixing of Doors and Windows – Status as on 8th December 2023
Utopia Paradise Towers H and F : Milestone Release Fixing of Doors and Windows – Status as on 8th December 2023
Utopia Paradise Towers H and F : Milestone Release Fixing of Doors and Windows – Status as on 8th December 2023
Utopia Paradise Towers H and F : Milestone Release Fixing of Doors and Windows – Status as on 8th December 2023
Utopia Paradise Tower L : Milestone Release On Casting of Terrace Slab – Status as on 24nd November 2023
Utopia Tranquil Tower M : Milestone Release Commencement of fixing of d & w-18 to 26th Floor – Status as on 22nd November 2023
Utopia Tranquil Tower M : Milestone Release Commencement of fixing of d & w-18 to 26th Floor – Status as on 22nd November 2023
Utopia Tranquil Tower M : Milestone Release Commencement of fixing of d & w-18 to 26th Floor – Status as on 22nd November 2023
Utopia Tranquil Tower O : Milestone Release Commencement of fixing of d & w-18 to 26th Floor – Status as on 11th November 2023
Utopia Tranquil Tower O : Milestone Release Commencement of fixing of d & w-18 to 26th Floor – Status as on 11th November 2023
Utopia Tranquil Tower O : Milestone Release Commencement of fixing of d & w-18 to 26th Floor – Status as on 11th November 2023
Utopia Tranquil Tower O : Milestone Release Commencement of fixing of d & w-18 to 26th Floor – Status as on 11th November 2023
Utopia Tranquil Tower O : Milestone Release Commencement of fixing of d & w-18 to 26th Floor – Status as on 11th November 2023
Serene : West View - Status as of November 2023
Serene : East Garden View - Status as of November 2023
Serene : CA area (sports area) structure works in progress - Status as of November 2023
Serene : Badminton Court flooring works in progress - Status as of November 2023
Eden : South and West Elevation - Status as of November 2023
Eden : Corridor QA certification works in progress - Status as of November 2023
Eden : Staircase QA certification works in progress - Status as of November 2023
Eden : North Central Spine - Status as of November 2023
Eden : Mia-waki - Status as of November 2023
Halcyon : East Elevation - Status as of November 2023
Halcyon : Staircase – Readiness for QA Certification Works in progress - Status as of November 2023
Halcyon : Corridor – Readiness for QA Certification Works in progress - Status as of November 2023
Paradise : Structure works in progress - Status as of November 2023
Paradise : Podium slab works in progress - Status as of November 2023
Paradise Tower G : BA units structure works in progress - Status as of November 2023
Paradise Tower K : BA units structure works in progress - Status as of November 2023
Paradise Tower I : BA units structure works in progress - Status as of November 2023
Tranquil : Podium waterproofing and screed works in progress - Status as of November 2023
Tranquil : Podium upstand RC works in progress - Status as of November 2023
Tranquil : External painting works in progress - Status as of November 2023
Tranquil : Internal units QA certification works in progress - Status as of November 2023
Utopia Tranquil Tower M : Milestone Release - On Commencement of Painting Works 18 to 26th floor – Status as on 10th October 2023
Utopia Tranquil Tower M : Milestone Release - On Commencement of Painting Works 18 to 26th floor – Status as on 10th October 2023
Utopia Tranquil Tower M : Milestone Release - On Commencement of Painting Works 18 to 26th floor – Status as on 10th October 2023
Utopia Paradise Tower K : Milestone Release On Casting of 8th Floor Slab – Status as on 11th October 2023
Serene : North West Elevation - Status as of October 2023
Serene : South-west View - Status as of October 2023
Serene : East side View - Status as of October 2023
Serene : CA area (Sports area) structure works in progress - Status as of October 2023
Serene : East Garden area compound wall works in progress - Status as of October 2023
Eden : South and West Elevation - Status as of October 2023
Eden : Corridor QA certification works in progress - Status as of October 2023
Eden : Staircase QA certification works in progress - Status as of October 2023
Eden : Terrace QA certification works in progress - Status as of October 2023
Eden : North Central Spine - Status as of October 2023
Halcyon : East/North Elevation - Status as of October 2023
Halcyon : Staircase – Readiness for QA Certification Works in progress - Status as of October 2023
Halcyon : Corridor – Readiness for QA Certification Works in progress - Status as of October 2023
Tranquil : Podium waterproofing and screed works in progress - Status as of October 2023
Tranquil : Podium upstand RC works in progress - Status as of October 2023
Tranquil : External painting works in progress - Status as of October 2023
Tranquil : Entrance lobby Glazing works in progress - Status as of October 2023
Paradise : Structure works in progress - Status as of October 2023
Paradise : Podium slab works in progress - Status as of October 2023
Paradise : Tower G – BA units structure works in progress - Status as of October 2023
Paradise : Tower K – BA units structure works in progress - Status as of October 2023
Paradise : Tower I – BA units structure works in progress - Status as of October 2023
Utopia Tranquil Tower O : Milestone Release On Commencement of Painting 18th to 26th Floor – Status as on 27th September 2023
Utopia Tranquil Tower N : Milestone Release – On Commencement of Painting 18th to 26th Floor – Status as on 23rd September 2023
Utopia Tranquil Tower N : Milestone Release – On Commencement of Painting 18th to 26th Floor – Status as on 23rd September 2023
Utopia Tranquil Tower N : Milestone Release – On Commencement of Painting 18th to 26th Floor – Status as on 23rd September 2023
Utopia Tranquil Tower L : Building (UT 05) Milestone Update On Commencement of Painting Works - 18 to 23 FL – Status as on 22nd September 2023
Utopia Tranquil Tower L : Building (UT 05) Milestone Update On Commencement of Painting Works - 18 to 23 FL – Status as on 22nd September 2023
Utopia Tranquil Tower L : Building (UT 05) Milestone Update On Commencement of Painting Works - 18 to 23 FL – Status as on 22nd September 2023
Utopia Paradise Tower K : Milestone Release On Casting of 6th to 7th Floor Slab – Status as on 20th September 2023
Utopia Paradise Tower F : Milestone Release On commencement of flooring - 9th to 17th Floor – Status as on 16th September 2023
Utopia Paradise Tower F : Milestone Release On commencement of flooring - 9th to 17th Floor – Status as on 16th September 2023
Utopia Paradise Tower F : Milestone Release On commencement of flooring - 9th to 17th Floor – Status as on 16th September 2023
Utopia Paradise Tower F : Milestone Release On commencement of flooring - 9th to 17th Floor – Status as on 16th September 2023
Utopia Paradise Tower F : Milestone Release On commencement of flooring - 9th to 17th Floor – Status as on 16th September 2023
Utopia Paradise Tower F : Milestone Release On commencement of flooring - 9th to 17th Floor – Status as on 16th September 2023
Utopia Paradise Tower H : Milestone Release On commencement of flooring - 9th to 17th Floor – Status as on 16th September 2023
Utopia Paradise Tower H : Milestone Release On commencement of flooring - 9th to 17th Floor – Status as on 16th September 2023
Utopia Paradise Tower H : Milestone Release On commencement of flooring - 9th to 17th Floor – Status as on 16th September 2023
Utopia Paradise Tower H : Milestone Release On commencement of flooring - 9th to 17th Floor – Status as on 16th September 2023
Utopia Paradise Tower J : Milestone Release On commencement of flooring - 9th to 17th Floor – Status as on 16th September 2023
Utopia Paradise Tower J : Milestone Release On commencement of flooring - 9th to 17th Floor – Status as on 16th September 2023
Utopia Paradise Tower L : Milestone Release On commencement of flooring - 9th to 17th Floor – Status as on 16th September 2023
Utopia Paradise Tower L : Milestone Release On commencement of flooring - 9th to 17th Floor – Status as on 16th September 2023
Utopia Paradise Tower L : Milestone Release On commencement of flooring - 9th to 17th Floor – Status as on 16th September 2023
Utopia Paradise Tower L : Milestone Release On commencement of flooring - 9th to 17th Floor – Status as on 16th September 2023
Utopia Paradise Tower L : Milestone Release On commencement of flooring - 9th to 17th Floor – Status as on 16th September 2023
Utopia Tranquil Tower L : Milestone Release On Commencement of fixing of d & w-18 to 26th Floor – Status as on 9th September 2023
Utopia Tranquil Tower L : Milestone Release On Commencement of fixing of d & w-18 to 26th Floor – Status as on 9th September 2023
Utopia Tranquil Tower L : Milestone Release On Commencement of fixing of d & w-18 to 26th Floor – Status as on 9th September 2023
Utopia Tranquil Tower M : Milestone Release On Commencement of flooring 18th to 26th Floor – Status as on 6th September 2023
Utopia Tranquil Tower M : Milestone Release On Commencement of flooring 18th to 26th Floor – Status as on 6th September 2023
Utopia Tranquil Tower M : Milestone Release On Commencement of flooring 18th to 26th Floor – Status as on 6th September 2023
Utopia Tranquil Tower M : Milestone Release On Commencement of flooring 18th to 26th Floor – Status as on 6th September 2023
Utopia Paradise Tower G : Milestone Release On Casting of 08th Floor Slab – Status as on 1st September 2023
Utopia Paradise Tower F : Milestone Release On Casting of Terrace Slab – Status as on 1st September 2023
Serene : North West Elevation - Status as of September 2023
Serene : South-west View - Status as of September 2023
Serene : East side View - Status as of September 2023
Serene : CA area (Sports area) structure works in progress - Status as of September 2023
Serene : East Garden area compound wall works in progress - Status as of September 2023
Eden : North and West Elevation - Status as of September 2023
Eden : Corridor QA certification works in progress - Status as of September 2023
Eden : Staircase QA certification works in progress - Status as of September 2023
Eden : False ceiling works in corridor floors of commercial blocks - Status as of September 2023
Eden : North Central Spine - Status as of September 2023
Eden : East Garden pathway works - Status as of September 2023
Halcyon : East/North Elevation - Status as of September 2023
Halcyon : South side Elevation - Status as of September 2023
Halcyon : West Side elevation - Status as of September 2023
Paradise : Structure works in progress - Status as of September 2023
Paradise : Podium slab works in progress - Status as of September 2023
Paradise Tower G : BA units structure works in progress - Status as of September 2023
Paradise Tower I : BA units structure works in progress - Status as of September 2023
Paradise Tower K : Trench slab works in progress - Status as of September 2023
Tranquil : Courtyard waterproofing and screed works in progress - Status as of September 2023
Tranquil : Podium upstand RC works in progress - Status as of September 2023
Tranquil : Drop-off area paver works in progress - Status as of September 2023
Tranquil : Staircase flooring Works in progress - Status as of September 2023
Tranquil : External painting works in progress - Status as of September 2023
Tranquil : Podium waterproofing works in progress - Status as of September 2023
Utopia Paradise Tower F : Milestone Release – On Commencement of flooring GF to 8th floor – Status as on 28th August 2023
Utopia Paradise Tower F : Milestone Release – On Commencement of flooring GF to 8th floor – Status as on 28th August 2023
Utopia Paradise Tower H : Milestone Release – On Commencement of flooring GF to 8th floor – Status as on 28th August 2023
Utopia Paradise Tower H : Milestone Release – On Commencement of flooring GF to 8th floor – Status as on 28th August 2023
Utopia Paradise Tower J : Milestone Release – On Commencement of flooring Ground to 8th Floor – Status as on 21st August 2023
Utopia Paradise Tower J : Milestone Release – On Commencement of flooring Ground to 8th Floor – Status as on 21st August 2023
Utopia Paradise Tower L : Milestone Release – On Commencement of flooring Ground to 8th Floor – Status as on 21st August 2023
Utopia Paradise Tower H : Milestone Release – On Casting of Terrace Slab – Status as on 21st August 2023
Utopia Paradise Tower J : Milestone Release On Casting of terrace slab – Status as on 18th August 2023
Utopia Tranquil Tower N : Milestone Release – On Commencement of fixing of Doors & Windows 18th to 26th Floor – Status as on 18th August 2023
Utopia Tranquil Tower N : Milestone Release – On Commencement of fixing of Doors & Windows 18th to 26th Floor – Status as on 18th August 2023
Utopia Tranquil Tower P : Milestone Release – On Commencement of Painting 18th to 26th Floor – Status as on 17th August 2023
Utopia Tranquil Tower P : Milestone Release – On Commencement of Painting 18th to 26th Floor – Status as on 17th August 2023
Utopia Tranquil Tower P : Milestone Release – On Commencement of flooring 18th to 26th Floor – Status as on 17th August 2023
Utopia Tranquil Tower O : Milestone Release On Commencement of installation of lifts – Status as on 17th August 2023
Utopia Tranquil Tower P : Milestone Release – On Commencement of Installation of Lifts – Status as on 16th August 2023
Utopia Tranquil Tower P : Milestone Release – On Commencement of Installation of Lifts – Status as on 16th August 2023
Utopia Tranquil Tower P : Milestone Release – On Commencement of Installation of Lifts – Status as on 16th August 2023
Utopia Tranquil Tower K : Milestone Release – On Commencement of Fixing of Doors & Windows 18th to 26th Floor – Status as on 9th August 2023
Utopia Tranquil Tower K : Milestone Release – On Commencement of Fixing of Doors & Windows 18th to 26th Floor – Status as on 9th August 2023
Utopia Tranquil Tower Q : Milestone Release – On commencement of Fixing of Doors and windows - 18th-26th floor – Status as on 3rd August 2023
Utopia Tranquil Tower Q : Milestone Release – On commencement of Fixing of Doors and windows - 18th-26th floor – Status as on 3rd August 2023
Serene : North West Elevation - Status as of August 2023
Serene : South-west View - Status as of August 2023
Serene : South central spine Top View - Status as of August 2023
Serene : East side View - Status as of August 2023
Serene : CA area (Sports area) structure works in progress - Status as of August 2023
Serene : East Garden area compound wall works in progress - Status as of August 2023
Eden : West Elevation - Status as of August 2023
Eden : Corridor QA certification works in progress - Status as of August 2023
Eden : False ceiling works in corridor floors of commercial blocks - Status as of August 2023
Eden : North Central Spine - Status as of August 2023
Eden : East Garden pathway works - Status as of August 2023
Halcyon : East/North Elevation - Status as of August 2023
Halcyon : East side Elevation - Status as of August 2023
Halcyon : Internal flats QA certification works in progress - Status as of August 2023
Halcyon : Corridor and staircase painting works in progress - Status as of August 2023
Clubhouse : Bird Eye View - Status as of August 2023
Clubhouse : Status as of August 2023
Clubhouse : East Elevation - Status as of August 2023
Clubhouse : Swimming pool QA Inspection in progress - Status as of August 2023
Paradise : Structure works in progress - Status as of August 2023
Paradise : Podium slab works in progress - Status as of August 2023
Paradise Tower G : BA units structure works in progress - Status as of August 2023
Paradise Tower I : BA units structure works in progress - Status as of August 2023
Paradise Tower K : Trench slab works in progress - Status as of August 2023
Tranquil : Courtyard waterproofing and screed works in progress - Status as of August 2023
Tranquil : Podium upstand RC works in progress - Status as of August 2023
Tranquil : Drop-off area paver works in progress - Status as of August 2023
Tranquil : Staircase flooring Works in progress - Status as of August 2023
Tranquil : External painting works in progress - Status as of August 2023
Tranquil : Entrance lobby ID works in progress - Status as of August 2023
Tranquil : Podium waterproofing works in progress - Status as of August 2023
Serene : Top View - Status as of July 2023
Serene : South-West View - Status as of July 2023
Serene : South central spine Top View - Status as of July 2023
Serene : East Side View - Status as of July 2023
Serene : Corridor QA certification works in progress - Status as of July 2023
Serene : CA area (Sports area) structure works in progress - Status as of July 2023
Serene : East Garden area compound wall works in progress - Status as of July 2023
Eden : West Elevation - Status as of July 2023
Eden : Corridor QA certification works in progress - Status as of July 2023
Eden : Corridor and staircase QA certification works in progress - Status as of July 2023
Clubhouse : Bird Eye View - Status as of July 2023
Clubhouse : QA certification works in progress - Status as of July 2023
Clubhouse : East Elevation - Status as of July 2023
Clubhouse : Swimming pool QA Inspection in progress - Status as of July 2023
Halcyon : East Elevation - Status as of July 2023
Halcyon : West & North side Elevation - Status as of July 2023
Paradise : Structure works in progress - Status as of July 2023
Paradise : Podium slab works in progress - Status as of July 2023
Paradise Tower G : BA units structure works in progress - Status as of July 2023
Paradise Tower I : BA units structure works in progress - Status as of July 2023
Paradise Tower K : Trench slab works in progress - Status as of July 2023
Tranquil : Courtyard waterproofing and screed works in progress - Status as of July 2023
Tranquil : Podium upstand RC works in progress - Status as of July 2023
Tranquil : External painting works in progress - Status as of July 2023
Tranquil : Corridor flooring Works in progress - Status as of July 2023
Tranquil : Flats QA Certification works in progress - Status as of July 2023
Tranquil : Entrance lobby ID works in progress - Status as of July 2023
Tranquil : Clay tiling works in progress - Status as of July 2023
Utopia Paradise Tower F : Milestone Release – On Casting of 24th Floor Slab – Status as on 18th July 2023
Utopia Paradise Tower I : Milestone Release – On Casting of 8th Floor Slab – Status as on 18th July 2023
Utopia Paradise Tower H : Milestone Release – On Casting of 24th Floor Slab – Status as on 17th July 2023
Utopia Tranquil Tower K : Milestone Release On commencement of Painting Works 18th Floor to 26th Floor – Status as on 11th June 2023
Utopia Tranquil Tower O : Milestone Release - On commencement of Doors and windows 9th-18th floor – Status as on 10th June 2023
Utopia Tranquil Tower Q : Milestone Release – On commencement of Painting works 19-26thh floors – Status as on 10th June 2023
Utopia Paradise Tower J : Milestone Release – On Casting of 24th Floor Slab – Status as on 7th July 2023
Utopia Paradise Tower L : Milestone Release – On Casting of 24th Floor Slab – Status as on 24th June 2023
Utopia Tranquil Tower P : Milestone Release – On Commencement of Painting 9 to 17th Floor – Status as on 9th June 2023
Utopia Tranquil Tower P : Milestone Release – On Commencement of Painting 9 to 17th Floor – Status as on 9th June 2023
Utopia Tranquil Tower P : Milestone Release – Commencement of fixing of d & w 9 to 17th Floor – Status as on 9th June 2023
Utopia Tranquil Tower P : Milestone Release – On Commencement of Painting 9 to 17th Floor – Status as on 9th June 2023
Utopia Tranquil Tower Q : Milestone Release - On commencement of flooring 18 to 26th Floor – Status as on 9th June 2023
Utopia Paradise Tower G: Milestone Release – On Casting of 6th and 7th Floor Slab – Status as on 7th June 2023
Utopia Tranquil Tower M : Milestone Release – On Commencement of Installation of Lifts – Status as on 3rd June 2023
Utopia Tranquil Tower M : Milestone Release – On Commencement of Painting 9th to 17th Floor – Status as on 3rd June 2023
Utopia Tranquil Tower M : Milestone Release – On Commencement of Fixing of Doors & Windows – Status as on 3rd June 2023
Paradise : Status as of June 2023
Eden : Corridor QA Works in Progress - Status as of June 2023
Eden : Corridor QA Certification works in progress - Status as of June 2023
Eden : External East Garden/Mia-wakyWorks - Status as of June 2023
Eden : External East Garden/Mia-wakyWorks - Status as of June 2023
Eden : External North spine Works - Status as of June 2023
Clubhouse - Status as of June 2023
Clubhouse - Status as of June 2023
Clubhouse - Status as of June 2023
Clubhouse : Transformer Yard WIP - Status as of June 2023
Halcyon : External painting works in verge of completion - Status as of June 2023
Halcyon - Status as of June 2023
Halcyon : Internal QA Certification WIP - Status as of June 2023
Halcyon : Internal QA Certification WIP - Status as of June 2023
Halcyon : Corridor finishing WIP - Status as of June 2023
Halcyon : GIS Building. QA works in progress - Status as of June 2023
Halcyon : GIS Building. QA works in progress - Status as of June 2023
Halcyon : GIS Building - Status as of June 2023
Halcyon : GIS Building. Transformer yard works in verge of completion - Status as of June 2023
Serene View : QA works in progress in verge of completion - Status as of June 2023
Serene : QA works in progress in verge of completion - Status as of June 2023
Serene : South Central Spine - Status as of June 2023
Serene : East Garden Area - Status as of June 2023
Serene : CA area works - Status as of June 2023
Tranquil : Structure completed - Status as of June 2023
Tranquil : Door fixing and uPVC Windows WIP - Status as of June 2023
Tranquil : Finishing WIP - Status as of June 2023
Tranquil : External Painting WIP - Status as of June 2023
Tranquil : External Painting WIP - Status as of June 2023
Tranquil : Courtyard podium Waterproofing & screed WIP - Status as of June 2023
Utopia Tranquil Tower Q : Milestone Release - On commencement of fixing of Doors and windows 9th to 17th floor – Status as on 31st May 2023
Utopia Tranquil Tower Q : Milestone Release - On commencement of fixing of Doors and windows 9th to 17th floor – Status as on 31st May 2023
Utopia Tranquil Tower Q : Milestone Release – On commencement of installation of lifts – Status as on 31st May 2023
Utopia Tranquil Tower N : Milestone Release – On commencement of Doors and windows 9th to 17th floor – Status as on 27th May 2023
Utopia Tranquil Tower N : Milestone Release – On commencement of Doors and windows 9th to 17th floor – Status as on 27th May 2023
Utopia Tranquil Tower N : Milestone Release – On commencement of Doors and windows 9th to 17th floor – Status as on 27th May 2023
Utopia Tranquil Tower N : Milestone Release - On commencement of flooring 18th to 26th floor – Status as on 27th May 2023
Utopia Tranquil Tower N : Milestone Release - On commencement of flooring 18th to 26th floor – Status as on 27th May 2023
Utopia Tranquil Tower O : Milestone Release – On Commencement of Flooring 18th to 26th Floor – Status as on 27th May 2023
Utopia Paradise Tower F: Milestone Release – On Casting of 20th Floor Slab – Status as on 22nd May 2023
Utopia Paradise Tower K : Milestone Release – On Casting of 04th Floor Slab – Status as on 15th May 2023
Utopia Paradise Tower I : Milestone Release On Casting of 6th/7th Floor Slab – Status as on 5th May 2023
Utopia Paradise Tower J: Milestone Release On Casting of 20th Floor Slab – Status as on 5th May 2023
Serene View : QA works in progress in 3 towers. Completed in 8/11 towers - Status as of May 2023
Serene View : QA works in progress in 3 towers. Completed in 8/11 towers - Status as of May 2023
Serene : South Central Spine - Status as of May 2023
Serene : East Garden Area - Status as of May 2023
Serene : CA area works - Status as of May 2023
Halcyon : External painting works in verge of completion - Status as of May 2023
Halcyon : Internal QA certification WIP - Status as of May 2023
Halcyon : Entrance Lobby WIP - Status as of May 2023
Halcyon : Entrance Lobby WIP - Status as of May 2023
Halcyon : GIS Building Finishing works in progress - Status as of May 2023
Halcyon : GIS Building - Status as of May 2023
Halcyon : GIS Building. Transformer yard works in progress - Status as of May 2023
Eden : Corridor QA Works in Progress - Status as of May 2023
Eden : External Facade works in progress - Status as of May 2023
Eden : External East Garden/Mia-wakyWorks - Status as of May 2023
Eden : External East Garden/Mia-wakyWorks - Status as of May 2023
Eden : External North spine Works - Status as of May 2023
Paradise - Status as of May 2023
Clubhouse - Status as of May 2023
Clubhouse : External painting works in progress - Status as of May 2023
Clubhouse : Swimming Pool works in progress - Status as of May 2023
Clubhouse : Entrance Portal Cladding WIP - Status as of May 2023
Tranquil : Structure completed - Status as of May 2023
Tranquil : Door fixing and uPVC Windows WIP - Status as of May 2023
Tranquil : Finishing WIP - Status as of May 2023
Tranquil : External Painting WIP - Status as of May 2023
Tranquil : External Painting WIP - Status as of May 2023
Tranquil : East & South side podium Waterproofing & screed WIP - Status as of May 2023
Utopia Tranquil Tower K : Milestone Release – On commencement of flooring 18th to 26th Floor – Status as on 21st April 2023
Utopia Tranquil Tower K : Milestone Release – On commencement of flooring 18th to 26th Floor – Status as on 21st April 2023
Utopia Tranquil Tower K : Milestone Release – On commencement of flooring 18th to 26th Floor – Status as on 21st April 2023
Utopia Tranquil Tower K : Milestone Release – On commencement of flooring 18th to 26th Floor – Status as on 21st April 2023
Utopia Tranquil Tower M : Milestone Release – Commencement of Fixing of Doors & Window GF Floor to 8th Floor – Status as on 21st April 2023
Utopia Tranquil Tower M : Milestone Release – Commencement of Fixing of Doors & Window GF Floor to 8th Floor – Status as on 21st April 2023
Utopia Tranquil Tower L : Milestone Release – On Commencement of Flooring 18th to 26th Floor – Status as on 21st April 2023
Utopia Tranquil Tower L : Milestone Release – On Commencement of Fixing of Doors & Windows 08th to 17th Floor – Status as on 21st April 2023
Utopia Tranquil Tower L : Milestone Release – On Commencement of Fixing of Doors & Windows 08th to 17th Floor – Status as on 21st April 2023
Utopia Tranquil Tower K : Milestone Release – On Commencement of Fixing of Doors & Windows 09th to 17th Floor – Status as on 21st April 2023
Utopia Tranquil Tower K : Milestone Release – On Commencement of Fixing of Doors & Windows 09th to 17th Floor – Status as on 21st April 2023
Utopia Tranquil Tower P : Milestone Release – On Casting of Terrace Slab – Status as on 17th April 2023
Utopia Paradise Tower H : Milestone release On Casting of 20th Floor Slab – Status as on 5th April 2023
Clubhouse - Status as of April 2023
Clubhouse : External painting works in progress - Status as of April 2023
Clubhouse : Billiards court area - Status as of April 2023
Clubhouse : Multipurpose Hall - Status as of April 2023
Clubhouse : Swimming Pool works in progress - Status as of April 2023
Arcadia : Above terrace WIP - Status as of April 2023
Arcadia : External painting WIP - Status as of April 2023
Arcadia : External plastering WIP - Status as of April 2023
Paradise - Status as of April 2023
Elysium : 2nd floor and 6th floor works in progress - Status as of April 2023
Elysium : 2nd floor Column and wall works in Progress - Status as of April 2023
Amoeba : GF Slab casting completed - Status as of April 2023
Eden : Corridor QA Works in Progress - Status as of April 2023
Eden : External Facade works in progress - Status as of April 2023
Eden : External East Garden/Mia-wakyWorks - Status as of April 2023
Eden : External East Garden/Mia-wakyWorks - Status as of April 2023
Eden : External North spine Works - Status as of April 2023
Eden : External North spine Works - Status as of April 2023
Eden : Kids play area - Status as of April 2023
Eden - Status as of April 2023
Halcyon : External painting works in verge of completion - Status as of April 2023
Halcyon : External painting works in verge of completion - Status as of April 2023
Halcyon : Finishing works. QA Certification works in progress - Status as of April 2023
Halcyon : Finishing works. Entrance Lobby - Status as of April 2023
Halcyon : Finishing works. Corridor finishing works in progress - Status as of April 2023
Halcyon : GIS Building - Status as of April 2023
Halcyon : GIS Building. Transformer yard works in progress - Status as of April 2023
Halcyon : GIS Building. Finishing works in progress - Status as of April 2023
Utopia Paradise Tower F : Milestone Release On Casting of 16th Floor Slab – Status as on 31st March 2023
Utopia Paradise Tower L : Milestone Release – On Casting of 20th Floor Slab – Status as on 29th March 2023
Utopia Paradise Tower J : Milestone Release – On Casting of 16th Floor Slab – Status as on 21st March 2023
Utopia Tranquil Tower N : Milestone Release – On Commencement of Installation of Lifts – Status as on 17th March 2023
Utopia Tranquil Tower O : Milestone Release – On Casting of Terrace Slab – Status as on 16th March 2023
Utopia Tranquil Tower P : Milestone Release – On Casting of 24th Floor slab – Status as on 13th March 2023
Serene View : Structure works completed for all towers. QA works in progress for all towers - Status as of March 2023
Serene : Entrance lobby - Status as of March 2023
Serene : Finishing works in Progress - Status as of March 2023
Serene : Central Spine Softscaping works - Status as of March 2023
Serene : Central Spine Pavilion flooring works - Status as of March 2023
Serene : Senior Citizen Courtyard - Status as of March 2023
Serene : Kids play area works - Status as of March 2023
Serene : Central Spine Mound plantation WIP - Status as of March 2023
Eden : All Towers structure works completed, Internal finishing & external painting in progress - Status as of March 2023
Eden : External painting works in progress - Status as of March 2023
Eden : External Facade works in progress - Status as of March 2023
Eden : External East Garden/Mia-wakyWorks - Status as of March 2023
Eden : External North spine Works - Status as of March 2023
Eden : External North spine Works - Status as of March 2023
Eden : Kids play area - Status as of March 2023
Eden : Senior Citizen Courtyard - Status as of March 2023
Tranquil – Status as of March 2023
Tranquil : Finishing WIP – Status as of March 2023
Tranquil : Door fixing and uPVC Windows WIP – Status as of March 2023
Tranquil : External Painting WIP – Status as of March 2023
Tranquil : External Painting WIP – Status as of March 2023
Tranquil : East Side podium Waterproofing & screed WIP – Status as of March 2023
Arcadia : Above terrace WIP - Status as of March 2023
Arcadia : External plastering WIP - Status as of March 2023
Arcadia : Refuge terrace works completed - Status as of March 2023
Paradise - Status as of March 2023
Elysium : 2nd floor and 6th floor works in progress - Status as of March 2023
Elysium : 2nd floor Column and wall works in Progress - Status as of March 2023
Clubhouse : Structure works completed and finishing works in progress - Status as of March 2023
Clubhouse : Finishing works in verge of completion - Status as of March 2023
Clubhouse : External painting works in progress - Status as of March 2023
Clubhouse : Glazing works in Verge of completion - Status as of March 2023
Clubhouse : Swimming Pool works in progress - Status as of March 2023
Halcyon : External painting works in verge of completion - Status as of March 2023
Halcyon : External painting works in verge of completion - Status as of March 2023
Halcyon : Finishing works - Status as of March 2023
Halcyon : Finishing works. Common area works in progress - Status as of March 2023
Utopia Tranquil Tower K : Milestone Release – On Commencement of Painting works 9th to 17th Floor – Status as on 28th February 2023
Utopia Tranquil Tower K : Milestone Release – On Commencement of Painting works 9th to 17th Floor – Status as on 28th February 2023
Utopia Tranquil Tower L : Milestone Release – On Commencement of Painting works 9th to 17th Floor – Status as on 28th February 2023
Utopia Tranquil Tower O : Milestone Release – On Commencement of Doors & Windows Ground to 8th Floor – Status as on 28th February 2023
Utopia Tranquil Tower O : Milestone Release – On Commencement of Doors & Windows Ground to 8th Floor – Status as on 28th February 2023
Utopia Tranquil Tower O : Milestone Release – On Commencement of Doors & Windows Ground to 8th Floor – Status as on 28th February 2023
Utopia Tranquil Tower N : Milestone Release – On commencement of Painting 09th to 17th Floor – Status as on 17th February 2023
Utopia Tranquil Tower O : Milestone Release On Commencement of Flooring 09th to 17th Floor – Status as on 16th February 2023
Utopia Tranquil Tower M : Milestone Release – On Casting of Terrace Floor – Status as on 13th February 2023
Utopia Tranquil Tower Q : Milestone Release – On Commencement of Painting 9th to 17th Floor – Status as on 9th February 2023
Utopia Halcyon Tower I : Milestone Release – Commencement of fixing of doors & windows 18th to 26th Floor – Status as on 2nd February 2023
Utopia Halcyon Tower J : Milestone Release – Commencement of fixing of doors & windows 18th to 26th Floor – Status as on 2nd February 2023
Utopia Tranquil Tower K : Milestone Release – On Commencement Installation of lifts – Status as on 2nd February 2023
Utopia Tranquil Tower O : Milestone Release – On Casting of 24th Floor Slab – Status as on 1st February 2023
Serene View : Structure works completed for all towers. QA works in progress for all towers - Status as of February 2023
Serene : Entrance lobby works in Progress - Status as of February 2023
Serene : External Painting WIP - Status as of February 2023
Serene : Finishing works in progress - Status as of February 2023
Serene : Central Spine works - Status as of February 2023
Serene : Central Spine Pavilion flooring works - Status as of February 2023
Serene : Senior Citizen Courtyard - Status as of February 2023
Serene : Kids play area works - Status as of February 2023
Serene : Youngster Courtyard - Status as of February 2023
Serene : Central Spine Mound plantation WIP - Status as of February 2023
Eden : All Towers structure works completed, Internal finishing & external painting in progress - Status as of February 2023
Eden : Internal finishing works in progress - Status as of February 2023
Eden : External Facade works in progress - Status as of February 2023
Eden : External East Garden/Mia-wakyWorks - Status as of February 2023
Eden : External North spine Works - Status as of February 2023
Eden : Kids play area - Status as of February 2023
Eden : Senior Citizen Courtyard - Status as of February 2023
Arcadia : Above terrace WIP - Status as of February 2023
Arcadia : External plastering WIP - Status as of February 2023
Arcadia : Structural steel Works WIP - Status as of February 2023
Paradise - Status as of February 2023
Elysium : 1st floor and 6th floor works in progress - Status as of February 2023
Elysium : 1st floor Slab works in Progress - Status as of February 2023
Halcyon : Structure work completed - Status as of February 2023
Halcyon : External painting WIP - Status as of February 2023
Halcyon : Finishing works. Internal Painting and doors fixing works in progress - Status as of February 2023
Halcyon : Finishing works. Common area works in progress - Status as of February 2023
Tranquil - Status as of February 2023
Tranquil : Corridor and BR flooring WIP - Status as of February 2023
Tranquil : Door fixing and uPVC Wndows WIP - Status as of February 2023
Tranquil : Lift WIP and External grinding WIP - Status as of February 2023
Tranquil : East Side podium Waterproofing & screed WIP - Status as of February 2023
Serene View : Structure works completed for all towers. Finishing works in progress for all towers - Status as of January 2023
Serene : Entrance lobby works in Progress - Status as of January 2023
Serene : Finishing works in Progress - Status as of January 2023
Serene : External Painting WIP - Status as of January 2023
Serene : Central Spine works - Status as of January 2023
Serene : Central Spine Pavilion flooring works - Status as of January 2023
Serene : Senior Citizen Courtyard - Status as of January 2023
Serene : Kids play area works - Status as of January 2023
Serene : Youngster Courtyard - Status as of January 2023
Arcadia : Terrace floor completed - Status as of January 2023
Arcadia : Above Terrace WIP - Status as of January 2023
Arcadia : Above Terrace WIP - Status as of January 2023
Paradise - Status as of January 2023
Paradise - Status as of January 2023
Elysium : 5th floor works in progress - Status as of January 2023
Elysium : GF Slab works in Progress - Status as of January 2023
Clubhouse : Structure works completed and finishing works in progress - Status as of January 2023
Clubhouse : Structure works completed and finishing works in progress - Status as of January 2023
Clubhouse : External painting works in progress - Status as of January 2023
Clubhouse : Facade works in progress - Status as of January 2023
Clubhouse : Interior works in progress - Status as of January 2023
Clubhouse : Interior works in progress - Status as of January 2023
Clubhouse : Interior works in progress - Status as of January 2023
Clubhouse : Staircase works in progress - Status as of January 2023
Clubhouse : Staircase works in progress - Status as of January 2023
Eden : All Towers structure works completed, Internal finishing & external painting in progress - Status as of January 2023
Eden - Status as of January 2023
Eden : External Facade works in progress - Status as of January 2023
Eden : External Entrance lobby Works - Status as of January 2023
Eden : External East Garden/Mia-wakyWorks - Status as of January 2023
Eden : External North spine Works - Status as of January 2023
Eden : Kids play area - Status as of January 2023
Eden : Senior Citizen Courtyard - Status as of January 2023
Halcyon : Structure work completed - Status as of January 2023
Halcyon : Finishing works. Internal Painting and doors fixing works in progress - Status as of January 2023
Halcyon : Finishing works. Common area works in progress - Status as of January 2023
Tranquil - Status as of January 2023
Tranquil : Toilet cladding and flooring WIP - Status as of January 2023
Tranquil : Door fixing and External grinding WIP - Status as of January 2023
Tranquil : East Side podium Waterproofing & screed WIP - Status as of January 2023
Utopia Paradise Tower K : Milestone Release – On Casting of 2nd Floor Slab – Status as on 30th January 2023
Utopia Paradise Tower H : Milestone Release – On Casting of 16th Floor Slab – Status as on 28th January 2023
Utopia Tranquil Tower M : Milestone Release – On Commencement of flooring 9th to 17th Floor – Status as on 28th January 2023
Utopia Paradise Tower L : Milestone Release – On Casting of 16th Floor Slab – Status as on 25th January 2023
Utopia Tranquil Tower P : Milestone Release – On Casting of 20th Floor Slab – Status as on 25th January 2023
Utopia Tranquil Tower O : Milestone Release – On Commencement of Flooring – 09th to 17th Floor – Status as on 23rd January 2023
Utopia Tranquil Tower L : Milestone Release – On Commencement of Fixing of doors & Windows – Ground to 8th Floor – Status as on 18th January 2023
Utopia Tranquil Tower L : Milestone Release – On Commencement of Fixing of doors & Windows – Ground to 8th Floor – Status as on 18th January 2023
Utopia Tranquil Tower L : Milestone Release – On Commencement of Fixing of doors & Windows – Ground to 8th Floor – Status as on 18th January 2023
Utopia Tranquil Tower K : Milestone Release – On Commencement of Fixing of doors & Windows – Ground to 8th Floor – Status as on 18th January 2023
Utopia Tranquil Tower K : Milestone Release – On Commencement of Fixing of doors & Windows – Ground to 8th Floor – Status as on 18th January 2023
Utopia Tranquil Tower K : Milestone Release – On Commencement of Fixing of doors & Windows – Ground to 8th Floor – Status as on 18th January 2023
Utopia Tranquil Tower Q : Milestone Release – On Casting of Terrace Slab – Status as on 13th January 2023
Utopia Tranquil Tower P : Milestone Release on Commencement of Fixing of Doors & Windows – Ground to 8th Floor – Status as on 13th January 2023
Utopia Tranquil Tower P : Milestone Release on Commencement of Fixing of Doors & Windows – Ground to 8th Floor – Status as on 13th January 2023
Utopia Tranquil Tower P : Milestone Release on Commencement of Fixing of Doors & Windows – Ground to 8th Floor – Status as on 13th January 2023
Utopia Tranquil Tower P : Milestone Release on Commencement of Fixing of Doors & Windows – Ground to 8th Floor – Status as on 13th January 2023
Utopia Halcyon Tower J : Milestone Release - On Commencement of Painting 9th to 17th Floor – Status as on 10th January 2023
Utopia Tranquil Tower N : Milestone Release – On Commencement of Fixing of doors & Windows Ground to 8th Floor – Status as on 6th January 2023
Utopia Tranquil Tower N : Milestone Release – On Commencement of Fixing of doors & Windows Ground to 8th Floor – Status as on 6th January 2023
Utopia Tranquil Tower Q : Milestone Release – On Commencement of Fixing of Doors & Windows Ground to 8th Floor – Status as on 5th January 2023
Utopia Tranquil Tower Q : Milestone Release – On Commencement of Fixing of Doors & Windows Ground to 8th Floor – Status as on 5th January 2023
Utopia Tranquil Tower Q : Milestone Release – On Commencement of Fixing of Doors & Windows Ground to 8th Floor – Status as on 5th January 2023